Loading...
HomeMy WebLinkAboutCorrespondence 11-1-95 Sidewalk/Tree Preservationra ty of ar nie DEPARTMENT OF C OM.MU•NITY DEVELOPMENT November 1, 1995 'Jon B'. Stafford Bremner.. : &, Wiley Inc. 3945:Eagle Creek Parkway Indianapolis, IN 46254 Re: Shepherd Insurance :Dear .Jon: Pursuant to our discussion today, please note the following. The City of Carmel's standard•for public sidewalk installation.location along Carmel Drive is one foot• (1') within the street right-of-way. In the case• of this project, it would occur within the newly established 45' half right -of,- -way. Tree clearing for the walk within the preservation area is to .be minimal, preferably an area equal to the width oftlie walk (h5'), plus one,foot (1') of clear area on each side (seven feet.total). The staking and clearing. should be supervised by:.your Landscape .Architect: I would: also like to make •a revision to the October 18 site - trieetiiig• dotes by you, specifically poinrnun,ber 1 on page 2, under"Coristruction issues and.treeipre'servation issues to the east of the building:" Please.note that all dead wooding and removal of fencing will be by non - mechanical means only. 'No heavy equipment .or light. equipment will be permitted; in the preservation area. Please feel free to contact'me with any questions on comments concerning the above, or I will be happy to address these at our,meeting on site this Friday, November 3, Sincerely, :. LP 1 Michael :Hollibaugh copy: Dave Cunningham, Director DOCD Don.Hammersley, Meyer and Najem ONE CIVIC SQUARE CARMEL, INDIAIJA 46032 317/571.2400