Loading...
HomeMy WebLinkAboutCorrespondence: Engr'g Dept 1-24-12Conn, Angelina V From: Duncan, Gary R Sent: Tuesday, January 24, 2012 8:59 AM To: Jennifer Roberts Cc: Greg Snelling; Barnes, David R; Conn, Angelina V; Redden, Nick; Thomas, John G; Greg R. Hoyes; Greg Ilko Subject: RE: Lubavitch of Indiana Carmel review comments Good morningJen! As I said, I have a few, very minor comments: 1. Previous Comment 42: Please omit Sheet L1.0, Landscape Plan; Sheet L1.1, Landscape Details and Specifications; and Sheet SE1.0, Photometric Plan from construction sets (and their Index) to be submitted for review bythis department. The Department of Engineering does not haveapproval authority over landscape plans or photometric plans. The Department will not approve the construction plans if these sheets are included. 2. Previous Comment 43(a): Sheet C000 —Title Sheet. Please remove the titles for the Landscape Plan, Landscape Enlargement Plan, and Lighting Plan from the Drawing Index. The Department will not approve the construction plans if these sheets are included. 3. Previous Comment 44(a): Please include the City's curbingand paving policies. Thank you for adding the curbing policy. There are portions of the policy that are cut off. Also, the paving policy was not added. 4. Previous Comment 49(e): Please indicate the depth of the gravel shoulder and the requisite subsurface drain in the 96th Street typical section. Thank you. Please also label the width of the gravel shoulder. The shoulder shall be 3 -feet wide. 5. Previous Comment 50(a): Are flaggers needed? Thank you. Board of Public Works and Safety approval i s required for the lane closure. 6. Previous Comment 53(b): In details 11 /C704and 1/C704, please revise the height of the straight curb from 18 inches to the City sta nda rd of 22 i nches. The Department apologizes. The dimension below grade in Detail 11/C704 may be 16- inches. I,TI rrO_ r L From: Jennifer Roberts mai Ito: iennifer @elements- engineering.com Sent: Friday, December 02, 20112:50 PM To: Duncan, Gary R Cc: Greg Snelling Subject: Lubavitch of Indiana -Carmel review comments Hi Gary, Hope you had a great Thanksgiving holiday. Just wanted to check in and see if you think we will have the second round of review comments backfrom your office before year's end. I can't believe it is that time ofyearalready. We are setting our project construction schedule (hopingthat will make springcome faster) and the information regarding your timeline would help us in that effort. We've received thesecond round of comments from CrossRoad Engineersand are eagerto get this project finalized. Thanks so much for your help. We still need to get together for that breakfast soon. It's beenages since we've caught up. Th a n ks, Jen Jennifer L. Roberts, PE, LEED -AP President Elements Engineering, LLC sustainable site design m consulting 317.490.7054 aennifer (cDelements- engineering.com Newemail address! www.elements- engineering.com New website! Twitter: @jrobertspe "We vote for reality with our imaginations." Caroline Casey