Loading...
HomeMy WebLinkAboutCorrespondence04/20/1999 12:16 317-776-i101 HAM 00 SOIL &WATE~ PAGE ~Mist"~'~h~m~ngln~nen~ and/ntmtof3271AC 15-5 (Rule ~) ~otl~cat~on will I:e forwarded to ~h~/~tts~t DeparmKm of Environmental Management. m'o~n~Mz~eWa~MC~MrMj~L ~ep~ms~r ~fl~=ibte~,~.,w~#~provtsionx~omodlfyor~me y~ O' [] 0 0 0 0 TOPOGRAPHIC, DP. All~AG~ AND GENERAl, SITE O lB ~A In f-i 4F ]:]~,MILTON COUNTY So~l & $17-775-14~ Fax: $17-77~-1101 ~_25 D'Ivision St, feet · suite 103 - Noblesville · IN · 46060-2744 April 13, 2999 To: Mark Monroe From: John B. South Re: Carmel/Clay Pla~ Commission Subcommittee Meetings Overture Sec.1 - I am not satisfied with the temporax-f erosion control for the south-west corner of the site, Other concerns have be~n satisfied. Camde/1 Walk $ec.1 - The six comments ~rom my last letter, discussed at TAt, have not been resolved. Pro,acting ~he existing wet~ande a~d pr~vidin~ a.better erosion control plan ara the two main issues, Lakes at Haas1 Dell Sec.1 - The fifteen items on m~ Last comment letter have not *been addressed. Most of the comments should be easy tO thai%ge o~ the construction plans. The main=e~anoe of the ' retaining wall needs to be incorporated into the covenants and included in the cO~a~onares. Falrcjreen Trace Primary- Com~enta addressed. Duke Rezone at US31 and I¢65 - The drainage outlet te ~ontrolled by the State Highway Department. Williams Creek will be impacted by the alter~dhy~irolocjy, but consistent with cuxx~nt ordinance and deeignpractices. Monroe, Mark T From: Sent: To: Subject: Steven Cash [stc~co.hamilton.in.us] Tuesday, April 13, 1999 5:27 PM mmonme~ci .carmel .in .us Carmel Plan Comm. Update Mark, Here is a status report for the projects that you noted for tonight's Plan Commission meeting. I hope that it is helpful. Carmel Plan Commission Subdivision Committee 1. The Overture, Sec. 1 Status: The regulated drain through this site has been abandoned. Since annexation of this site becomes effective 1/1/00 we have recommended that the storm sewers be approved by the Carmel Engineers office. I believe that our offices are in agreement about this, but the agreement needs to be finalized. I recommended in my letter that the petitioner should facilitate this. 2. Camden Walk, Sec. 1 Status: I faxed out a letter this aftemoon. Many of the comments may have already been addressed. Although important and must be adhered to, the construction plan comments are not what I would consider "major." 3. Lakes at Hazel Dell, Sec. 1 Status: Per my previous letter, the regulated drain through this site was abandoned as a result of the construction of Hazeldell Blvd. We have no further requirements. 4. Fairgreen Trace (Primary Plat) Status: Dave Sexton has addressed my main concern for this pdmary plat. secondary plat stage. Further comments will be made at the Special Study Committee 4. Duke Rezone (96th & US31 and surrounding area) Status: The petitioners will have several important drainage issues to address as each area is designed. I believe that these issues con be adequately engineered and constructed. This office has no comment with respect to the rezone of these parcels at this time. Further comments will be made when construction plans are generated. Memo Tm Mark Monroe, Depa~nent of Community Service~ From= Dick Hill CC= M, Kate Boyle-Weese, Craig Parks Da~e.' 04/13/99 Re= Ap~113, 1999 Plan Commission We offer the following comments for projects, within our jurisdiction, that am on the Ap;it 13m Plan Commission agenda: SUBDIVISION COMr~ i. Overture, Section All outstanding issues have been resolved. The annexation of this parcel is in progress. 3. Lakes at Hazel Dell, Section l We have two outstanding issues with this project. a) This Department requested bollards (or some other type of protection) be installed where the lakes am adjacent to dedicated streets. The issue is one of safety and liability. We have requested this previously in other developments. Bmnwick Development agreed to install boilards for a similar situation in their Prairie View development and C.P. Morgan has installed trees as protection along 3~ Avenue S.W. for their Parkslde Village development. Zadng Homes has resisted due to aesthetics. They feel the lakes are the highlight of their development and the bollards would not be a positive step towards this objective. The City maintains we will require bellards, trees, or some other protection between the curbs and the banks of the lakes. Or, as an alternate choice, the Developer can indemnify the City from all damages, injuries or claims resulting from vehictes veedng offthe roads within the lake areas. b) There is an extended section of storm sewer pipe that was designed to remain under water. The issue is access to the pipe should maintenance be required. In addition, submerged pipe is subject to additional stress and maintenance issues that normal pipe installations would not encounter, We are concerned the City will be subjected to higher than normal, long-tern1 maintenance costs resulting fi'om the submerged conditions. The City Engineer has discussed this situation with the Developer and Engineer and has been promised by the Developer that he would agree to longer than normal maintenance bends, in addition, if it becomes evident that ~he storm sewers. having to flow under pressure conditions, are not funcSonin~ m~eerlv, the Developer will be responsible to (1) verifij the submerged pipe has no blockage (this may require lowering the water level of the detention pond); and (2) if there is no blockage, the Developer may have to re-design and reinstall the last submerged section of storm sewer. Certain lengths of pips are also designed at extremely flat slopes. This office has asked that the slopes be increased, but the Engineer has indicated this is no{ desirable. The Deparlment of Engineering has notified the Engineer and · Page I Developor that we will require these segments to be laid at the design slopes, or better. We wi# not accept as-built pians with altered slopes, whictt may reduce the ltow capacity of the pipes. 4. Fairg~en Trace This Department does not have major issue with this development. We have requested the onsite detention pond be lined to prevent fluctuations in water leveis and to protect water tables. We also request sub surface and yan:l drains be installed on the West Side of the development the same as indicated on the East Side. We request drainage calculations be submitted for this project. We reserve further comments until detailed construction pians are submitted. SPECIAL STUDY COMMITTEE 4. Duke Realty Inve=;.,,ents We resawe further comments on this project until detailed construction plans have been received. S:'t~IEMO$99~04136~gPLAN · Page 2 CITY OF CARMEL WATER-WASTEWATER UTILITIES 130 1ST AVE. ~ · CARMEL, INDIANA 4603£ (317) 571-2648 ° FAX (317) 571-2653 March 30, 1999 Mr. Con Crosby The Schneider Corporation 3020 Noah Post Road Indianapolis, IN 46226-6518 RE: The Overture Dear Mr. Crosby: We have a few comments on the proposed Overture development. After consulting with Jones & Henry Engineers, we would like to pass on the following: 1. The sanitary sewer collection system needs to be revised to discharge into the existing manhole on 126'h Street at an angle no more than perpendicular to the direction of flow. 2. The water main must be DIP pressure class 350 or greater. 3. Restrained joints should be used in lieu of thrust blocks on new water main. Please fell free to call if you have any questions. Sincerely, Paul Amone Water Distribution and Sewer Collection Office Manager ce: John Duffy, Utility Manager Paul Pace, Water Distribution Supervisor Residential Developrnent Services March 30, 1999 Mark T. Monroe Department of Community Services One Civic Square Carmel, IN 46032 The Overture Secondary Plat and Construction Plans 3020 North Post Road Indianapolis, IN 46226-6518 Dear Mark, The plat and construction plans for the project list above have been revised according to the March 17th TAC review comments. The revisions are as follows: Support Data 1. Copies of all correspondence from the TAC members are enclosed. 2. A copy of the signed and witnessed subdivider agreement is enclosed. 3. A copy of the covenants and restrictions is enclosed. 4. A sketch of the typical lot with the house plan shown has been forwarded to your office and reviewed. As requested, the front setback information has been added to the plat. 5. An additional street name has been added to the plans for the east west portion of Overture Drive as required by Carmel Communications. This street name is now Prelude Lane. City Engineers Comments 1. A copy of the letter to the City Engineer is enclosed. SCS Comments 1. A copy of the letter to the SCS is enclosed. Please place this project on the April 13, 1999 subcommittee agenda for approval based on the revised plans or call me if you have any questions. Sincerely, THE SCHNEIDER CORPORATION j. o~Crosby p.E~Q" ~ Project Engineer Offices in Indianapolis, Avon, Carmel, and Lafayette, Indiana Residential Development Services March 30, 1999 Dick Hill Carmel City Engineer's Office 1 Civic Square Carmel, 1N 46032 RE: The Overture, Section 1 Dear Dick, The construction plans and secondary plat have been revised according to the TAC comments from the April 17, 199 TAC meeting. The revisions are: 1. The developer has filed for annexation of the site with the City of Carmel and it is intended that the infrastructure be controlled by and dedicated to Cannel. The Highway Department letter (copy enclosed) states that this project is in Carmel's jurisdiction. The developer would provide a written agreement, if necessary, to assure that the infrastructure is installed according to Cannel requirements and is inspected by Carmel such that the city will accept the improvements once constmction is complete and annexation is complete. 2. Streets as stated above will be dedicated to Carmel. 3. Water mains as stated above will be dedicated to Carmel. 4. Sanitary Sewers as stated above will be dedicated to Carmel. 5. Storm sewers as stated above will be dedicated to Carmel. 6. The Sewer and water fees will be paid after Board of works approval and prior to the start of construction. 7. The Sewer and water availability request has been submitted. 8. The IDEM sewer permit has been filed with IDEM for approval. 9. A request for discharge of storm water to the Hazel Dell Road storm sewers is attached. 10. Any entrance features in the right-of-way will be approved by the board of works. 11. A copy of the drainage report was provided at the TAC meeting. 12. The lake will be lined with clay fi.om the site as discussed. 13. As discussed in TAC, additional storm sewers connecting to the lake with be built with section 2 and the pipe slopes for the proposed incoming and outgoing pipes have very different slopes and capacities. 14. The pond outlet is connected to the more distant storm structure because it is the storm structure designed by ACE to accept the runoff for current and proposed conditions. Dick Hill March 24, 1999 Page 2 15. An easement description is attached. The developer could have this easement recorded prior to construction. 16. Lots 1-10 have a 1% swale along the back yards yet only drain about half the typical yard area for a mar yard swale. The swale grading should be more than adequate if the earthwork is done properly and this can be verified prior to final approval by the grading asbuilt drawings. 17. The existing storm inlet information has been added to the development plan. 18. The auxiliary lanes have been updated to match the Lakes at Hazel Dell revisions. 19. The curb underdrains have been extended. 20. Curbing has been added to Section A-A on C301 as requested. Please approve these revised construction plans or call me if you have any questions. Sincerely, THE SCHNEIDER CORPORATION J. Cort Crosby P.E. Project Engineer IHAN~MIII&L THE.SCHNEIDER CORPORATION 30~ Nogdt P~t Road WE ARE &ENDING YOU: )t Faxed Tote page., lr~lum~l cove~ sheet __ Altached Via:, M~I! ~ Fed Ex UPS ~ Courie~ Pick Up Other ........ THE ABOVE ARE TRANSMITTED es checked below: FOr epl~oval _~ Fo~ review and =eminent Feryeeruae ,, FORBIDSDUE ~ 19 , Aa requested Other; COPY TO: FROM: ff enclosures am nor as noted, kindly ~otify u~ a; once. Residential De~lopment Services I 800d198 0332 toll free March 24, 1999 John South Hamilton County Soil Conservation 925 Division Street Noblesville, IN 46060 The Overture Secondary Plat and Construction Plans Dear John, The plat and construction plans for the project list above have been revised according to the March 17th TAC review comments. The revisions are as follows: The contour elevation behind lots 1 and 2 was lowered 1 foot as discussed in TAC. The drainage in the rear of lot 11 is split at the high point in the center of the lot as discussed in TAC. As discussed in TAC, the mounding along the west property line will be constructed first limiting the runoffto the west to just the back side of the mound and the tree line. This has been added to the "rule 5" information on the plans. The existing strip of vegetation/cover in the drip line of the trees will be maintained to intercept any silt from the back side of the mound. Additionally, a temporary swale has been added to collect the majority of the sheet flow from the future section 2 and direct it to the lake. Staw bales have also been added to protect the existing inlet from silt. 4. The lake will be lined based on the soils information being prepared by The Schneider Corporation. Please approve these revised plans or call me if you have any questions. Sincerely, THE SCHNEIDER CORPORATION J. Cort Crosby P.E. Project Engineer p. t/1 ~h 16,1999 Co~ Cmshy $chneidm' Corp. Re: The Overture, Sec. 1 I havc reviewed the plans for this project md have the followirlg comments. I. A portion of thc SH Moffitt Arm of the Mitchner Drain is located on this site. It is soh~duled to go before the Hamilton County Drainage Board on the 22ad of this month. This office is recommending thnt this Arm be abandoned, Most of this watershed has been or is scheduled ~o be diverted as a result of the construction of Hazel Dell Blvd. and the new subdivisions within tl~ watershed, such as The Overture subdivision. Per tho plans, runoff from this section will no longer be part of the Mitclmer watershed. 2. Per previous discussion, this site is pursuing annexation. Please submit the annexation order ~rom the City that stales the date annexation will be in cfl'ect. Bcoau~e this is inthc process of being annexed anti because of it's location, the Surveyor Ires stated his interest in the City having approval over the design and inspection of this subdivision. If this is agreeable with the City Engineer, it is recommended that the developer facilitate a written agrccraent between the developer, City and County s|nc~ annexation will not become effective until Jan. 1, 2000. If you have any questions, please feel free to conta~ this offiae at 776-8495. Plan Reviewer Cc: Cannel DOCS Carmel Eng. NRCS Bstridgc INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT We make Indiana a cleaner healthier place to live FumkCYBamon Commi~ioner March 11, 1999 I00 North Senate Avenue EO. ~Ox 6015 Indianapolis, indiana 46206-6015 (317) 232-8603 (800) 451-6027 w~w.ai.org/idem Mr. Steve Van Soelen Estridge Development Company 1041 West Main Street Carmel, Indiana 46032 Dear Applicant: Re: Deficiency Notice for Construction Permit Application The Overture, Section 1 Carmel, Indiana Project No. M-11628 This will acknowledge the receipt of plans and specifications on February 23, 1999, in connection with your application for a Construction Permit, pursuant to IC 13-15 et. seq., and 327 IAC Article 3 et. seq., on the above-referenced project. Your application has been found to be deficient. The following administrative and technical items are required to complete your application for a Construction Permit. Please be advised that if all the deficiency items are not corrected or resolved within sixty (60) days of the date of this letter, your application will be denied on the basis of incompleteness. I. ADMINISTRATIVE EVALUATION Upon review of your application, the following administrative deficiencies are noted: Enclosed is a new capacity form letter that will be required from all wastewater treatment facilities - please have the facility that actually treats the proposed project's wastewater complete the form in its entirety and submit it to our office. If you have any questions concerning the administrative accuracy of this application, please contact Mr. Don Worley at 317/232-5579, or Fax 317/232-8637. COUNTY Sbil & Water 92.5 Division.~.Street Noblesville, IN 4~060-2744 Ph. (317) 773-1432 Fax (317)776-1101 Drainage, Erosion and Sediment Control Plan Technical Review and Comment Projex~ Name: Submitted By:. Reviewed By: Plan Review Pwcedure: Location: Site Visit Date: Plan Review Date: Legal De~cription: ~,~ ~C.. ~ ~ Township: /~A/ Range: 6/~' Civil Township: Cz~II" The teeff'mie.~l review and comments are intended to evaluate the completeness of tl~e erosion and sediment control plan for the projecfi The erosion and sediment control plan submitted ~vas not reviewed for the adequaO, of the engineering design. ~411practices included in the plan, as well as those recommended in the comments should be evaluated as to their fe. asibilio~ by a qualified individual with structural practices designed by a qualified engineer. The plan has not been reviewed fer local, state or federal permits that may be required to proceed with this oroject. '~1clditional information, including design calculations may be requested to fitrther evaluate the erosion rediment control plata The erosion and sediment control plan has been reviewed and it has been determined that the plan: FI Satisfies the minimum requirements and intent of 327IAC 15-5 (Rule 5). Noti~cation will be forwarded to the Indiana Deparanent of Environmantal Management. Refer to the comments section for additional information. Does not satisfy the minimum requirements and intent of 327IAC 15-5 (Rule 5); deficiencies are noted in the checklist and in the comments section. Deficiencies constitute potential violation of the rule and must be adequately addressed for compliance. The information necessary to satisfy the deficiencies must be submitted: . Please address revisions to the reviewer. Proper implementation of the erosion and sediment control plan and inspections of the construction site by the developer or a representative are necessary to minimize off-site sedimentation. The developer shouM be aware that unforeseen construction activities and weather conditions may effect the performance of a practice or the erosion and sediment control plan. The plan must be a flexible document, with provisions to modify or substitute practices as necessary. PROJECT: 7-~/~' Page 2 of.~ ARE TIlE FOLI_~WING ITEMS ADEQUATELY ADDRESSED ON THE PLANS ? (AU Plans Mu~ Include Appropriate Legends, Scales, and North Arraw) (ltems tha~ are Not,dpplicable to this Project are dedgna~ed by IV~l) PROJECT INFORMATION Project L~cation Map (Show project in rdo#ca to o~er nren~ of thc co~n~) Narrative Describing ~hc Nature and Purpose of the Project Location of Planned and/or Existing Roads. Ut/I/tics, Structures, llighways, et~ Lot and/or Building Ixmatious Landuse of Adjacent Areas ($1tow the Entire Upstream Htatemhed ond Adjacent ~rea$ F/ithin ~00 F~d of tile Property Li'ne~ ) ~l O 2EC M O 2][ TOPOGRAPHIC, DRAINAGE, AND GENERAL SITE FEATURES Exis/ing Vegetation ( ld~fffyoudDelineate ) Localion and Name of All Wctiands, Lakes ~nd Water. Courses On and Adjacent to the Site i00 Year Floodplains, Floodway Fringes, and Floodways (Not~ ifNcae) Soils Information ( If bydric soils are pre~ent, it is the responsibiliO~ of the own~Ydeveloper to im, e.~tigate the existence of wetlands and to obtain permits from the appropriate government agencies.) Existing and Planned Contours at an Interval Appropriate to Indicate Drainage Patterns Locations of Spedfic Points Where Stormwater Discharge Will Leave the Site Identify .411 Receiving Waters ( If Discharge is to a Sepawte Municij~al Storm Sewer, IdentiJ~, the Name of the Municifxzl OFerator and the Olarnate Beceiving ~Fatem) Potential Areas Where Storm water May Enter Groundwater (Note if None) Location of Stormwater Sys/em (Include Culverts, Storm Sewers. Channds. and Swales) Yes No 0 ~ aB LA_ND DISTURBING AC/TV1/3ES Loc. ratio, and Approxknate Dimemdons of All D~rbexl Areas [Le.. Comtruct/on Limi,] (.dre~ V,~a-e Feg~aMve Cover F~ll Be Prezer~wl ~houM be Clearly De~qgnated) Soil Stockpiles and or Borrow Areas (Show Lm~ation$ or Note if None) Yes O 0 No [].~t~ [] 0 0 D 0 O O O [] 4A 4B 4C 4D 4E 4F 4G 4H 4I 4J 4K EROSION AND SEDI1VIENT CONTROL M]gASURES Sequence of When Each Measure WH[ Be Implemented (Rdative to Earth DixturbingActivities) Monitoring and Maintenance Guidelines for Each Measure Per/meter Sedlment Control Mcasurcs (Location. Construcdon Detail. Dimensions. cmd Specifications) Temporary Seeding (Specifications; Including Seed Mix. Fertilizer. Lime. and Mulch Rate~) Tcmp~rary Erosion and Sediment Control M[easurcs (Location, Cot~truction Detail. Dimensions. ~nd Spe~fications) Pcrmanent Eros/on and Sedimeat Control l~l[casurcs (Location, Canstruction Detail, Dimensions. and Specifications) Storm D rain Inlet Protectien (Location. Con~tr~¢aon Delail. Dimension% and SFecification~) Stormwaler Outlet Protection (Location. Constntction Detail. Dimensions, and Specificatior~) S/able Cons/ruetion Entrance (Location, Construction Detail. Direction% and Specification~) Erosion and Sediment Control on Individual Building Lots (Specification0 Permanent Seeding ($pecificatfons: Including Seed Mix. Fertilizer, ~'me. and Mulch Rate.0 ReeLed 4197 Project: ~'~ Page 3 of J' EROSION AND SEDIMENT CONTROL PLAN TECHNICAL REVIEW COMMS~NTS Note: ~IH erosion and sediment control measures shown on the plans and referenced in this review must meet the de. sign criteria, sta, n, d. ards. and specifications outlined in the "Indiana Handbook for Erosion Control in Developing .dreas jqom the Indiana Department of Natural Resources, Division of $oil Conservation or similar Guidance Documents. Hamilton County Sheriff's Department A Tradition of Service Since 1823 18100 CUMBERLAND ROAD NOBLESVILLE, INDIANA 46060 ADMIN. (317) ?73-1872 EMER. (317) 773-1262 L. JOE COOK SHERIFF March 9, 1999 The Schnieder Corporation 3020 North Post Road Indianapolis, Indiana 46226-6518 Dear Sir: We have reviewed the secondary plat and construction plans for The Overture project. We find no public safety concerns that would impact this development. L. Joe Cook Sheriff, Hamilton County City of Carmel DEPARTMENT OF ENGINEERING March 2, 1999 Mr. Cort Crosby The Schneider Corporation 3020 North Post Road Indianapolis, 1N 462264518 RE: The Overture Section 1 Project Review Dear Mr. Cmsby: We have reviewed the plans submitted to this office on Febmmy 19t~, 1999. We offer the following 1. Has Hamilton County yielded jurisdiction over this project, since the annexation process has connTlenced? 2. Streets - Presently Hamilton County jurisdiction. 3. Water Mains - City of Cannel jurisdiction. 4. Sanitary Sewers - City of Cannel jurisdiction. 5. Storm Drainage - Hamilton County and Cannel jurisdiction. 6. Fees - Availability (acreage) Water - $1,010.00 per platted acre Sanitary Sewer - $1,365.00 per platted acre 7. Requires Sewer and Water Availability approval from the Board of Public Works and Safety, after Plan Commission approval. 8. The I.D.E.IV[ I.A.C. 330 Construction Permit application will be approved by this office and returned after the project has received Sewer and Water Availability approval from the Board of Works. 9. Since this area has not been annexed, Board of Public Works and Safety appmvai is required to discharge into the Hazel Dell Parkway storm sewers. 10. All irrigation systems, entrance lighting, entrance signage, etc. in street right-of-way requires Board of Public Works and Safety approval. 11. Please provide drainage calcs fer the entire development. 12. Please line the detention pond planned for this subdivision to prevent future fluctuation in the pond water levels. This is a constant source of complaints as subdivisions in this area develop. Dewatering, mining and many other factors effect the water level of these ponds and lakes. 13. Why are the outlet and inlet pipes for the pond the same diameter? 14. There is a structure closer to the pond. Why isn't it utilized for the pond outlet rather than the one you have indicated? 15. The offsite storm drain, from the lake to Hazel Deli Parkway, will require an easement since this area is not platted and will not be platted until Section 2 is constructed. 16. Include underdrains under thc towline of the ditch in the back yards of lots l through 10. We are concerned this area will be a constant source of complaints regarding ponding water once hemes are built. We are also requesting the mounding be maintained, without breaks, along the west perimeter in the common area. 17. Please indicate elevations for the existing storm stmctare at the southwest comer of the development. ONE CIVIC SQUARE CARMEL, iNDIANA 46032 ~ 17/371-244/ Mr. Curt Crosby March 2, 1999 Page 2 18. Please be aware The Lakes at Hazel Dell will be required to construct a passing blister on the north side across from their 126~ Slreet entrance. This will be required when right-of-way on the north side of 126th is available. The consa'uc~ion of the acel/decel lanes at your entrance should be coordinated with The Lakes at Hazel Dell enlrance plans. 19. Extend the curb underdrains the full length of the acel/deeel lanes. 20. On Sheet C301, Section "A-A" docs not indicate curbing on the north side of 126~. I am enclosing a copy of a letter from Kate Boyle-Weese to Matte Mouree concerning terms of design and development fluat were agreed to and accepted by the developer. If you have questions, please call. Dick Hill, Assistant Director Department of Engineering Enclosure M. Kate Boyle-Weese, City Engineer Mark Monroe, Department of Community Services Craig Parks, Assistant City Engineer Carmel Utilities Steven Van Soelen, Estridge Development S:~PRO JRE V99~O V ERTURE 1 F~ 24, 1~ J. Con Crosby The Schneider Gorporalfon 3020 Post Road Indianapolis, Indiana 467-26-65'18 RE; The Overiure, Section 1 Secondary Plat and Construction Plans N of 126~ Stree~ I W of Hn7~_I Dell Parkway Clay Township Dear Mr. Crosby: This letter se~ves to acknowledge receipt of a transmiUal containing the secondary plat and consltuction plans for The Overture, Section 1. After review'ag the plans it was deten'ntned that this project is Iooated within the City of Carmel and will no affect made wi~n the Hamilton County H'~Thway inventory, therefore no furUqer comments apply. If you'have any comments or questions regarding this letter or project, please feel free to contac[ me at any thlle. Thank you for your attention and cooperation. Steven J. Bmermann F.~gineering Technician 02-24-99. ad Carmel DOCS Hamilton County Surveyor Hamilton County Soil and Water 17t7 pLEASANT STR~:ET NOBLR;$V:tI. LE, [~DXAN,R 460~0 (3t7) 773-'7770 Carmel P lice Depar men $ Civic Square c~vmel, Inai~a 460~2 February 23, 1999 Mr. J. Cort Crosby, P.E. The Schneider Corporation 3020 North Post Road Indianapolis, IN 46226-6518 RE: The Overture, Section 1 Dear Mr. Crosby: I have received and reviewed the secondary plat and construction plans of the above mentioned project. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any furthe[ assistance to you, please contact us. Respectfully, Michael D. Fogarty Chief of Police MDF:vb cc: Mark Monroe, Dept. of Community Services A Nationally Accredited Law Enforcement Agency (:~17) $71-2500 F~ 1517) 571-2512 HAMILTON COUNTY HEALTH DEPARTMENT CHARLES HARRIS, M.D. · HEALTH OFFICER February 23, 1999 J. Cort Crosby, P.E. The Schneider Corporation 3020 North Post Road Indianapolis, IN 46226-65 !8 Re: The Overture, Section One Dear Sir or Madam: I have received a copy of the above referenced project. As the site is served by sanitary sewer and public water, this office does not have any comments at this time. If you have any question, please contact me. Sincerely, ONE HAMILFON COUNTY SOt;ARE, SUITE 30 Nom.esvn ~ ~, [~mAnA 46060-2229 (317) 776 8500 · FAX (317) 776-85(16 City of Carmel Fire Department Headquarters 2 CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2600 The Schneider Corporation Attn. J. Cort Crosby, P.E. 3020 North Post Road Indianapolis, Indiana 46226-6518 RE: THE OVERTURE, SECTION 1 LETTER OF APPROVAL The undersigned has reviewed the proposed plans for The Overture, Section 1 and has approved the plans subject to the following: I. After review of this project, I have no additional requirements to be met at this time. Date:_Febmary 23, 1999 By: Stanley Puckett, Fire Marshal Carmel Fire Department Residential Development Services 3020 North Post Road Indianapolis, IN 46226-6518 www. theschneidercorp.com 1-800-898-0332 toll free 317-898-8282 phone 317 899 B010 fax February19,1999 Mark Monroe Department of Community Services 1 Civic Square Carmel, IN 46032 RE: The Overture, Section 1 Dear Mark, I have enclosed two copies of the secondary plat and construction plans for the The Overture, Section 1 as well as the secondary plat application, application fees, and development report. We hope to have these plans reviewed at the March 17, 1999 TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, THE SCHNEIDER CORPORATION J. Cort Crosby P.E. Project Engineer Formerly Schneider Engineerhag Corp. / Bohlen, Meyer, Gibson & Assoc. Offices ha Indianapolis. Avon. Carmel and Lafayette, Indiana February 19, 1999 Barry McNulty Hamilton County Health Department, Suite 30 One Hamilton Square, Suite 30 Noblesville, IN 46060 RE: The Overture, Section t DearBarry: I have enclosed the secondary plat and one set of construction plans for the project listed above. These plans will be reviewed at the March 17, 1999 TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, THE SCHNEIDER CORPORATION J. Cort Crosby, P.E. Project Engineer JCC Enclosures Residential Developmem Services February 19, 1999 James Neal Hamilton County Engineer/Highway 1717 East Pleasant Street Noblesville, IN 46060 RE: The Overture, Section 1 Dear James: I have enclosed the secondary plat and one set of construction plans for the project listed above. These plans will be reviewed at the March 17, 1999 T^C meeting. Please forward your review comments to me or call if you have any questions. Sincerely, THE SCHNEIDER CORPORATION J. Cort Crosby, P.E. Project Engineer JCC Enclosures February 19, 1999 Dave Klingensmith Carmel Street Department 211 Second Street SW Carmel, IN 46032 RE: The Overture, Section 1 Dear Dave: I have enclosed the secondary plat and one set of construction plans for the project listed above. These plans will be reviewed at the March 17, 1999 TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, THE SCHNEIDER CORPORATION J. o~Crosby, P.E. ~'~ Project Engineer JCC Enclosures February 19, 1999 Brian Houghton Jones & Henry 2420 North Coliseum Blvd., Suite 214 Fort Wayne, IN 46085 RE: The Overture, Section 1 Dear Brian: I have enclosed the secondary plat and one set of construction plans for the project listed above. These plans will be reviewed at the March 17, 1999 TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, THE SCHNEIDER CORPORATION O. Cort Crosby, P.E. Project Engineer JCC Enclosures February 19, 1999 Roger Harper Carmel/Clay Schools 5201 East 131st Street Carmel, IN 46033 RE: The Overture, Section 1 Dear Roger: I have enclosed the secondary plat and one set of construction plans for the project listed above. These plans will be reviewed at the March 17, 1999 TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, THE SCHNEIDER CORPORATION rosby, P.E. Project Engineer JCC Enclosures February 19, 1999 Bart Bretsh Ameritech 5858 North College Avenue Indianapolis, IN 46220 RE: The Overture, Section 1 Dear Bart: I have enclosed the secondary plat and one set of construction plans for the project listed above. These plans will be reviewed at the March 17, 1999 TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, THE SCHNEIDER CORPORATION J. Cort Crosby, P.E. Project Engineer JCC Enclosures 1-800-898-0332 toll free February 19, 1999 L. Joe Cook Hamilton County Sheriff's Department 18100 Cumberland Road Noblesville, IN 46060 RE: The Overture, Section I Dear Joe: I have enclosed the secondary plat and one set of construction plans for the project listed above. These plans will be reviewed at the March 17, 1999 TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, THE SCHNEIDER CORPORATION J. r~sby, P.E. Project Engineer JCC Enclosures ~.~ ~D~TlopmentServices February 19, 1999 Stan Puckett Carmel Fire Department Investigations 2 Civic Square Carmel, IN 46032 RE: The Overture, Section 1 Dear Stan: I have enclosed the secondary plat and one set of construction plans for the project listed above. These plans will be reviewed at the March 17, 1999 TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, THE SCHNEIDER CORPORATION J. Cort Crosby, P.E. Project Engineer JCC Enclosures Residential Development Services February 19, 1999 Michael Fogerty Office of Carmel Police Chief 3 Civic Square Carmel, IN 46032 RE: The Overture, Section 1 Dear Michael: I have enclosed the secondary plat and one set of construction plans for the project listed above. These plans will be reviewed at the March 17, 1999 TAC meeting. Please forward your review comments to me or call if you have any questions. Sincerely, THE SCHNEIDER CORPORATION J. Cort Crosby, P.E. Project Engineer JCC Enclosures Cky of Carmel ~<~ rc~ c..'-::' DEPARTMENT OF ENGINEERING December 23, 1998 Mr. Mark Monroe, AICP Department of Community Services One Civic Square Carmel, 1N 46032 RE: Overture Variance Requests by Estridge Development Company Dear Mark: I would like to offer the following comments with respect to my previous letter dated December 15th, 1998, regarding file above mentioned requests for reduction in sheet width and carve radii. While the Engineering Department maintains our standard policy on the recommendation of 30-foot street widths and 150-foot curve radii for new developments, I have met with thc petitioner, discussed ia detail, and considered this particular development's goals as to the reduction in street width and street curve radius. With certain restrictions and conditions agreed to by the developer, this department would not oppose the reduction in street width from 30 feet to 26 feet and the reduction in the corve radius oftbe internal meets flora 150 feet to 75 feet. As mentioned in my letter, concerns for Waffle, safety and maintenance were the primary reasons for oar opposition of this request However, the following terms of design and development were agreed to and accepted by the developer and will substantially alleviate the majority of these concerns. · Paflcing will be restricted to one side only within the subdivision. This will be accomplished through the covenants of the development, and upon annexation, will be supplemented by the passing of an Ordinance by the City of Carmel. Further, the petitioner has committed that any further parking changes would require approval of the Planning Commission until the streets are owned by the City. This parking restriction will ensure clear access for emergency vehicles, snow plowing and safer passage/maneuverability of vehicles through the narrower street width. · Panking will not be permitted (on either Side) along the curved sections of roads within the subdivision. · The developer's engineer (Schneider Engineers, Cott Crosby, P.E.) will certify as to the safety of the reduced street curve radii for the design speed used. (The restriction of parldng through these curved sections will also improve safety.) · Street tree plantings or the construction of any structure of a pernuaent nature will not be permitted within three feet behind the curb throughout the development. · The full 50-foot fight-of-way width will still be dedicated with tile plat. It is my understanding the petitioner, Estridge Development Company, is appearing before the Planning Commission meeting on January 19m, 1999. I will be happy to appear at that time to explain my statements further if necessary. City Engineer Mayor James Brainard Steve Engelking, Department of Community Services Dick Hill, Department of Engineering ONE CIVIC SQUAI[[i CAF, MEI., INDIA NA 46032 117/57D2441