Loading...
HomeMy WebLinkAboutCalumet Civil/CO3/Towne Road/increase 64,152.89 !y a it /l;lA` -, CITY OF CARMEL \ ,,,/ TO: Lisa Scott CONTRACT CHANGE ORDER NO.: 3 Engineering Administration DATE: January 4,2012 City of Carmel Indiana PROJECT NAME: Towne Road 06-12 One Civic Square CITY REQ.NO.: Carmel.IN 46032 CITY PO NO.: CITY PO DATE: I. You are directed to make the following changes in this Contract: a. Add new pay items(#0119 through#0142)for additional work to the contract as follows: Temporary Sediment Trap,INDOT>2 Aggregate,Structure Modification for Structures#. Geogrid.Asphalt Work at the Utility Pole. Erosion Control Blanket,Grading on the SE Quadrant of 141st Street,Repairs to Irrigation System at 136th Street,Flat Glass Light Fixtures. Underdrain Repairs on 136th Street,Cold Weather II1.IA Density Testing.Temporary Curb Ramp Preparations at 136th Street,Construction of Multi-use path at 136th Street,Additional MOT and Flagging at 136th Street, Water Service Line Adjustment at 136th Street,Ditch work on NE Quadrant at 141st Street.Additional Mobilization for Pavement Markings at 136th Street, Stone Shoulders at 136th Street.2009 Labor Wage Increases. Additional Topsoil work on NW and SW Quadrants of 136th Street.Asphalt work at butt joints,and Additional topsoil work at driveway culvert pipe. SCHEDULE!)ADJUSTMENT AMOUNT (-)OR( -)DAYS 11. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.:NA W.D.C.NO.:NA Other: NA The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 1,710,595.28 Contract Price will be increased by this Change Order $ 64,152.89 New Contract Price including this Change Order S 1,774,748.17 Contract Time prior to this Change Order NA Days NA Completion Date Net increasedldecreased resulting front this Change Order 0 Days Current Contract Time including this Change Order NA Days NA Completion Date This Change Order is for full and final settlement of all direct.indirect,impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Accepted Approved Recommended American Structurepoint_ Inc. Calumet Civil Contractors,Inc. /1 — ENGINEER CONTRACTOR ales Brain rd,Mayor 7260 Shadeland Station _--____-- 4898 Fieldstone Drive ',/_2 Address Addm, ,t +ael McBC City gineer Indianapolis, IN 46256 Whitestown IN 46075 cite/Stab?/ip Cn'^St:ar-7.1p NI,. : . n I ur-or., lember QBy' - --._._..... Bar: G Ems— on tip, lin,Member Phone: 3►n-Zg' —c%S4.3 -19°0 Phone:3/ _ 7 f • a Cordray.Cler'=Treasurer Date: 03 J 20 i Z- Date: /3—1 Z...__... Date: / — Change Order#3 Item No. Description Unit Cost Quantity Unit Total Cost Deducts Addition • 0119 Temporary Sediment Trap $ 38.58 57.96 TON $ 2,236.10 4 . 0120 #2 Aggregate $ 22.60 469.18 TON $ 10,603.47 4 . 0121 Structure Modification $ 743.61 1 LS $ 743.61 0122 Geogrid $ 7.90 99.7 SYS $ 787.63 4 . 0123 Asphalt Work-Utility Poles $ 639.86 1 LS $ 639.86 4 0124 Erosion Control Blanket $ 1.48 249.8 SYS $ 369.70 4 .▪ 0125 Grading SE Quadrant-141st and Towne Road $ 2,288.46 1 LS $ 2,288.46 4 ▪ 0126 Multi-use Path-141st and Towne Road $ 5,157.51 1 LS $ 5,157.51 • 0127 Irrigation Repairs-136th Street $ 200.00 1 LS $ 200.00 4 • 0128 Flat Glass Light Fixtures $ 14,470.80 1 LS $ 14,470.80 ▪ 0129 Underdrain Repairs-136th Street $ 198.08 1 LS $ 198.08 4 • 0130 Cold Weather Density Testing $ 1,369.76 1 LS $ 1,369.76 J • 0131 Temp Curb Ramp Prep-136th Street $ 494.37 1 LS $ 494.37 4 0132 Curb Ramp Prep-136th Street $ 552.51 1 LS $ 552.51 4 • 0133 Multi-use Path-136th and Towne Road $ 11,863.39 1 LS $ 11,863.39 J 0134 Additional MOT and Flagging-136th Street $ 1,718.93 1 LS $ 1,718.93 d • 0135 Water Service Line Adjustments-136th Street $ 1,224.28 1 LS $ 1,224.28 4 0136 Ditch on NE Quadrant-141st Street $ 723.04 1 LS $ 723.04 4 0137 Additional Mobilization for Pavement Markin s-136th Street $ 1,320.00 1 LS $ 1,320.00 4 0138 t $ 985.00 1 LS $ 985.00 4 ▪ 0139 2009 Labor Wage Increases $ 1,530.68 1 LS $ 1,530.68 4 - 0140 Topsoil work on NW&SW corners of 136th Street $ 2,748.40 1 LS $ 2,748.40 .1 0141 Asphalt Work at butt joints $ 830.00 1 LS $ 830.00 4 0142 Topsoil work at driveway $ 1,097.31 1 LS $ 1,097.31 4 Total Deductions:$0.00 Total Additions:$64,152.89 Net Total:$64,152.89