CARMEL TECHNICAL ADVISORY COMMITTEE
MEETING AGENDA
�N01 ANp
Date: Wednesday, December 21, 2011
Place: Dept. of Community Services Conference Room, 3 Floor, Carmel City Hall.
Time: 9:00 a.m.
9:00 a.m. Docket No. 11110009 DP /ADLS: Fifth Third Bank.
The applicant seeks site plan and design approval for a new bank building. The site is located at 205
E. Carmel Dr. The site is zoned B -8 /Business and lies within the Carmel Dr. Rangeline Rd.
Overlay Zone. Filed by Kurt Prosser of the GPD Group.
Brian Hagemeier with GPD Group was present for the petitioner. The petitioner is proposing
to build a retail /office use facility within the City. Currently construction documents have
been submitted to various departments within the City and together have been working
though all the concerns and issues.
Joanie Clark- Vectren Energy
Prior to demolition, the active service will need to be shut off and relocated.
Greg Hoyes Hamilton Co. Surveyor's Office
Sent letter with comments. No further comments at this time.
Nick Redden -City of Carmel Engineering
Sent letter with comments. No further comments at this time.
Ryan Hartman -Clay Twp. Regional Waste
This project falls outside CTRWD service area, no comments.
Chris Ellison -City of Carmel Fire Department
No comments at this time.
Daren Mindham -DOCS Urban Forester
Sent comments, waiting for a revised plan.
Shirley Hunter -Duke Energy
Prior to demolition, the active service will need to be shut off and a service request for new
service will need to be applied for.
Angie Conn -DOCS- Planning Administrator
Sent letter with comments, waiting for an official response. As an additional suggestion in
looking at the site, the City would ask the developer to salvage any of the existing stone from
the structure.
Page 1of1
WWW.CARMEL.IN.GOV ONE CIVIC SQ. CARMEL, IN 46032 (317) 571 -2417
9:15 a.m. Docket No. 11110015 DP /ADLS: The Bridges PUD, Office Residential Use Block, Berm.
The applicant seeks site plan and design approval for a perimeter buffer landscape plan on
approximately 1.6 acres along 111 St. Springmill Rd. The site is located at 11405 Springmill Rd.
and is zoned PUD /Planned Unit Development. Filed by Charlie Frankenberger of Nelson
Frankenberger for JEC Partnership LP.
John Dobosiewicz, Brad Schrage, Buzz Weisiger, and Charlie Frankenberger all present for the
petitioner. The petitioner is proposing a landscaping buffer that will be constructed in association
with the Bridges Plan Unit Development (PUD) project. The project location extends from Illinois
St. to 111 St., West along the North side of 111 St. over to Springmill Rd, and North to
approximately 150ft. short of the proposed entrance that was shown a few months ago at TAC with
the mass grading and drainage plan. At the last Plan Commission meeting, the Heath South project,
which is approximately 6.5 acres, has been approved. It is situated adjacent to Illinois St. and West
Springmill Rd. Have received comments from David Littlejohn, and have not yet made revisions to
the plans to identify additional sidewalk connections.
Joanie Clark- Vectren Energy
No comments on the adjustments at this time.
Greg Hoyes Hamilton Co. Surveyor's Office
No comments.
Nick Redden -City of Carmel Engineering
No comments on the adjustments at this time will need to review new plans.
Ryan Hartman -Clay Twp. Regional Waste
No comments at this time. All issues have been addressed.
Chris Ellison -City of Carmel Fire Department
No comments on the adjustments, fire hydrants will need to be accessible at all times.
Daren Mindham -DOCS Urban Forester
Landscape plan that was provided is approved as of Nov. 21 2011. If new sidewalk
connections change the landscaping plan a revised plan will need to be submitted. Daren
Mindham will discuss with David Littlejohn a solution to providing a continuous landscaping
buffer along 111 St. and Springmill Rd, while also providing the required sidewalk
connection to the interior of the site.
Shirley Hunter -Duke Energy
Currently rebuilding the transmission line that runs along 111 St., just advised to keep in
contact in regards to the locations of the poles and service.
Angie Conn -DOCS- Planning Administrator
Sent continents, all concerns have been addressed, waiting for an official response.
Page 2of1