Loading...
HomeMy WebLinkAboutTricor Supplemental Instruction 1 Jan 4 2012.pdf Supplemental Instruction DATE: January 4, 2012 SI No: 1 PROJECT: Tricor Automotive Group, Inc. Keystone Office Park 3003 E. 98th St. – Suites 265 & 271 Indianapolis, IN PROJECT NO: I1127712 TO: Tom Spencer Meridian Management Corporation COPIES TO: File Kelli Arnold The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. If the Work indicated in this supplemental instruction will require a change in the Contract Sum or Contract Time, Contractor shall notify Architect in writing within five days and submit Work Change Proposal indicating the proposed change to Contract Sum or Contract Time required by the Work indicated in the Supplemental Instruction. DESCRIPTION: Sheet A204 -Finish Specifications P1 Paint Mfg: Sherwin Williams Color: SW7508 Tavern Taupe B1 Vinyl Base Mfg: Johnsonite Color: 80 Fawn ISSUED BY: CARSON DESIGN ASSOCIATES Stephanie Bond CARSON DESIGN ASSOCIATES www.carsondesign.com TEL 317.843.5979 FAX 317.843.5975 2325 POINTE PARKWAY SUITE 200 CARMEL INDIANA 46032