Loading...
HomeMy WebLinkAboutCorrespondencePLEASE NOTE: This is only a TEMPORARY CERTIFICATE OF OCCUPANCY City of Carmel- Clay Township ~coPY Permit#: 1243.99 BUILDER: RDJ Custom Homes PROJECT: 12415 N. Old Meridian St. INCOMPLETE ITEMS: SEE ATTACHED NOTICE OF CORRECTIONS & NOTICE OF VIOLATION REGARDING INCOMPLETE SITE ITEMS. EXPIRES: March 8, 2002 Important Notice: The above listed incomplete item(s) shall be ready and scheduled for inspection on or before the date listed above. If these items are found unsatisfactory at the time of inspection, a $90.00 Commercial re-inspection fee may be assessed. This charge would have to be paid before a second inspection will be scheduled and a Final Certificate of Occupancy issued. This TEMPORARY Certificate of Occupancy is granted with the understanding that the above-referenced item be completed by the date determined, and that an inspection be scheduled and a permanent Certificate of Occupancy be issued. dean /,~~ ~A,/.~ January 29, 2002 tl; Building Commission~'r Date t of Community Services Permit Services inspections can be scheduled at 571-2444. The Fire Marshall can be reached at 571-2619. The Urban Forester/Planning and Zoning Office can be reached at 571-2478. Please contact our office if you are unable to complete any items in the allotted time. CC: File Owner S/permit s/tempcodommerciaIonly NOTICE OF CORRECTIONS --~TE INSPECTION City of Carmel/Clay Township Department of Community Services Carmel, IN 46032 For Re-insPectiOn: (317) 571-2478 Permit #: 1243.99 Builder's Name: RDJ Custom Homes Location of Construction: 12415 N. Old Meridian St. Commercial Shell Building Comments: According to the landscape plan submitted to the Carmel/Clay Plan Commission on 9/21/99, the following omissions have occurred: 1. A landscaped parking lot island is missing at the rear of the building. 2. A total of ten (10) shade trees shown on the plan (in and around the rear parking lot) have not been planted. The parking lot island may be omitted, if the missing landscaping is planted somewhere else on the property. The ten shad trees must be planted somewhere on the property, preferably around the parking lot to provide shade for the asphalt. 3. A sidewalk running along the front of the property near the street has been omitted. 4. Exterior lighting exceeds maximum illumination level. ***A Notice of Violation regarding this item was sent to the site on January 24, 2002. A copy of that notice is attached to this Notice of Correction. Questions regarding this item should be addressed to Adrienne Keeling, Code Enforcement Inspector, at: (317) 571-2423. A $90.00 Commercial re-inspection fee will be assessed. In~pect0r] Scott Brewer / Urban Forester (317) 571-2478 Yes [] No/~ Date: January 29, 2002 CC: JeffKendall: Building Commissioner Scott Brewer: Urban Forester File: Permit Services s:p~ts/eommercial/com. Notice of Co~re~t-SITE City of CarmeYCIay Townskip Department of Community Services Cannel, IN 46032 (317) 571-2444 RECORD # 2002.0016 Location of Violation(s): 12401 Old Meridian Street, Carmel, IN 46032 OWNER or TENANT: Mailing Address: 12400 Old Meridian, LLC, do Coldwell Ba-ker. K,iner 12401 Old Meridian Street, Carmel, IN 46032 Nature of Violation(s): Exterior lighting exceeds m.x-lm,,m ilb,mlnation level Ordinance Section(s) Violated: Carmel/Clay Land Use Regulations, Section 20G.4.4(F) Date/Time of Violation(s): December 15, 2002 Abatement Period: The above viohtion(s) must be fully corrected within ten (10) days of the : date of this notice, Range of possible Fines*: $50.00 - First Violation $100.00 - Second Violation $150.00 - Third Violation $200.00 - Fourth Violation $500.00 - Each Violation in excess of four *Each day a violation remains uncorrected constitutes a separate violation that is subject to a separate fine. These POSSible fines are in addition to any court costs that may be incurred as a result of failure to comply with this notice. Comments: Test revealed in,,mlnafion level at 1.0 foot candle instead of the maximum allowed 0.5 foot candle at the property line. Inspector: Phone: Please contact immediately: Adr~erme Keeling, Cdde Enforcem~£nspect°r (317) 571-2423 TIFIED N O TI CE' RE TURN RE CEI. Wli~~- icm E:\Cod~ .Enforcemm~h~ofices~2002.0016.doc NOTICE OF VIOLATION City of Carmel/Clay Township Department of Community Services Carmel, IN 46032 (317) 571-2dA. d RECORD # 2002.0016 Location of Violation(s): 12401 Old Meridian Street, Carmel, IN 46032 OWNER or TENANT: Mailing Address: 12400 Old Meridian, LLC, c/o Coldwell Banker- Kaiser 12401 Old Meridian Street, Carmel, IN 46032 Nature of Violation(s): Exterior lighting exceeds maximum illnmination level Ordinance Section(s) Violated: Carmel/Clay Land Use Regulations, Section 20G.4.4(F) Date/Time of Violation(s): -~i5, 2002 Abatement Period: The above violation(s) must be fully corrected within ten (10) days of the date of this notice. Range of possible Fines*: $50.00 - First Violation $100.00 - Second Violation $150.00 - Third Violation $200.00 - Fourth Violation $500.00 - Each Violation in excess of four *Each day a violation remains uncorrected constitutes a separate violation that is subject to a separate fine. These possible fines are in addition to any court costs that may be incurred as a result of failure to comply with this notice. Comments: Test revealed illumination level at 1.0 foot candle instead of the maximum allowed 0.5 foot candle at the property line. Please contact immediately: Inspector: , _/.../~[A4Z4,~_,~-~A-~ . Adrienne Keeling,, Cclde Enforcem~Inspector Date: Phone: (317) 571-2423 ~/ NOTICE - RETURN RECEI E:\Code Enforceane~t~Iofice~k2002.0016.doc 1Jepartment o ommtm~ ervlces Property Activity Form Full Ad&ess of Property: 12401 OLD MERIDIAN ST N Date Filled: D1/16/2002 ] Record Number: [~02.0016 Type Of Aofiviiy: Property Owner: Addr~ of .activity: Mailing Address: Phone: ] Name Of Filer ,.:~Rg~c~ LILLIC Ph~e: [571-2421 Multi-tenant ground floor building Tenant identification signage caOSing excessive Ught~g. 2401 OLD MERIDIAN ST N Same As Owner: [] Code violation: Sec 20G.4.4(0 Commentz: Inspection January 15, 2002 by Laurence Lffiig 1.00 foot candle at prope~y line. Code permits 0.5. D1/15/2002 Inspection performed by Laurence Lillig See notes above. AK 01115/'2002 FOR C-sL-"' DATL I~] ~x PHONE C) One Civic Square Carmel, IN ~ (~17) 571-2417 Fax: (317) 571-2426 PW [] U~Je~t [] For Review 0 ~-Comment~,~l-I Please Reply [] Please Recycle KEELER-WEBB ASSOCIATES March 24, 1999 Con,~lting Engin~rs ' Planners' Surveys Mr. Mark Monroe CITY OF CARMEL Dept. of Community Services One Civic Square Carmel, Indiana 46032 Re.: Lot 2/Block 17 Carmel Science and Technology Park 12415 North Old Meridian Street KVVA Project No.: 9812-015 RESPONSE LETTER This letter is being wdtten in response to the comment items made during the March 17, 1999, T.A.C. meeting in regards to the above site. The following items correlate with your comment items during that meeting and have been revised on the construction documents as follows: Parking space size has been revised to reflect that all spaces on the subject site are a minimum of 180 SF of dimensions required per the Ordinance. 2. Exterior photometric contour readings and lighting fixtures have been revised and added to the construction documents. 3. Sign elevation revisions for the wall sign have been revised on the construction documents on Sheet LI. Tree preservation plan has been included in Sheet L1 in regards to the preservation of existing oak trees which will be protected throughout construction. Revisions have been made to the construction documents in regards to the setback of the structure to provide for the required foundation plans along the front elevation of the structure. 1 Indianapolis, IN. Chicago, IL ' St. Louis, MO. Cincinnati, OH. Henderson, KY' Jacksonville. FL The colored renderings submitted to Dept. of Community Services to date have no revisions in regards to the appearance of the structure and/or signage on the structure as reflected by the preliminary elevations and floor plans previously submitted to your office. The front, side and rear elevations of this structure are all identical therefore additional colored renderings are not necessary for this project to be reviewed. The digitally enhanced photographs have been modeled, engineered and designed to most effectively show and represent the true appearance of the proposed structure on the existing site as it will be designed and built. If you have any questions or need additional information, please do not hesitate to contact this office at any time. We forward to the issuance of the Docket Number on this project as soon as possible so that we may send out the required public notices to the adjoining property owners and the newspapers. Respectfully, KEELER-WEBB ASSOCIATES Adam L DeHart, LS Project Manager ALD:mv 2 w\ Ron Houck moved for the suspension of the rules. Unanimously Approved. Rick Sharp moved for the approval of Docket Nos. 27-99 DP/ADLS and 28-99 SP, Greg Dawson and Associates. APPROVED 12-0. llh. Commission to consider Docket No. 29-99 DP/ADLS, Development' Plan and Architectural Design, Landscaping, Lighting, and Signage applications for 12400 Old Meridian, LI,C. The petitioner seeks approval to construct a 15,000 square foot office and apartment building on 2.5 acres. The site is located one lot south of the southeast corner of Carmel Drive and Old Meridian Street (Lot 2, Block 17, Carmel Science and Technology Park.) The site is zoned M-3/Manufacturing. (Petitioner will also be appearing before the Board of Zoning Appeals for consideration ora Developmental Standards Variance.) Filed by Adam Delian of Keeler-Webb Associates. Adam DeHart, 486 Gradle Drive, Carmel appeared before the Commission representing the applicant. Bob Lunsford with RDJ Custom Homes and JeffWorhel of Advantage Medical were also in attendance. Mr. DeHart stated that the petitioner had appeared before the Board of Zoning Appeals yesterday evening, April 26t~, and received approval for a developmental s~andards variance to decrease the required minimum side landscape yard from 10 feet to 0 feet. The subject site is unusual in shape and encompasses 2.43 acres. The site contains a storm sewer easement, (a large pipe running along Meridian Street) and empties adjacent to a box culvert bridge beneath Old Meridian into an open ditch, and flows to the east. The easement accounts for approximately 9/10 of an acre of the property. The size of the structure has been reduced to approximately 14,200 square feet and has allowed for the installation of a 24 foot drive (the length of the property) that wilt connect to future development on Lot 3 for thru traffic from Carmel Drive to Old Meridian and still provide access to parking in the rear. The petitioner has met with the Old Meridian Task Force to review proposals for this area for future requirements. The building will located at closely to the street as possible. There are approximately 20 parking spaces that will be used by clients and customers of the professional building. Advantage Medical will occupy one-third of the building; a tenant lease area for another third of the building, and a real estate company will occupy the final third of the building. The second floor will consist of executive suites with two, some three bedrooms. The petitioner states that this facility complies with the Old Meridian outlook to the future as far as providing professional office with medium to high density housing. The development provides for individual covered carports for each apartment unit. The carports will be open to the north and will be used for cars only-no storage. The carports will match the fagade of the building in brick masonry. The basement of the facility will be used for storage only and will not have any office space. s:~PlancommW/inutcs\pc 1999apr27 4 (_ The development has been built up with berms along the north side of the existing ditch; the site gradually slopes to the south and east. Sanitary sewer setwice has been extended to the site as well as water lines. Mr. DeHa.~ stated that with the exception ora final review completion letter fi.om the Hamilton County Surveyors office, all items have been addressed fi.om the Engineer's office and all other TAC members. The landscape plan has been revised to provide for the new drive alignment, parking, and a 5 foot landscape buffer along the north side of the structure; the parking is hidden at the rear of the building. The petitioner is installing sidewalks along the street and interior walkways. Members of the public were invited to speak in favor or opposition to the proposed development; none appeared and the public hearing was closed. Mark Monroe confirmed that the petitioner was granted a Developmental Standards Variance by the Board of Zoning Appeals. Ron Houck expressed concern with the type of wall pack proposed and thought the lighting was not consistent with the class of development being proposed. Paul Spranger concurred regarding the lighting and encouraged the petitioner to meet with the Department to change the design. Mr. DeHart stated that his client was willing to eliminate the wall pack and install the same type of incandescent, lantern type brass fixture used at the other entrance. Any signage issues will be worked out with the Department. Rick Sharp moved for the suspension of the rules. Unanimously Approved. Ron Houck moved for the approval of Docket No. 29-99 DP/ADLS, 12400 Old Meridian, LLC, subject to the lighting issue being resolved in accordance with the Old Meridian Task Force guidelines. APPROVED 12-0. 12h. Commission to consider Docket No. 30-99 DP/ADLS, Development Plan and Architectural Design, Landscaping, Lighting, and Signage applications for the C & C Realty Company. The petitioner seeks approval to construct a 62,500 square foot office and warehouse complex on 5 acres. The site is located on the west side of Michigan Road, one-eighth mile north of96~ Street. The site is zoned I-l/Industrial and is located partially within the Michigan Road (U.S. 421) Overlay Zone. (Petitioner may also be appearing before the Board of Zoning Appeals for consideration of Developmental Standards Variances.) Filed by Reed Carlson of the C & C Realty Company. s:~Plancomm~vfinut~\pc 1999apr27 5 Memo Tm Ma~, Monme From,' Me#ssa Spiker CC,, Da{e: April 18, 1999 Re~ 12400 N. Old Meddian The following am comments/suggestions written in regards the above project. DOCS Bufferyard guidelines suggest that a bufferyard containing a minimum of 3 shade trees, 5 omamental trees and 21 shrubs per 100 linear f~et be planted between a collector street and a retail/multi-family building. This would apply to the ama along Old Meridian. DOCS Buffe~ard guidelines suggest that a bufferyard containing a minimum of 3 shade trees, 2 ornamental trees and 9 shrubs per 100 linear feet be planted between a retail/multi-family building and vacant propen'y. This would apply to the areas along the north and the south sides oftbe property. · Page 1 KEELER-WEBB ASSOGIATES March 24, 1999 Consulting Engineers · Planners · Surveyors DOteD Mr. Mark Monroe CITY Of CARMEL Dept. of Community Services One Civic Square Carmel, Indiana 46032 Re.: Lot 2/Block 17 Carmel Science and Technology Park 12415 North Old Meridian Street KVVA Project No.: 9812-015 RESPONSE LETTER This letter is being written in response to the comment items made during the March 17, 1999, T.A.C. meeting in regards to the above site. The following items correlate with your comment items during that meeting and have been revised on the construction documents as follows: Parking space size has been revised to reflect that all spaces on the subject site are a minimum of 180 SF of dimensions required per the Ordinance. 2. Exterior photometric contour readings and lighting fixtures have been revised and added to the construction documents. 3. Sign elevation revisions for the wall sign have been revised on the construction documents on Sheet LI. Tree preservation plan has been included in Sheet L1 in regards to the preservation of existing oak trees which will be protected throughout construction. Revisions have been made to the construction documents in regards to the setback of the structure to provide for the required foundation plans along the front elevation of the structure. 1 Indianapolis, IN. Chicago, IL · St. Louis, MO · Cincinnati, OH. Henderson, KY. Jacksonville, FL The colored renderings submitted to Dept. of Community Services to date have no revisions in regards to the appearance of the structure and/or signage on the structure as reflected by the preliminary elevations and floor plans previously submitted to your office. The front, side and rear elevations of this structure are all identical therefore additional colored renderings are not necessary for this project to be reviewed. The digitally enhanced photographs have been modeled, engineered and designed to most effectively show and represent the true appearance of the proposed structure on the existing site as it will be designed and built. If you have any questions or need additional information, please do not hesitate to contact this office at any time. We forward to the issuance of the Docket Number on this project as soon as possible so that we may send out the required public notices to the adjoining property owners and the newspapers. Respectfully, KEELER-WEBB ASSOCIATES Adam L. DeHart, LS Project Manager ALD:mv 2 MAR 18 '99 B3:dlPM P,1/3 March 15, 1999 Adam DeI-Ia.-~ Keeler- Webb Associetes Re: Cannel Sc. ~ Tech. Cfr, Block 17 - Old Meridian Office & Apt, Bldg. This letter is a follow up to the comments that I made at the Carmel TAC meeting and my roview of the plato. 1. An Outlet Request Permit is required for discharge into the WR Fertig Drain. 2. A Non-enfomement P¢iu~it is required where curb & sidewalk areas encroaches on tl~ existing 15' (from top of bank) easement and ~be parking erea along Old Meridian. 3, A Crossing Permit is required for thr entrance. 4. A Crossing Permit is required for the water service crossing, ~. Our records show the Metier Arm of thc Fcrtig Drain is located on this ~ite along Old Meridian. Please show this 35"x 60" pipe and manholes on thc plans. Please also show where this outlets into the open drain. Copies of the drain maps have been ip. cluded with gtis letter. 6. Please label the Fertig chain on the plans. 7, Label the pipc's sizc. 8. Please label the drain's easement. 9. Show tbe parking areas being piped to the open ditch and/or the existing manholes. If you have any questions, please feel fr~ to contact this office at 776~8495. Cc: Carmel DOCS Cannel Eng. NRCS MAR 18 '99 03:4~PM P.~/3 $ 31 0i$ 015.00~' 008 ; ~ OILO0! 08~.001 OZ7 022 0~0 ' 009 002 008 trvet 020.001 CAR8EI,, SCIE~*CE & 'ECRNO~OOY PAR~ 009 OOi 009 037 005 006 OL5 / G' LC. 851,07 \.M,H. /\ .~ M. tt II. 4 20 'x4.0 'x ~2" VF_.RT 1 ~ P. 1/1 K. eel~r- Webb Asso~ia~s Ma:mb 18, I999 Re: Cannel Se, & Tech. Ctr, Block 12 - Thomson lndinna This lette~ is a follow up te lhe comment that I made 1~ the Carmel TAC meeting. l, An Outlet Reqtmst Permit is z~luimd, ~ is classified a~ m~ktng an ind/mct outlet to the Fe.~tig mgahtted drain vi~ exi~dnIt ntorm f~cllitles. If:you hnve any questions, pl~nse feel f'me to contn~ this offioe ~ 776--8495. Pl~t R~viowe~ Co: Carmel DOCS Cn~mel Eng. NRCS 3/16/19~9 84; B? 317-844-9£03 Cloy Township Regional Wa_ste District . ...... ' " Mark Mom13e Cmmel Dem. of Community Cma OMo $clua~e Cam'lef. IN 46032 Dear Regarding tyro agenda items fur the March 17, 1999 TAC meeting, I offer the follo~ng for your use, Comments am included only for the projects which am located in the OH Meridian Olfic~ ami Apmmwm Building P~ans have been s~omltted to the OWtrict bula rmM ~ has not been completed. Balding pennas should nM be iseued without payment of ~l requ~ed ~striot fees and ir~anGe of the District's permiL PlaI~S hav~ been sut3nlilted to the OMII~ Imf are not sulT~engy detmled. The senflarj( m canr~ accass Ihe md~Jng line but must use en exi~no latMal stub or tie into · man,die. Othm ~ndlOons may me apply. Buil~ng pennR$ should not be issued Plans I1Me bee~ subm#ted to the 13istfi~ but are nat suIT~MY4y cl~dled. The san~ap/ cgnnan~on cannot accees I~ e>dMJng line 13ut muSl use an edsling Mteral stub of fJe iJl~ a manhoW. Other con0~ons may aW) apply, t~lding pen~ ahoula not be issued Hamilton ¢ _p~_ _~_ng Building Plans ~ beefl submitted to the ~wtc~ but need 10 be rendewed ~ $amue~ L. Maore & Assodates I~fom ~ey can be apl)roved. Budding permits shou4d no[ 13e issued without payment of all nKlulmd ~ fees and i~uance of the DisCO's permit. Gibml~r Progefties Concapt plans have Dean submitted to the DisMcl t;ut are not suf~cianUy detaile<~ with r~% _neCl tO sorlttsry sewe~ se~vme. Plans. need to be ruvJewg~ by Samue~ L. Moore & ~ates I:~are they can t3e approved. Building permits should not ~e IMoed wilhom ~ o~ all requkre~ Distfic~ f'~o~s ao~ ~a~e, ot the Oist~t's pem~. Comments pmvlded ixe~ou~y; no al3jec~ion. P.O. Box 40638 * Indiano~is, Indiana 46240-0638 · (317! 8~4-9200 * Fax (317) ~-9203 04:07 317-844-9283 CLAY R ~ ~ PAGE ' Pag, 2 Hommr ~ Subdiv~im~ Cmmel Convalesce Plan~ have been subn~tted to the Oisaict but are nel sufficiently cleleiled. The sani~ar~ cormection cannc~ access the exi~Ung I~e but mus~ use afl exi~ng lateral st, m or tie into a manhele. Othm' eondi~ons may also apply. Building penn~ ~ not be issued wltl~out I~Y~nt of afl recluimd District fees snd tss~em~e of the Districts permit. Please note that the Oist~t is a member of the Indiana U~mun~ Plant prote~i~ (1UPP$). Ali requesls loc utility locates for our facilities should r~w be directed to IUPP$ at 1 382-5.544. Please let me Kne~ if yo~ have any questions or need ed~tSonat Informa~on. ~ P~GE ]~]AMILTON COUNTY F~ ~17) ~1 lot the minimum ~tquimagnts and intent ~Tr. AC t~-$ (Rule Rt~5~ tO ~ mmrt~l~ ~ ~or a ~d~titiof~al information. I~q/z~l.t'J'f,~ 12:lb 317-rrb-liB1 HAM OD $DIL & ~TER P~GE u5 ~ ~'H~ I~OlLI~WI~G ITEMS AD~UAT~LY ADDRESSED ON ~ ~ ~ Yes Ye~ 19 NO' 0 0 0 Yes No et B ~ 3,*. LAND DI~TKr~G ACI'IVITIF, S [,oca6m,md A, pp~t.s_~ Dlmeus~ns ~r All Diffurbed Arus [C~. C.m~nm~m ~JdWr]' ~it ,1ackplas *s-d oF BOlrrOw An:as (.fTtm~ LM:dda~ ~' ~ ((*Mwe~ Yes B lB m 0 0 0 0 0 [] 0 0 92~ Divisinn.,.Str~el Noblesville, IN 46060-2744 · Ph. (317) 773-1432 F~x (317) 776-1101 Drainage, Erosion and Sediment Con/roi Plan Technical Review and Comment Proj~ N~ne: Submitted By: Reviewed By: ,~-o,~/,*.~ /3..,~O~ 7'-,4/ /.9..~. Plan Review Procedure: Site Visit Date: Legal Description: .~'(22, 3.-4~ Township: /£/~/ Range: Plan Review Date: Civil Township: The technical review and comments are intended to evaluate the completeness of the erosion and sediment control pica*for the project. The erosion and sediment con/rol plan submitted was not reviewed for the adequacy of the engineering desigr~ .411practices included in the plan, as well as those recommended in the comments shouM be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer. The plan ha~ not been reviewed for local, state or federal permits that may be required to proceed with this ~roject. .4clditional informatiot~ including design calculations may be requested to further evaluate the erosion ,ediment control plar~ Thc erosion and sediment control plan has been reviewed and it has been determined that the plan: Satisfies the minimum requirennents and intent of 327IAC 15-5 (Rule 5). Notification will be forwarded to the Indiana Depaffanent of Environmental Management. [1 Refer to the comments section for ad~ditional information. Does not satisfy the minimum requiremen~ and intent of 327IAC 15-5 (Rule 5); deficiencies are noted in the checklist and in the comments section. Deficiencies constitute potential violation of the role and must be adequately addressed for compliance. The information necessary to satisfy the deficiencies must be submitted: . Please address revisions to the reviewer. Proper implementation of the erosion and sediment control plan and inrpections of the construction site by tlie developer or a representative are necessary to minimize off-site sedimentation. The developer should be aware that unforeseen construction activities and weather conditions may effect the performance of a practice or the erosion and sediment control platt The plan must be a flexible document, with provisions to modify or substitute practices as necessary. PROJECT: Page 2 of.~ ARE THE FOLLOWI31G ITEI~IS ADEQUATELY ADDRESSED ON THE PLA.WS (All Plans Must Include ~.ppro£rlaie Leg~ds, Saales, and North Arrow) (Tteans thai are lffot Applicable to this Project are designated by Yes No ~ 0 I~ 0 I~ O lc D~ O O ~ ~E PROo-ECT I1NFORMATION Project Location Map (Show project in relation to other areas of the counO~) Narra(ive Desc. r~bing ~e Natur~ and Purpose of thc Project Location of Planned and/or E~dsting Ro~tds, Utilities, Structures, Highways, etc. Lot and/or Buildlng Landu~c of Adjacent Are~ . (Show the Entire Upstream Wale. r~hed and Adfacent Areas Within 500 Fe~ of the Prep~y Line. s) Yes No [] B D · B D [] O D D [] 2H 2I TOPOGRAPI~C, DRAINAGE, AND GENERAL SITE FEATURES 2A Ex/sting Vegetation ( Identi.~ and Delineate ) 2B Location and Name of All Wetlands, Lakes and Water Courses On and Adjacent to the Site 2C 100 Year Floodplains, Floodway Fringes, and Floodways (Not~ i.i'NOne) 2D Soils Information ( Iflodric ~oil~ are pre~ent, it is Iht responsibility of the owneffdtotelola~r to itreestigate the existence of wetlands and to obtain permits from the appropriate government agenaie, s~ 2E Ex/sting and Planned Contours at an Interval App roprlate to Indicate Drainage Pa~erns 2F Locations of Specific Points Where Stormwater Discharge Will Leave the Site 2G ~den~y A~ Rece~v~ng Wa~et~ ( ~f Di.w-ha~ge i$ t~ a Sepamte Muni¢iPal ~tarm ~wer~ ~duntif3~tht Name of the Municipal OImrator and the Ultimate Receiving Water) Potent/al ~ Where Storm water May Enter Groundwater (Note if None) Location of Stormwater System (Include Culverts. Storm Sea~er~, Charmel$. amt Swale. r) Yes No D oo 3B LAND DISTURBING ACTIVITIES Location and Approrlmate Dimeaslons of Ali Disturbed Areas {i.~. ConstructionLiraits] (Areas Where Feg~ative Cover F/ill Be Prezen, ed Should be Clenrly Designated) Soil Stockpiles and or Borrow Areas (Show La~rtions or Note if None) Yes [] [] No O O O O D O O O O [] 4A 4B 4C 4D 4E 4F 4G 4H 4I 4J 4K EROSION AND SEDI3~ENT CObH'ROL M~ASURES Sequence of When Each l'~easure W'dl Be Implemented (Relative to Earth Dirturbing~dctivitie$) Monitoring and Maintenance Guidelines for Each Mcamre Perime/er Sediment Control lViea~ures (Location. Construction Detail. Dimen~iorav. emd Speaification$) Temporary Seeding (Specifieatlon$: Including Seed]vi&. Fertilizer. la'me, and Mulch Rate~) Temporary Erosion and Sedhnout Control Measures (Location. Construction Detail. Dimenrlans. and Specifications) Permanent Erosion and Sediment Coutrol Measures (l.,~oation. Construction Detail, Dimen~ians. and Specifications) Storm Drain Inlet Protection (Loantian. C, onztructian Deloil. Dimensions. trnd $pe6qficatiOas) Stormwater Outlet Protectlou (Location. Construction Detail. Dimensions. and Specifioations) Stable Constructiou Entrance (Location. Construction Detm'l. Dimensions. and Specifications) Erosion and Sediment Control on Indlvidual Building Lots (Specificatior~) Permanent Seeding (Specifications; Including Seed Mix. Fertilizer. tame. and Mulch Rate. r) Revised 4197 EROSION AND SEDIMENT CONTROL PLAN TECHNICAL REVIEW COMME~ Project: t~oo Iq, 0;0 ~tec~l,~J Page 3 of ~ Note: ,dH erosion and sediment control measures shown on th,,e plans and referenced in this review must meet the designcriteria.$tandardsoandspecificationsoutlinedinthe IndianaHandbookforErosionControlin I Dt..veloping ,dreas" from the Indiana Department of Natural Re.*ource~, Division of $oil Conservation or similar I Guidance Documents. City of Carmel DEPARTMENT OF ENGINEERING March 12, 1999 Mr. Adam DeHart, L.S. Keeler-Webb Associates 486 Gmdle Drive Carmel, IN 46032 RE: 12400 Old Meridian Project Review Dear Mr. DeHarl: We have reviewed the plans submitted to this office on February 16, 1999. We offer the following comments: 1. Streets - City of Carmel 2. Water- Indianapolis Water Comp#ay 3. Sanitary Sewer- Clay Regional Waste District 4. Storm Drainage - Hamilton County and City of Cannel 5. Plan Coimnissinn approval is required prior to Board of Public Works and Safety submissions. 6. The project will require commercial curb cut approval from the Board of Public Works and Safety (if not obtained with Lot #1). 7. Provide a certified engineers cost estimate and Peffonnance Guarantees for sidewalks in the Old Meridian Street right-of-way. Bonds must be posted prior to Board of Works approval of the plat. The plat must be recorded in order to obtain a building permit. If Lots #1, #2 and 03 are platted together, all sidewalk Performance Guarantees must be posted. 8. Indicate Old Meridian Street East right-of-way line and indicated oae-half right-of-way distance. 9. Please include an entrance plan. Indicate acel/deeel lane dimensions, pavement cross sections, saw cutting details, etc. 10. Is the 8-inch water main in Ihe right-of-way existing or proposed? We assmne it is proposed. 11. We require a Street Cut/Right-of-Way Permit and Street Cut Bond for- Water - (1) O, $2,000.00 Commercial Curb Cut - (1) ~ $2,000.00 12. Assume fl~ere are only (4) stann water outlets including (1) curb ialet and (3) curb turnouts/spillways? What do you plan for storm water drainage at the southeast comer of the property? We would prefer a storm plan tlmt would include centralized outlets in the parking areas for improved distribution and detention of storm water. 13. Please provide drainage calculations. 14. Label storm and pipe size along Old Meridian Street. 15. Will fltis construction be coordinated with the construction on Lot #1 and #37 ONE CIVIC SQUARE CARMEL, INDIANA 46032 31 ?/571-2441 Mr. Adam DeHart March 12, 1999 Page 2 I mn including data regarding Engineering Department requirements for commercial projects. I mn also including information regarding building permit procedures for new structures and additions. Perhaps yon will share this infonnatioa with the owners/developers involved wifl~ your projects. lfyou have questions, please call. Dick Hill, Assistant Director Department of Engineering Enclosures i,i. Kate Boyle-Weese, City Engineer ~ M,~i'k~ 191onroe;:Departmealt ~ of~ E om munity~Services Craig Parks, Assistant City Engineer Bob Luusford, R.D.J. Custom Homes Jeff Won:ell, Advantage Medical Equipment & Supply $:\PROJREV99\12400OLDMER KEELER-WEBB ASSOCIATES Consulting Engineers 486 Gradle Drive CARMEL, INDIANA 46032 (317) 574-0140 Fax (317) 574-1269 DATE JOB NO. March 2, 1999 9812-015 ~ Honroe 12400 N. Old Meridian Street [] Shop drawings [] Copy of letter WE ARE SENDING YOU [] Attached [] Under separate cover via cou~ie~ the following items: [] Prints [] Plans [] Samples [] Specifications [] Change order [] COPIES DATE NO DESCRIPTION 1 2 Colored Renderings THESE ARE TRANSMITTED as checked below: [] For approval [] For your use [] As requested [] For review and comment [] FOR BIDS DUE [] Approved as submitted [] Approved as noted [] Returned for corrections REMARKS [] Resubmit [] Submit [] Return copies for approval copies for distribution corrected prints [] PRINTS RETURNED AFTER LOAN TO US COPYTO SIGNED: Adam DeHart, LS If enclosures are not as noted, kindly notify us at once. PRODUCT 239 City of Carmel Fire Department Headquarters 2 CIVIC SQUARE CARMEL, INDIANA 46032 317/571-26OO Keeler- Webb Associates Attn. Adam DeHart, LS 486 Gradle Drive Carmel, Indiana 46032 RE: 2-STORY OFFICE/APARTMENT BUILDING LETTER OF APPROVAL The undersigned has reviewed the proposed plans for 2-Story Office/Apartment Building and has approved the plans subject to the following: 1. Is there a sprinkler system proposed to be installed in this building? If so, contact the Cannel Fire Department for approval of the Fire Department Sprinkler Connection Location. 2. Install a Knox Box on the building at a location approved by the Cannel Fire Department. Date:_Febmary 24, 1999 By: Stanley Puckett, Fire Marshal Cannel Fire Department Five Prevention Saves Lives and P~open¥ February 23, 1999 Mr. Adam DeHart Keeler-Webb Associates 486 Gradle Drive Carmel, IN 46032 RE: 12400 North Old Meddian Street Carmel, Indiana Dear Mr. DeHart: I have received and reviewed the cover sheet, sheet Cl and project narrative of the above-mentioned project. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, Michael D. Fogarty' ' Chief of Police MDF:vb cc: Mark Monroe, Dept. of Community Services A Nationally Accredited Law Enforcement Agency (317) 571-2500 F,,. {317) 571-2512 KEELER-WEBB ASSOCIATES Consulting Engineers 486 Gradle Drive CARMEL, INDIANA 46032 (317) 574-0140 OATE February 16,1999 ATTENTION Mr. Mark Monroe 9812-015 RE: 12400 North Old Meridian Street Cau~el,Indiana WE ARE SENDING YOU [~Attached [] Under separate cover via courier the following items: [] Shop drawings [] Prints [] Plans [] Samples [] Specifications [] Copy of letter [] Change order [] 2/16/99 11 Sets of Construction Documents 2/16/99 1 Project Narrative 2/16/99 1 Check for $1100.00 2/16/99 2 Development Plan Application 2/16/99 2 ADLS Application 2/16/99 ~ ListofAdjoiners 2/16/99 8 BZAApplication THESE ARE TRANSMITTED as checked below: [] For approval [] For your use [] AS requested [] For review and comment [] FOR BIDS DUE REMARKS [] Approved as submitted [] Approved as noted [] Returned for corrections [] Resubmit [] Submit [] Return copies for approval copies for distribution corrected prints 19__ [] PRINTS RETURNED AFTER LOAN TO US This submittal is for your review and comment for the March 17,1999 Carmel T.A.C. meeting. COPY TO Bob L~as ford 12400 North Old Merichian Street LLC SIGNED: Adam L. DeHart LS