Loading...
HomeMy WebLinkAboutCorrespondenceMr. Charles Wcinkauf, Chairman Zoning A~s Board City of Carmel, In. Mr. W¢ink~llf and Bo/lid Mcnlbcr$, 10-23-2004 Rc: Varim~cc Granted / Failure to Comply Monday morning 10-18-2004 I called thc Cannel Lutheran Church to advise that silt was flowing into our lake again, as in 1997-98. I and other residents also called various City of Carmel Departments and l'flexi complaint rcclu~fing thc City Engineer, Building Inspector, Office of Building Permits or other appropriate responsible authority immediately visit thc site located at thc NE corner of 13 l'~t and Gray Rd., inspect and enforce thc restrictions of silt control which wcrc integral to thc granting of variance. Immediately al'tcr this series of phone calls, Pepper Construction Supt. canoe to our lake and denied that thc mud conm~g into our lake was from thc Church construction site. When wc registered our complaint with thc Church there wcrc NO measures in place to prevent thc flow of mud from approximately 8.5 acres directly to a single surface drain to our lake. Immediately following our complaint a single piece of silt control fabric approximately 3ft. Sq. was placed directly in front of thc above mentioned drain. Later in thc morning a Code Enforcement Inspector arrived at thc job site, wc exchanged greetings, registered our complaint, nude reference to thc pre-construction silt control requirement, a~d lc£t. When I returned home there was a message on my answering machfl~c from thc Cannel Lutheran Church liaison infomfing mc that thc Church had done all required, they wcrc keeping their mud on their property and them was nothing else to bc done, call if you have any questions. ApproMnmtcly 3:00 P.M. I rcccivod a phone call from Mr. Frod Glazier of Carmel Building Inspection/ Code Enforcement and was told "thc Church and fl~c Contractor had complied wilh all thc requirements, Hamilton County Drainage District agrcc~ that all actions required had bccn met, there was no violation ,and there was nothing thc City of Carmel can do. Tuesday 8:00 A.M. Wc mcr with representatives of thc Church and thc contractor. Wc wcrc informed that all rcq~rcd provisions had been met, and they were in compliance. When asked if thc ~'rcquircd silt preventative provisions had bcxn ~tcd by thc city bcforc construction began we wcrc told, "Didn't know about any requirement, there is no rcquircmcnt in thc plans." I pointed out thc silt concern issue as result of thc damage to our lake during Church construction under variance in 1997-98 was a major issue at thc variance hearing. Thc Church, thc Pastor, thc engineering company, thc construction company, and church counsel were all prcsem when thc Chairman of thc Zoning ~s Board charg~ thc representative o£ thc City Engineering Department with thc responsibility of inspecting and asstmng adequate mcasurcs were in place to prevent further dmnagc to our pond, and thc representative acknowledged that responsibility with an affirmative answer. I further stated we felt betrayed and thc commitment made by thc Church at thc a~s hearing appeared to bc backed by thc same lack of regard or responsibility demonstrated in 1997-98. Wc feel as though wc have been lied to, I hope it is explainable by a lack of communications. Mr. Miller, head of thc Church Building Committee stated emphatically "thc Church doesn't lie" We will honor our conunitmcnt and do what is necessary T~sday Mtcrnoon I rcc~ivc, d a phone carl from Mr. Kcvin Brcnnan, Code Enforeemcnt In~tor with whom wc had met with Monday morning at thc job site and who subsequently respected ~c job site. Mr. Brcnnan smW, d afl provisions and rcqmrc~n~ lind been met, therefore there was no recourse thru thc City of Carmel. Wc met with thc Church and contractor again Friday 10-22-2004 8:00A. M. Mr. Gary Duncan, Assistant City Engineer and Mr. John South of Hamilton Count), Drainage District were present. It was determined within the first series of statements that that thc rcq~~ provisions and measures wcrc not in place at this amc, and had never been in place. Thc statements of full compliance directed to us by thc Church mgl thc contractor on thc previous Tuesday wcrc FALSE. I questioned Mr. Dunean as to why thc city had not camcd through with a pre-construction silt control measures inspection and he stated his dc~tmcnt was unaware of such a requirement. I stated "This is a rcpla3' of 1997-98, I believe you can understand why wc arc paranoid. Wc can not count on what wc arc told or commitments given. This is last time, any mom game over." At this point thc meeting turned to thc actions taken since our complaint of Monday morning. Haccmcnt of silt fabric and straw bales in thc road side ditch downstream of thc Church property drain and some rip-rap in front of thc drain. Mr. South these actions were either unfinished or not fully ins~cd. Wc asked ff there was any action to bc taken regarding thc moundc, d berm of raw earth sonm 3 to 5 feet tall nmmng thc entire length cast/west on thc northern boundary, and north/south on thc eastern boundary Silt rcnc, e has been instan~ on thc outsi& perimeter. No silt l'¢nc, c was in place on thc interior of this raw earth berm and thus silt and flowing mud would be channeled to thc southeastern comer, thc precise location of thc drain offending our lake. No one other than residents thought this presented a problem. We then asked what plans were ia place to dig thc retention pond. Thc construction company told us they would start digging at thc drain and work away from thc drain. When qucstionod hc agreed that all surface nm off would then drain thru this raw earth (muddy) hole and directly to thc offending dram. I asked that they consider a temporary re-fouling of thc run-off around thc detention pound to drain. This suggestion was met with polite un-enthusiasm. At this point we excused ourselves from thc meeting. Upon leaving I met with Gary Duncan briefly and stressed thc importance of his dctcmfining thc cause and location of thc communications breakdown. Saturday 10-23-2004 wc arc again rceeivi~ silt flow into our lake. There is a large mound of raw carth located in thc dctcntion pound in front of thc chain. Wc ask thc Board of Zoning A.~s to rescind and wiflglraw thc variance(s) granted, rccluirc petitioner to post bond in thc mount of $150,000 minimum specifically for thc protection of thc owners of Brookshirc Lower Iatkc. We also request that rescinded permits not bc re-instated until effective and mcamn~ul anti-erosion and silt control measures arc in place and inspected. Wc further request that thc variance petitioner make fomlal written apology to thc Board of Zoning ~s and thc residents of Brookshirc Lakes. Warrcn H. Waltcrs on bchatr of Brookshirc Lakes September 17, 2004 J~k'v1ES BRAINARD, MAYOR Mr. James K. Shinneman, PE Weihe Engineers, Inc. 10505 North College Avenue Indianapolis, IN 46280 RE: Carmel Lutheran Church Expansion, Sanctuary & Youth Addition-Project Review #2 Dear Mr. Shinneman: This Department has received your comment letter dated July 23 and revised drawings dated September 3, 2004 based upon this Department's review of June 15, 2004 and input from concerned citizens and other reviewing agencies. Based on a review of your comments and the submitted drawings, the issues from the Department's first review were satisfactorily addressed. Thank you for making the requested revisions. Based on this Department's second review, please find the following comments: 1. Please add a note that requires the Contractor to match the existing sidewalk width for the sidewalk replacement in the fight-of-way. The City assumes that all curbing in the fight-of-way is to be rolled curb per the Rolled Curb Detail. If this is not the case, please contact the City as to the proposed fight-of-way curb so that the City can check if the other curb details meet the City requirements. If they do not, you will need to add City standard curb details and call these details out on the Plans. The sidewalk to be removed is sho.wn within the Construction Limits on the Demolition Plan but not specifically called out. Please note the removal of existing walbvay to the nearest joint in these areas. Please edit the right-of-~vay pavement section to be: 1.5" H.A.C. Surface #11 over 5" H.A.C. Base #5D over 7" Compacted #53 Stone over 4" Compacted #2 Stone. Please show right-of-way pavement hatching for the new right-of-way pavement to be installed on the Gray Road entrance (if there will be new pavement at this entrance). The Emergency Spillway elevation is noted as 792.48. To ensure proper construction, please connect the 792 contours in the southeast comer of the pond. Only the 793 contour lines would need to stop at the spillway opening. Will the existing storm water lift station be abandoned or will it continue to be utilized? Please remove the note for the 15-foot easement shown on the top of bank in the Pond Cross Section Detail. There is a flow arrow on the west side of the 131 st Street entrance which shows that the grade on the west side is to slope back to the street whereas the slope indicated on the east side drains from the street back to the curb turnout. The City assumes that the entire entrance drive will drain back to the curb turnout. ' 10. Please narrow the 131 ~t Street entrance lane to be 12.5-feet rather than the 20.27-feet shown. , . . o o . . DEPARTY, IENT OF ENGINEERING ONE CIVIC SQUARE, CARMEl., IN 46032 OFFICE 317.571.2441 FXX 317.571.2439 E~'bX~L engineeringCg:ci.carmel.in.us Mr. James K. Shinneman, PE September 17, 2004 Page 2 of 2 Please respond in writing to the above comments. If you agree to all of the above comments and make the requested changes, you may submit the appropriate number of copies for approval and this Department will approve the Drawings. If you have questions, please contact our office at 571-2441. Sin,7 G~~Jr., Assistant I Departme~ of Engineering cc: Ion Dobosiewicz, Department of Community Services: John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Jim Haag, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office John South, Hamilton County Soil & Water Conservation District Department Review File Copy ~ bqpps21user data lenglshared~DHill[PROJRE VO41CARMELL UTHERANEXPREV2.doc 'W'EI,H .NGIN RS, I N:C CIVIL ENGINEERS, ~ND SURVEYORS, ~ND PLAN '~': ........................................................................ ~.- ~~';~:~ ..... ... LETTER OF TRANSMITTAL To: Department of Community Services One Civic Square Job #: Carmel, Indiana 46032 Date: 03 September 2004 Phone: 571-2417 Attn: Jon Dobosiewicz /Angie Butler Fax: 571-2426 We are sending you rk'l Attached I-1 Under separate cover via delivery the following items' Fl Shop Drawings Fl Prints C] Copy of Letter F1 Product Data F1 Specifications D Meeting Minutes F1 Samples Fl Change Order(s) F1 Inspection Report F-I I--1 Sketches/Drawings I--1 Application(s) for Payment [2 Sets [8] Copies Document Date Document Number Description 2 Sets of Revised Construction Plans (one for Scott Brewer) These are transmitted as indicated below: [-1 Approved F1 Approved as Noted D Not Approved, Revise and Resubmit Fl Action Not Required D Action Indicated on Item Transmitted [3 For Signature. Return ~ Copies to Us [~] For Your Review or Use I-1 For Your Review & Comment 1-] As Requested [2] For Your Records [23 For Your Approval Remarks: The attached plans reflect the addition of approx. 60 trees to the North and East buffer yards to comply with the 19 trees per 100 linear foot ordinance. A written letter of approval from the Urban Forester would be appreciated if these changes satisfy the requirements and there are no other concerns. Please give me a call with any questions or comments. Thanks. CC.' ALLAN h. WEtHE... P.E,, L,$. * PRESIDENT 0505 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA 46280 (317) 846-6611 (800) 452-6408 FAX: (317)843q3546 City of Carmel Department of Community Services One Civic Square Carmel, IN 46032 317-571-2417 Fax: 317-571-2426 FACSIMILE TELECOPY COVER LETTER DATE' TO' August 18, 2004 Larry Kemper, Nelson & Frankenberger FAX' 846-8782 FROM' Connie Attached hereto are 5 pages, including this cover letter, for facsimile transmission. Should you experience any problem in the receipt of these pages, please call 317/571/2419 and ask for Connie. NOTES' You are listed as the contact person for this docket. Please make sure you notify your Petitioner(s). Attached are the Agenda and Department Report for the August 23, 2004 BZA. Please remember to bring the seven (7) additional fully filled-out Findings-of-Fact sheets and ballot sheets for each petition the night of the meeting for the Board's use. Please call if you have any questions. CONFIDENTIALITY NOTICE: The materials enclosed with this facsimile transmission are private and confidential and are the property of the sender. The information contained in the material is privileged and is intended only for the use of the individual(s) or entity(ies) named above. If you are not the intended recipient, be advised that any unauthorized disclosure, copying, distribution or the taking of any action in reliance on the contents of this telecopied information is strictly prohibited. If you have received this facsimile transmission in error, please immediately notify us by telephone to arrange for return of the forwarded documents to us. Butler, Angelina V From: Sent: To: Subject: Dobosiewicz, Jon C Monday, August 16, 2004 8:24 AM Butler, Angelina V FW: Carmel Lutheran Church FYI ..... Original Message ..... From: Duncan, Gary R Sent: Friday, August 13, 2004 3:20 PM To: Dobosiewicz, ~lon C; McBride, Mike T; Redden, Nick; Hill, Dick B Subject: Carmel Lutheran Church Jon, The Engineering Department has reviewed the proposed plans for the drainage system for the expansion of the Carmel Lutheran Church. It is our opinion that the Church has maximized the acreage from which storm water runoff is contained on-site and routed to the detention pond while still meeting the requests of the adjacent home owners for landscape berming/screening. The peak discharge from the detention pond has been restricted well below what is allowed under accepted practice and the City's standard. By Weihe's calculations, the allowable peak discharge from the site is 3.82-cfs. The proposed detention facility will produce a peak discharge of 1.17-cfs. This restriction was accomplished by enlarging the pond and making it a "wet bottom" pond in an effort to provide the maximum amount of storage volume. We would not request further restriction of the discharge or enlargement of the pond during our review of the final construction plans. Please call us if you have any questions, Gary R Duncan Jr., P.E. Assistant City Engineer City of Carmel Department of Engineering One Civic Square Carmel, Indiana 46032 (317) 571-2441 (317) 571-2439 (fax) gd u ncan @ci. carmel, in. us CIVIL ENGINEERS, LAND SURVEYORS, LAND PLANNERS, LA.~,DSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Department of Community Services Project: Carmel Lutheran Church - Sanctuary & Youth Addition One Civic Square Job #: W030545 Carmel, Indiana 46032 Date: 13 August 2004 Phone: 571-2417 Attn: Angie Butler Fax: 571-2426 We are sending you [k'l Attached F! Under separate cover via delivery the following items: [3 Shop Drawings ~ Prints F1 Copy of Letter F1 Product Data [3 Specifications F1 Meeting Minutes Fl Samples F1 Change Order(s) [-] Inspection Report E] [3 Sketches/Drawings E] Application(s) for Payment F1 Sets [83 Copies Document Date Document Number Description Sets of Revised Construction Plans (one for Scott Brewer) These are transmitted as indicated below: F1 Approved D Approved as Noted F1 Not Approved, Revise and Resubmit [2] Action Not Required F1 Action Indicated on Item Transmitted F1 For Signature. Return__ Copies to Us F~I For Your Review or Use E] For Your Review & Comment E] As Requested F1 For Your Records [3 For Your Approval Remarks: The attached Plans reflect the change from a dry detention basin to a wet retention basin. Please give me a call with any questions or comments. Thanks. Shauntl~ya~ EJ(A ALLAN H. WE1HE:. P.E,, LS, - PRESIDENT 0505 NORTH COLLEGE] AVENUE INDIANAPOLIS, INDIANA 46280 (317) E~46-661 I (800.) 452-6408 FAX: (317)843<)546 ch.aefer Technologies, Inc. I~~~, ohs, ~ 462 6 Fax ,number: AttentiOn:- No. Of pages follo ,.wing cover sheet: ,~' , · " ; 'Phone: 317-547-5204 .". " · Fax..' 317-543-0.603 .. " : ROBERT G. HUSER 4843 Essex Ct. Carmel, IN 46033 (317) 575-%~ (Home) Meeting Notes SCHMIDT ASSOCIATES Attendees: Adjacent Homeowners: Paul Xanders, Tom and loan Burkle, Dana and Susan Holbert~ Lois Schaeider, Bob Huscr, Anne Rambal, Jan O'Conner, Glenn Keller, Ory and Nikki Gorski Carmel Lutheran Church Building Committee: Pastor Luther Brunette, Serf Stellhom, Pastor Dan Schumm, SbArley Bain, Terry Myers Project Team: Allan Weihe, PE, Wcihe Engineers Jal~e Shillllerilall, PE, Weihe Engineers Shaun Ryan, Weihe Engineers Scott Miller, Pepper Construction /~reklttct~tre Engtntertng Tte~nolog~ Interior Design Landscope d rchlu~t~tra Wii-Fra-Mar Building 320 East Vermont Street Indlanapoli~ IN 46204a!640 317.263.6226 317.263.6224 (fax) From: Toby $. Winiger, AIA Project Architect twiniger~schmidt-arch.com Date: July 13, 2004 Re: Neighborhood Me~fing Cannel Lutheran Church 2003-032 2.1.2 Meeting: July 12, 2004 Time: 7:00 pm Location: Carmel Lutheran Church This meeting was the second meeting with the adjacent neighbors. The purpose of the meeting was to follow up with neighbors' concerns regarding landscaping, drainage, lighting, and noise from the chiller for the additions to Carmel Lutheran Church. All design issues discussed are subject to the final approval of the City of Carmel and Board of Zoning Appeals. UNFINIS~D /POSTPONED BUSINESS Drainage 1. The drainage from the Church property will be contained on site utilizing catch basins in the parking lot and a berm on the north and east side of the prope~y. Water from the Church's property will drain into the detention pond and then into the municipal storm sewer. Sev...er~_. neighbors, adjacent ~n the northeast comer of the Church's Pr_91~ny,..e._x .p~_ ._'ence stan '_ding water on t...h.._eir.prpp~ fi'om a · '-~.._~'.m...._ages~a~e_ ¢oll~ting.water from the_ad_i~nt home§. The Church's pr0j'~z~-Will not resolve this problerll, bro._water, that may come_.from the Ch~ch pro.r~ty cn .rrna.fly will he, diverted to thq ._,d.e...t, ._.~_...t. ip.,n, area and should reduce much o~fthe nmoffto the adiacent neiidlbors. SCHAEFER TECHNOLOGIE PAGE SCHMIDT ~TF~AS~ Meeting Notes for July 12, 2004 Meeting Carmel Lutheran Church Suly 13, 2004 Page 2 Landscaping NI. Jamie Shinneman and Shaun Ryan with Weihe Engineers reviewed a revised landscaping plan. It was agreed that the plan would be to remove all existing vegetation on the north and east edges of the property and replace with the minimum number of trees require, xl by the City of Cannel (19 trees for every 1 O0 feet). It was requested by the neighbors that evergreens be used in place of deciduous trees. The neighbors requested additional trees as well as additional height over the mimmm. Consideration will be given to additional trees and additional height~ if th, minimum will not provide an adequate barrier at full maturity. x 2. N3. As part of the landscape plan, a berm will be constructed on the north and east side. A section drawing showed the relationships of the parking lot, curb edge, berm, and vegetation. After review and discussion, the neighbors indicated that the 5' level area of the berm should be use to create additional height to the berm. The design will be reviewed to create an additional height. The Church would like to provide materials on the berm that would require the least maimenance. Grass, mulch, or other ground cover will be considered. No specific solution was deten~ned, but the Church will maintain the trees and landscaping on both sides of the berm to the property line. The Church asked the adjacent neighbors to contact them if the maintenance was not being done. . The construction sequencing of the Project will indicate this landscaping work to be installed this fall. Once a Construction Schedule is completed, the neighbors would be welcome to look at a copy. It was noted by Paul Xanders that installation ofthe landscaping before other work was completed might be detrimental to the plantings. It was noted that one neighbor adjacent to the southeast comer of the site, Lois Schneider, would like to keep three large trees. These will be located by a site visit and noted to remain. 6~ Paul Xanders, the property Owner directly north of the chiller, would like to be comacted by the Contractor installing the new landscaping across his property so he could coordinate relocation of his landscaping. . It was mentioned by Dana Holbert that he would possibly relocate a tree that he planted on the Church property. . It was mentioned by Tom and Joan Burkle that they would remove the playhouse that exists on the Church property. Site Lighting Plan Toby Winiger reviewed the Site Lighting Plan. All existing 30' high poles will be removed and replaced with 20' high poles, which meet the requirements for Cannel zoning. All lighting located at the perimeter of the parking areas will be placed on timers. As the plan indicated, foot-canOe levels at the property line are zero. SCHAEFER TECHNOLOGIE PAGE SC IDT ASSOCIATES Meeting Notes for July 12, 2004 Meeting Carmel Lutheran Church July 13, 2004 Page 3 2~ The neighbors requested that shorter poles be considered for the parking lots. Toby Winiger noted that this would increase the number of poles and create moro contrast required to maintain a safe level of lighting. No specific height was agreed upon, but the design will consider reduction of pole height. Noise Reduction from Chi'Her Toby Winiger revi~ed some info~tion regarding chiller noise. A sound attenuation blanket around the chiller unit was found to offer little sound reduction at a high cost. The neighbors indicated that they would still like to see some solution to sound reduction. Schn~dt Associates will study the currcmt noise levels and consider other options for reducing sound from the chiller equipment. If any of the abov~ does not sg~ with your understanding, please clarify by ~tum mail within s~van days of receipt, ~se, notes shall stand as written. TJW:jab Copy: All in attendance Mike W. Engledow, AIA, Sch~dt Associates, Inc. File M:~2003-032~Corr~ponden~~712MN_TJW..Attendem_0~,DOC II E RS, INC. CIVIL ENGINEERS, LAND SURVEYORS, LAND PLANNERS, LANDSCAPE ARCHITECTS July 23, 2004 Ms. Angie Butler Planning Administrator City of Carmel Department of Community Services One Civic Square Carmel, IN 46032 ph. 317.571.2417 fax. 317.5 71.2426 Re: Carmel Lutheran Church 4850 East 131st Street Carmel Docket No. #04060002 SUA & 04060003 V WEI Project No. W03-0545 Dear Ms. Butler: This letter is in response to the June 17, 2004 comment letter and June 16, 2004 TAC meeting comments regarding the above referenced project. Per your review letter and the TAC comments, the following are the responses to your comments: 1. A list of the adjacent properties from the Hamilton County Auditor's Office was provided to you by l_arry Kemper of Nelson & Fmnkenberger on July 21, 2004. 2. Please refer to the attached document regarding percentages of the breakdown between buildings, parking lot and parcel square footage. 3. The building addition height on the northwest addition is 30' and the new sanctuary height at the east is 34'. 4. The Findings of Fact sheet for the Special Use Amendment will be presented at the Board of'Zoning Appeals hearing on July 26, 2004. 5. Please see attached light fixmm details. 6. The privacy fence previously shown dta/ng the TAC submittal has been removed from the plan. 7. Please refer to the landscape plan for plant species as requested by Scott Brewer. 8. Planting locations have been taken into account vs. utility easements. 9. We have prepared a dedication document, which will be submitted to Carmel Engineering for review and ultimately the Board of Public Works for approval. We are dedicating 50-fi half right of way for 131st Street and 45'fi half right of way for Gray Road. I have submitted two (2) copies of the revised plans for Scott Brewer's and your use in the approval of the project. If you have any questions or need any additional information regarding the plan review comments, please contact me. Sincerely, James K. Shinnenmn, PE Project Manager Cc: File ALLAN H. WEIHE, P.E., L,S. - PRESIDENT 0505 NORTH COLLEGE AVENUE iNDIANAPOLIS, INDIANA 46280 (317) 846-661 ! (800) 452-640E~ FAX: (317)843-0~6 WEIH ENGIN E RS, INC. CIVIL ENGINEERS, LAND SURVEYORS' LAND PLANNERS, LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Department of Community Services Carmel Lutheran Church - Sanctuary & Youth Addition One Civic Square Job #: W030545 Carmel, Indiana 46032 Date: July 23, 2004 Phone: 571-2417 Attn: Angie Butler Fax: 571-2426 We are sending you I-x'l Attached F1 Under separate cover via delivery the following items: [3 Shop Drawings 13 Prints [3 Copy of Letter [3 Product Data F! Specifications F'l Meeting Minutes F1 Samples F1 Change Order(s) [3 Inspection Report [3 F1 Sketches/Drawings F1 Application(s) for Payment F1 Sets [8] Copies 1 Document Date Document Number Description Sets of Revised Construction Plans.(.~ae fo~ Scott Brew~i') Percentage breakdown of buildings, parking and parcel Light fixture details These are transmitted as indicated below: F1 Approved F1 Approved as Noted F1 Not Approved, Revise and Resubmit [3 Action Not Required 13 Action Indicated on Item Transmitted 13 For Signature. Retum ~ Copies to Us ~ For Your Review or Use [3 For Your Review & Comment 13 As Requested F1 For Your Records ~ For Your Approval Remarks: Please give me a call with any questions or comments. Thanks. James K. Shinneman, PE ALLAN H. WEtHE.. P.E., L.S. - PRESIDENT 0505 NORTH COLLEGE AVENUE iNDIANAPOLIS, INDIANA 46280 (317) 846461 I (800) 452-6408 FAX: (317)843'0546 JAMES J. NELSON CHARLES D. FRANKENBERGER JAMES E. SHINAVER LAWRENCE J. KEMPER JOHN B. FLATT FREDRIC LAWRENCE of counsel JANE B. MERRILL VIA HAND DELIVERY & FRANKENBERGER A PROFESSIONAL CORPORATION ATTORNEYS-AT-LAW 3105 EAST 98~ S~Ewr SUITE 170 INDIANAPOLIS, INDIANA 46280 317-844-0106 FAX: 317-846-8782 July 21, 2004 Jon C. Dobosiewicz Department of Community Services One Civic Center Carmel, IN 46032 Re.' Carmel Lutheran Church- Special Use. Amendment and Developmental Standards Variance Docket Nos. 04060002 SUA and 04060003V Dear Jon: Please find enclosed the following for the above-referenced matter: le 2. 3. 4. 5. Notice of Public Hearing; Affidavit of Mailing; Proof of Publication; List from Hamilton County Auditor regarding surrounding property owners; and Certified, return receipt requested cards which were returned by the surrounding property owners. The above-referenced docket matter is to be presented to the Carmel Board of Zoning Appeals on Monday, July 26, 2004. Should you have any questions, please contact me. Very truly yours, NELSON & FRANKENBERGER Lawrenc~p~r LJI~jlw Enclosures H:klanet\CLC~Dobosiewicz pub Itt 072104.doc City of Carmel Department of Community Services One Civic Square Carmel, IN 46032 317-571-2417 Fax: 317-571-2426 FACSIMILE TELECOPY COVER LETTER DATE: July 21,2004 TO: Larry Kemper, Nelson & Frankenberger FAX: 846-8782 FROM: Connie Attached hereto are 4 pages, including this cover letter, for facsimile transmission. Should you experience any problem in the receipt of these pages, please call 317/571/2419 and ask for Connie. NOTES: You are listed as the contact person for this docket. Please make sure you notify your Petitioner(s). Attached are the Agenda and Department Report for the July 26, 2004 BZA Hearing Officer meeting. Please remember to bring three (3) additional fully filled-out Findings-of-Fact sheets and ballot sheets for each petition the night of the meeting for the Hearing~Officer's, use. Please call if you have any questions. CONFIDENTIALITY NOTICE: The materials enclosed with this facsimile transmission are private and confidential and are the property of the sender. The information contained in the material is privileged and is intended only for the use of the individual(s) or entity(les) named above. If you are not the intended recipient, be advised that any unauthorized disclosure, copying, distribution or the taking of any action in reliance on the contents of this telecopied information is strictly prohibited. If you have received this facsimile transmission in error, please immediately notify us by telephone to arrange for return of the forwarded documents to us. GLENN & HOLLY KELLER C~I, ~ July 21,200~ Carmel Clay Board of Zoning Appeals Oue Civic Square Carmol, Indiaua 46032 To the Members of the Board; We arc writing about the request for a zoning variance that has been submitted by the Carmel Lutheran Church. Our property is immediately north of the church and backs onto the rear of the existing building and part of the proposed expansion. Our 1o~ sits 2 feet higher than the church parking lot, Wc have found the church to be a good neighbor and have rio wish to stifle {tte~ plans for expansion. We do however have 2 concerns that we would like the board to consider. 1). Be~ of the elevation of o~r lot and ifs orientation ~o the church building wc arc concerned about the loss of the cunvm landscaping. We understand ~he need m replace this but are re4u~g ~hat the now tree~ b~ ora minimum height at initial planting. A toial height of 12 f~t is adequate keeping in mind the elevation di~nce and that the church is a 2 sioW buildin{, This could mean a ? foot tree on top of the proposed 5 foot berm for example, 2). B~mse our lot slop~ down toward the church property, we are concerned that the berm as proposed, would create a valley cffoct trappin{ rain water aud breeding moequiioes. We would like a plan that insures this will not occur. Thank you for yOur consideration, Glenn & Holly Attachment: OIS Map Showing our Lot with Orientation and Elevation ........ . ,. ... Glenn & Holly Keller 4809 Essex Court Carmel, Indiana 46033 317 371-1091 Fax Transmittal Form Phone: J,L... .... I IIII ...... I I III_.. Message: From: Glenn Keller Date Sent: 7/21/04 Number of Pa~es: 3 II _ .. I II III .... , , This is for consideration'at the Board 'of Zoning Appeals meeting on 7/26/2004 ooncerning the Carmel Lmhemn Church project. From: Sent: To: Cc: Subject: Larry Kemper [larry@nf-law.com] Tuesday, July 06, 2004 2:40 PM AButler@ci.carmel.in.us; SBrewer@ci.carmel.in.us J Dobosiewicz@ci.carmel. in. us carmel lutheran church; docket nos. 04060002 SUA and 04060003 V Angie and Scott: After meeting with the surrounding neighbors to review our plans regarding the above, the neighbors have requested some changes to the landscape plan along the northern and eastern boundary lines. The neighbors want the scotch pines along the northern and eastern property lines removed and replaced with a berm and new landscaping. We have a follow up meeting the neighbors on July 12 to review the changes, but we would like to meet with you prior to that meeting to review the revised landscape plan and receive your thoughts. Would you be available to meet with myself, Mike Engledow and Jamie Shinneman sometime this Friday afternoon? Please let me know. PLEASE NOTE OUR NEW ADDRESS BELOW. Lawrence J. Kemper NELSON & FRANKENBERGER 3105 E. 98th St., Suite 170 Indianapolis, IN 46280 (317) 844-0106 (phone) (317) 846-8782 (fax) NOTICE OF CONFIDENTIALITY This E-mail message and its attachments (if any) are intended solely for the use of the addressee hereof. In addition, this message and the attachments (if any) may contain information that is confidential, privileged and exempt from disclosure under applicable law. If you are not the intended recipient of this message, you are prohibited from reading, disclosing, reproducing, distributing, disseminating or otherwise using this transmission. Delivery of this message to any person other than the intended recipient is not intended to waive any right or privilege. If you have received this message in error, please promptly notify the sender by reply E-mail and immediately delete this message from your system. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error please notify the system manager. From: Sent: To: Cc: Subject: Brewer, Scott I Tuesday, June 29, 2004 5:31 PM 'Jamie Shinneman'; Shaun Ryan; Butler, Angelina V Dobosiewicz, Jon C Meet the Neighbors/Carmel Luthern Church Landscape plans Callery Pears Invasive (short)... Shaun: The set of landscape plans I received June 24th, 2004, had an ammended plant schedule included. There two forms of ornamental maples, two types of callery family ornamental pears, and one linden species. The maples and the pears are not shade trees. 1. Please plant shade trees in the parking lot. 2. Tilia cordata is very suseptable to japanese beetle attack. Please use Tilia tomentosa (Sterling silver Linden) or Tilia americana (American Linden ie Redmond, etc.) instead. 3 Please choose a shade tree to replace one species of the maples, perferably sugar or norway. 4. Please chose shade trees to place the 58 callery pears currently on the plan. Eventhough the different callery varieties are improved from the Bradford, they are still short lived ornamental species. There is a growing amount of evidence that the different cultivars crossbreed and become invasive in the landscape. We prefer to see large or medium maturing shade trees for this site an in the parking lot. 5. Ail the parking lot islands and pennisulas should be planted with at least one large or medium growing shade tree. One per every 400 sq. feet of planting area. The large rows in the north east parking lot should have another site of islands inserted about half way between the ends 6. This is our modified Street Tree List for medium and Large maturing species' MEDIUM TREES Suitable for tree lawns 6 to 8 feet wide, but not under wires. Aesculus x carnea 'Briotii' - Rubyred Horsechestnut Alnus cordata - Italian Alder Alnus glutinosa - European Black Alder Betula nigra - River Birch Betula nigra - River Birch Carpinus betulus - European Hornbeam Cladrastis kentukea - Yellowwood Fagus sylvatica 'Purpurea Tricolor' or 'Roseo-marginata' - Tricolor Beech Gleditsia triacanthos inermis 'Impcole' - Imperial Honeylocust Koelreuteria paniculata - Golden-Rain Tree Nyssa sylvatica - Sourgum / Blackgum Ostrya virginiana - Hophornbeam Phellodendron amurense 'Macho' - Male Corktree Quercus robur 'Fastigiata' - Pyramidal English Oak Quercus robur 'Skyrocket' - Skyrocket English Oak Sophora japonica - pagodatree Tilia x flavescens 'Glenleven' - Glenleven Hybrid Linden LARGE TREES Suitable for tree lawns at least 8 feet wide and not under wires Acer nigrum - Black Maple Acer platanoides 'Emerald Queen' - Emerald Queen Norway Maple Celtis laevigata 'Ail Seasons' -Ail Seasons Sugarberry Corylus colurna - Turkish Filbert Eucommia ulmoides - Hardy Rubber Tree Fagus grandifolia - American Beech Fagus sylvatica - European Beech Ginkgo biloba - Ginkgo (male only) Gleditsia triacanthos inermis ~Moraine' - Moraine Honeylocust Gleditsia triacanthos inermis 'Shademaster' - Shademaster Honeylocust Gymnoclanus dioica - Kentucky Coffeetree Liriodendron tulipifera - Tuliptree Magnolia acuminata - Cucumber Magnolia Metasequoia glyptostroboides - Dawn Redwood Platanus x acerifolia 'Bloodgood' - Bloodgood London Planetree Platanus x acerifolia 'Columbia' - Columbia London Planetree Platanus x acerifolia 'Liberty' - Liberty London Planetree Quercus alba - White Oak Quercus bicolor - Swamp White Oak Quercus coccinea - Scarlet Oak Quercus macrocarpa - Bur Oak Quercus muehlenbergii - Chinkapin Oak Quercus rubra - Northern Red Oak Taxodium distichum - Bald Cypress Tilia americana 'Redmond' - Redmond Linden Tilia tomentosa - Silver Linden Ulmus parvifolia * - Chinese / Lacebark Elm Ulmus parvifolia * 'Dynasty' - Dynasty Chinese Elm *Limit use Undesirable Street Trees: Comments: Acer negundo - Boxelder: Aggressive, Shallow roots, Weak wood Acer rubrum - Red Maple: Shallow roots, Easily damaged, Chlorotic Acer saccharinum - Silver Maple: Aggressive, Shallow roots, Weak wood Ailanthus altissima - Tree of Heaven: Seeds, Suckers, Weak wood Betula papyrifera - Paper Birch' Insects Betula pendula - Euorpean White Birch: Insects Elaeagnus angustifolia - Russian Olive: Form, Disease Fraxinus velutina glabra - Modesto Ash' Sidewalk damage problems Fraxinus Sps. - Emerald Ash Borer exotic pest Ginkgo biloba - Female - Female Ginkgo' Fruits Morus species - Mulberry: Fruits, Shallow roots Picea or Pinus species - Spruce or Pine' Shallow roots, Low branches, Salt spray Pyrus calleryana ~Bradford' - Bradford Pear: Weak branching, Low branches Populus alba - White Poplar: Suckers, Shallow roots, Weak wood Populus deltoides - Cottonwood: Weak wood, Shallow roots, Seeds Populus nigra 'Italica' - Lombardy Poplar' Insects, Disease, Short-lived Quercus palustris - Pin Oak: Soil problems, Yellowing, Low branches Salix species - Willow' Weak wood, Shallow roots Ulmus americana - American Elm: Insects, Disease Ulmus pumila - Siberian Elm: Weak wood, Seeds Scott Brewer Urban Forester, City of Carmel Department of Community Services One Civic Square Carmel, IN 46032 (317) 571-2478 ..... Original Message ..... From: Jamie Shinneman [mailto:shinnemanj@weihe.net] Sent: Tuesday, June 29, 2004 4:35 PM To' 'Mike W. Engledow'; Luther Brunette; Shirley Bain; Toby J. Winiger; Jeff Stellhorn; Jamie Shinneman; Larry@nf-law.com; smiller@pepperconstruction.com; mmccann@pepperconstruction.com Cc: Shaun Ryan; 'SBrewer@ci.carmel.in.us' I have been in contact with the Urban Forester, Scott Brewer, at the City of Carmel in regards to the Scotch Pines along the North and East boundaries of the Carmel Lutheran Church. I let him know of the Church's and the neighbor's interest in removing them because they are beginning to die out. He was aware of the situation because he has a friend in a neighboring subdivision that had these same pines planted around the same time. He did not have a problem with a complete removal of the trees. However, he suggested that it would make sense if we left the trees up during the construction of the parking lots and buildings in order to maintain some sort of a buffer for the adjacent neighbors. Once the parking lot and building construction were complete, then we could replace the trees. The landscaping would have to be replaced at Buffer Level D per the City of Carmel Zoning Ordinance, Section 26.4. That level requires 5 shade trees, 5 ornamental trees and 27 shrubs or 9 evergreens per 100 lineal feet of frontage. He thought this would be a heavy hit financially for the Church. This same requirement is required along the frontages of Gray Road and 131st Street. Next, we discussed the possibility of replacing only a portion of the trees such as every 3rd tree or maybe just the trees that looked the worst for right now. Perhaps, replacing the entire North and East side over 6 to 10 years rather than replacing it all at one time. He felt this might not be such a hard hit to the Church financially. This would also maintain somewhat of the existing buffer. Each year the new trees would get a little larger as the older scotch pines came down for replacement and new trees went up. He said he would allow replacing each tree with one new 2-1/2" caliper shade or ornamental tree. Weihe Engineers will provide 4 species of shade tree and 4 species of ornamental tree to choose from on the Landscape Plan. The key to the replacement of these two bufferyards will be diversity. He does not want grouping of shade trees or grouping of ornamental trees. If we were to take out 3 or 4 trees in a row, we should put back alternating shade and ornamentals with each being a different species picked from the Weihe Engineers list. Hopefully, this isn't too confusing. The second option is probably the better option for both the Church and the neighbors. It would still provide most of the existing buffer, while being replaced over 6 to 10 years. It would also be financially easier on the Church to choose the second option. Please give me a call with any questions or comments. Thanks, Jamie WEIHE ENGINEERS INC. James K. Shinneman, PE Project Manager 10505 North College Ave. Indianapolis, IN 46280 Ph. (317) 846-6611 Fax (317) 843-0546 Toll Free (800) 452-6408 Email: shinnemanj @weihe. net This email and any files transmitted with it are confidential and intended solely for the individual or entity to whom they are addressed. If you have received this email in error destroy it immediately. Weihe Engineers, Inc. Confidential ..... Original Message ..... From: Mike W. Engledow [SMTP:engledowmw@schmidt-arch.com] Sent: Monday, June 28, 2004 8:10 AM To: Luther Brunette; Shirley Bain; Toby J. Winiger; Jeff Stellhorn; James Shinneman; Larry@nf-law.com; smiller@pepperconstruction.com; mmccann@pepperconstruction.com Subject' Meet the Neighbors Team, A quick update to assure that all of our ducks are in a row for tomorrow evening. Luther will be making the presentation to the neighbors. I confirmed on Friday that all relevant presentation boards are at the Church behind the copier in the Work Room. Toby will be present to assist with any technical questions should they arise. Scott Miller will be present to represent Pepper. The meeting starts at 7:00 and I understand that Jeff has been baking cookies all weekend for the event. One item Shirley brought to my attention on Friday was the Pines along the North and East boundaries. Some of the neighbors have expressed an interest in removing these trees. I know that the Urban Forester at the City of Carmel is interested in keeping these trees. The Church believes they are at the end of their useful life, are beginning to die out, and would like to see them removed. Jamie is going to call the Urban Forester today and try to understand his sentiments, so we have some boundaries to work within on Tuesday night. Jamie, please update the group via e-mail as to what Scott Brewer shares. To replace these trees in kind is a significant expenditure, and of course would take 20 years to create the type of buffer that is currently in place. The noise from the Chiller has also been brought up by the neighbors. We are looking into the feasibility and cost of adding sound absorptive blankets to the Chiller. We should have some understanding by Tuesday night. If this is a give on our part to appease the neighbors, it might be money well spent. Let me know if there are questions. Thanks, Mike SCHMIDT ASSOCIATES, INC. <http://www.schmidt-arch.com/images/Schmidt_Logo_Tiny.jpg> Architecture · Engineering · Technology · Interior Design · Landscape Architecture 320 East Vermont Street Indianapolis, Indiana 46204 317.263.6226 www.schmidt-arch.com <http://www.schmidt-arch.com/> Construction/Stormwater Pollution Prevention Plan Technical Review and Comment (Form 1) Project Name: Carmel Lutheran Church County: Hamilton Plan Submittal Date: 06/01/04 Hydrologic Unit Code' 5120201090020 Project Location Description: 4850 East 131st Street Latitude and Longitude: Civil Township' Hamilton Quarter: NW Section: 28 Township: 18 Range: 4E Project Owner Name: Schmidt Associates - Wil-Fra-Mar Building Contact: ?? Address: 320 East Vermont Street City: Indianapolis State: IN Zip: 46204 Phone: 317 263-6226 FAX: 317 263-6224 E-Mail: Plan Preparer Name: James Shinneman Affiliation: Weihe Engineers, Inc. Address: 10505 N College Ave City: Indianapolis State: IN Zip: 46280 Phone: 317 846-6611 FAX: 317 843-0546 E-Mail: IReview Date: 06/18/04 IPrincipal Plan Reviewer: John B. South P.E. CPESC IAgency: Hamilton County Soil and Water Conservation District IAaaress: 1108 South 9th Street Icity: Noblesville State: IN Zip' 46060 IPhone: 317-773-2181 FAX: 317-776-1101 E-Mail: john-south~iaswcd.org IAssisted By: PLAN IS ADEQUATE' A comprehensive plan review has been completed and it has been determined that the plan satisfies the minimum requirements and intent of 327 IAC 15-5. [--] Please refer to additional information included on the following page(s). [-~ Submit Notice of Intent (NOI)' Attach a copy of this coverpage when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NOI. A copy of the NOI must also be sent to the Reviewing Authority (e.g. SWCD, DNR). A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and revisions to the plan may be required at that time to address deficiencies. ~-] Please refer to additional information included on the following page(s). ~-] Submit Notice of Intent (NOI)' Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of PLAN IS DEFICIENT: Significant deficiencies were identified during the plan review. [~] Please refer to additional information included on the following page(s). [~J DO NOT file a Notice of Intent for this project. [~J DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re- submitted, and notification has been received that the minimum requirements have been satisfied. Plan Revisions [~ Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified in the Plan Review Section above. DNR, Division of Soil Conservation Page 1 of 4 Revised 12/09/03, Form 1 Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment (Form 1) IIProject Name: Carmel Lutheran Church IDate Reviewed: 06/18/04 The technical review and comments are intended to evaluate the completeness of the Construction/Stormwater Pollution Prevention Plan for the project. The Plan submitted was not reviewed for the adequacy of the engineering design. All measures included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a qualified individual with structural measures designed by a qualified engineer. The Plan has not been reviewed Cot other local, state, or federal permits that may be required to proceed with this project. Additional information, including design calculations may be requested to further evaluate the Plan. All proposed stormwater pollution prevention measures and those referenced in this review must meet the design criteria and standards set forth in the "Indiana Stormwater Quality Manual"from the Indiana Department of Natural Resources, Division of Soil Conservation or similar Guidance Documents. Please direct questions and/or comments regarding this plan review to: John B. South P.E. CPESC Please refer to the address and contact information identified in the Plan Review Section on page 1. Assessment of Construction Plan Elements (Section A) The Construction Plan Elements are adequately represented to complete a plan review: [-] Yes ~ No The items checked below are deficient and require submittal to meet the requirements of the rule. A A 11 by 17 inch plat showing building lot ~-~ 1 Index showing locations of required Plan Elements [7] 2 numbers/boundaries and road layout/names Narrative describing the nature and purpose of the [-~ 4 Vicinity map showing project location [--]3 project [7] 5 Legal Description of the Project Site [~] 6 Location of all lots and proposed site (Include Latitude and Longitude - NOI Requirement) improvements (roads, utilities, structures, etc.) Notation of any State or Federal water quality [---] 7 Hydrologic unit code (14 Digit) [-] 8 permits [-~ 9 Specific points where stormwater discharge will leave '[~]10 Location and name of all wetlands, lakes and the site water courses on and adjacent to the site Identification of potential discharges to ground ~ 11 Identification of all receiving waters [-~ 1.2 water (abandoned wells, sinkholes, etc.) Pre-construction and post construction estimate of [-~ 1.3 100 year floodplains, floodways, and floodway fringes [~ 14 Peak Discharge (10 Year storm event) Locations and approximate boundaries of all [~ 15 Adjacent landuse, including upstream watershed [-] 16 disturbed areas (Construction Limits) Soils map including soil descriptions and ~] 17 Identification of existing vegetative cover [--]1.8 limitations ~] 1.9 Locations, size and dimensions of proposed stormwater ~-] 20 Plans for any off-site construction activities systems (e.g. pipes, swales and channels) associated with this project (sewer/water tie-ins) [--]21 Locations of proposed soil stockpiles and/or [-~ 22 Existing site topography at an interval appropriate !borrow/disposal areas to indicate drainage patterns Proposed final topography at an interval appropriate to [~ 23 indicate drainage patterns DNR, Division of Soil Conservation Page 2 of 4 Revised 12/09/03, Form 1 Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment (Form 1) I[Project Name: Carmel Lutheran Church Il [Date Reviewed: 06/18/04 Assessment of Stormwater Pollution Prevention Plan (Sections B & C) the co s ction componen o/ he S o mwater reven on tan to mwater i!!!!~?:::!?~:~:~?:i measures to address erosion, sedimentation, and other pollutants associated with land disturbance and .~ construction activities. Proper implementation oft he plan and inspections oft he construction site are ~ .,~ o. necessary to minimize the discharge ofpollutants. The Project Site Owner should be aware that = ~ ~ ...... unforeseen construction activities and weather conditions may affect the performance of a practice or the '~ ~ effectiveness of the plan. The plan must be a flexible document, with provisions to modify or substitute ~ ~.. ~ B practices as necessary. [7] [--] ........ 1 Description of potential pollutant sources associated with construction activities Sequence describing stormwater quality measure implementation relative to land disturbing [~] [~ .....2 activities [7] [-] 3 Stable construction entrance locations and specifications (at all points of ingress and egress) ~] [-] [-~ 4 Sediment control measures for sheet flow areas [7] [--][--]5 Sediment control measures for concentrated flow areas [-~ [-~ [-] 6 Storm sewer inlet protection measure locations and specifications [-~ [--][~ 7 Runoff control measures (e.g. diversions, rock check dams, slope drains, etc .) [~] [--][~] 8 Storm water outlet protection specifications [-] ~ [7] 9 Grade stabilization structure locations and specifications ~ [--] ................... 10 Location, dimensions, specifications, and construction details of each stormwater quality measure ~-~ ~] ............. 11 Temporary surface stabilization methods appropriate for each season (include sequencing) ~] [-] ............... 12 Permanent surface stabilization specifications (include sequencing) [-] [~] ................ : .... 13 Material handling and spill prevention plan ........ [~ [-] 14 Monitoring and maintenance guidelines for each proposed stormwater quality measure [-] [~] [~] 15 Erosion & sediment control specifications for individual building lots iiiiiiiiiiiiii:.ii~iiiii The post constructton component of the Stormwater Pollutton Preventton Plan tncludes the ,~ '?i~i:~i:~!~ ~=~.~:~=~ implementation of stormwater quality measures to address pollutants that will be associated with the ::iiiii~ final landuse. Post construction stormwater quality measures should be functional upon completion of ~ !i'~iiii the project. Long term functionality of the measures are critical to their performance and should be ~ ~ monitored and maintained. ~] [-] .................... 1 Description of pollutants and their sources associated with the proposed land use ~] [-~ 2 Sequence describing stormwater quality measure implementation Description of proposed post construction stormwater quality measures 3 (Include a written description of how these measures will reduce discharge of expected pollutants) [~J [-~ ........................ 4 Location, dimensions, specifications, and construction details of each stormwater quality measure [~] ~] .............. 5 Description of maintenance guidelines for post construction stormwater quality measures DNR, Division of Soil Conservation Page 3 of 4 Revised 12/09/03, Form 1 Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment IDate Reviewed: 06/18/04 B2 Include the rock donut for the pond outlet to be installed prior to site work- step #3. B 11- In the Erosion Control Notes 2nd paragraph- Change the 20days to 15 days to match current Rule 5 criteria. B 13- The plans need to address comon pollutants on a site- concrete washout, solid waste, fueling and equipment repair, paints, cleaners and other solvents. The spill prevention plan should describe methods to prevent spills and what actions to take if a spill occurs. C3- To improve the function of the dry basin for stormwater quality, it should retain the first flush of stormwater ( 1" ) for a minimum of 12- 18 hours. cc: Carmel, Surveyor, File DNR, Division of Soil Conservation Page 4 of 4 Revised 12/09/03 Original by mail FAX: 843-0546 June 17, 2004 Jamie Shinneman Weihe Engineers 10505 N College Ave Indianapolis, IN 46280 Carmel Lutheran Church (#04060002 SUA & 04060003 V)- Special Use & Variance Dear Mr. Shinneman: This letter is in response to your Special Use & Development Standards Variance Applications for Carmel Lutheran Church. The members at the TAC meeting, June 16, made additional comments. Please COmplete the following items: · ,, ~1. Provide the official list of adjacent proPerties fOrm the Hamilton County Auditor's Office. L~.-, 2. Asyou are well aware, the maximum lot coverage is 35%, including the parking lot. Please show the percent breakdown of buildings and parking lot square footage vs. the parcel square footage. 3. Please provide the building addition height (must be less than or equal to 35 feet). 4. Please provide a filled out Findings of Fact sheet for the Special Use Amendment. c_ ~ 5. Please provide light fixture details. Show flat lenses and 90-degree cutoff. 6. Please address the privacy fence extension on north property line vs. tree plantings. 7. Per the urban forester, please label plant species on the landscape plan. 8. Please pay attention to planting locations vs. utility easements. 9. The Thoroughfare Plan requires a 50-ft half R/W on 131st St. and a 45-ft half R/W on Gray Rd; the Department will require dedication of fights-of-way. If you have any questions or if I may be of assistance please do not hesitate to call. Sincerely, Angelina Butler Planning Administrator CarmeLutheranChurch-SUA Page 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 City of Carmel Fire Department Headquarters 2 CIVIC SQUARE CARMEL, INDIANA 46032 Voice (317) 571-2600 Fax (317) 571-2615 Fire Prevention Bureau James Shinneman, PE Weihe Engineers, Inc. Indianapolis, IN 46280 RE: Carmel Lutheran Church Sanctuary / Youth Addition LETTER OF APPROVAL The undersigned has reviewed the proposed plans for Carmel Lutheran Church Sanctuary / Youth Addition and has approved the plans subject to the following: . Will the entire building be protected by an automatic fire suppression system or just the addition? A meeting will need to be scheduled to discuss the location of the fire department connection. , We are requesting the installation of a Knox box for fire department access. If the building is sprinklered, we will be requesting the Knox fire department connection cap(s). An application for Knox products is available directly from the Knox Company at www.knoxbox.com , If the building is equipped with a fire alarm system, we are requesting that the enunciator panel be located at the main entrance. 4. Will this building have a basement? If so, what is the square footage of the basement? . . Please respond to the above noted condition(s) in writing and submit to our office prior to the scheduled Technical Advisory Meeting for this project. Date: June 15, 2004 By: Gary Hoyt, Fire Marshal Carmel Fire Department June 15, 2004 CI EL Mr. James K. Shinneman, PE Weihe Engineers, Inc. 10505 North College Avenue Indianapolis, IN 46280 RE: Carmel Lutheran Church Expansion, Sanctuary & Youth Addition-Project Review #1 Dear Mr. Shinneman: We have reviewed the drawings submitted for this project for the June 16, 2004 Technical Advisory Committee meeting. We offer the following comments: GENERAL INFORMATION 1. The project site is located within current City of Carmel Corporate Limits. The following jurisdictions Will apply. 2. Jurisdictions: Street and Right of Way- City of Carmel (Gray Road, 131 st Street) Water and Sanitary Sewer- City of Carmel Utilities Storm Sewer - City of Carmel 3. Board °fPublic Works and Safety Approval Requirements: Dedication of Right of Way Open Pavement Cuts in Dedicated Streets if applicable. Additional Water and Sanitary Sewer Availability if applicable. Commercial Curb Cut/Curb Cut Modification approval. The request for Board approval should include 8 ½" x 11" exhibits that will indicate existing curb cuts, proposed cUrb cuts and all appropriate supporting data and dimensions including width, radii, etc. Please indicate all existing opposing driveqvays to show their relationship to the proposed curb cuts for this development. I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. Any submission to the Board requires prior final approval by the Carmel Clay Plan Commission and/or the Board of Zoning Appeals and completion of review by the Technical Advisory Committee2 'All written requests to be place on the Board's agenda must inchtde the appropriate Docket Numbers and the date (or dates) of approval by the Plan Commission and/or BZA. 4. Water and Sanitary Sewer Availability (acreage) and Connection Fees Carmel Utilities will determine if this expansion will result in additional Water and Sanitary Sewer Connection Fees. Please provide the number of additional sanctuary seats to be constructed With this expansion. ' 5. TAC Review/Drawings submitted for approval' We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final draxvings will not be approved for construction until all issues have been resolved. The design engineer must certify all drawings submitted for final approval. This office will require a minimum of five-sets of approved drawings DEPARTMENT OF ENGINEERING ONE CIVIC SQI.iARt5, CARMEl., IN 46032 O}:t, lck: 317.571.2441 [~NIAIL kwccse@ci.carmel.in.us F^x 317.571.2439 Mr. James K. Shinneman, P.E. June 15, 2004 Page 2 after all issues have been resolved and the construction drawings have been approved. The drawings will be stamped approved and signed by the City Engineer and by the Director of Carmel Utilities. The Developer/Owner will receive one-set which is to be maintained on the construction site at all times. Carmel Utilities will receive two-sets, our Construction Manager (Inspector) will receive one-set and one-set will be maintained in the Department of Engineering. If more than the minimum five-sets are requested to be approved, the additional sets (maximum total of two additional) must be submitted with the five required sets. 6. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way and/or dedicated easements will require a Consent to Encroach Agreement between the Owner/Developer and the City of Carmel. This Agreement requires Board of Public Works and Safety approval. 7. Carmel Utilities does not subscribe to "Holey Moley" and should be contracted directly for all water and sani.tary sewer main locations. 8. Carmel Utilities will provide a separate review of this project for water and sanitary sewer issues. Pleas assure that Carmel Utilities is on you distribution list for all correspondence, drawings and drawing revisions for this project. 9. I am including copies of the following with this correspondence: · Commercial Project Approval Procedures. · Permit Data, Contacts, etc. · Commercial Permitting Procedures. I will send a copy of our Residential Subdivision and Commercial Irrigation System Requirements upon request. BONDING REQUIREMENTS 10. Upon in. itial review, it appears the following bonding requirements may apply to this project: Performance Guarantees With the mOdification of 2-existing curb cuts and the removal of a third, we request a Performance Guarantee be posted for Right of Way Improvements. This would include demolition work in the dedicated right of way and new curbs, asphalt and sidewalks in the right of way. Please provide a detailed/itemized and Certified Engineer's Estimate for 100% of the labor and materials required for these Right .of Way Improvements. The Performance Guarantee is to be in amount of the Engineer's Estimate. Upon completion of the work and release of the Performance Guarantee, a 3-year 10% Maintenance Guarantee will be required. Street Cut/Right of Way Permit and Bonding Requirements Any work in the dedicated right of way of either Gray Road or 131 st Street, not included or covered by a Performance Guarantee, will require a Right of Way Permit and a License and Permit Bond. The bond amount will be determined by the number of instances of work in the fight of way @ $2,000.00 per instance. Open pavement cuts in dedicated streets require approval bF our Board o£Public Works and Sa[et~. Please contact Fred Glaser, Department of Engineering Right of Way Inspector/Manager for details regarding this issue. PROJECT COMMENTS-CONSTRUCTION PLANS 11. Please be advised that we have engaged Crossroad Engineers for review of drainage issues and drainage calculations. We will share these comments when they are received. 12. Board of Public Works and Safety approval will be required for the modification of the Gray Road curb cUt and for the elimination of one existing curb cut and modification of the remaining curb cut on 131 st Street. Please reference item #3 for submission requirements. 13. The right of ways for Gray Road and 131 st Street are listed as proposed. Have these right of ways been dedicated? If they have, please remove the proposed designation. Mr. James K. Shinneman, P.E. June 15, 2004 Page 3 14. Our 20-Year Thoroughfare Plan designates 131st Street as a Residential Parkway with a fight of way requirement of 100-feet total, 50-feet half. The apparent proposed fight of way satisfies the Thoroughfare Plan requirement. The Plan designates Gray Road as a Secondary Arterial with a right of way requirement of 90-feet total, 45-feet half. The plans indicate a proposed 40-foot half right of way. Please revise to dedicate 45-feet of fight of way. If right of way has not been dedicated, please prepare dedication documents that will dedicate the proposed right of way to the City of Carmel. These documents are available electronically from this office. We are also requesting the dedication of a right of way comer cut at the intersection of Gray and 131st Street. This dedication consists of a triangular area with two 35' sides located on the intersection right of way lines, one on Gray and one on 131 st. 15. None of the sheets seem to indicate an existing sidewalk on 131 st Street, between the two existing curb cuts. However, aerial photos do indicate a sidewalk. Please ensure that there is a continuous sidewalk along. 131 st Street, specifically where the drive is removed. 16. The Site Demolition Sheet does not indicate any sidewalk demolition on 131st Street. 17. Sheet C103 - Grading and Drainage Plan Please designate the detention basin as wet or dry. · Indicate the top of bank, the 100-year and bottom elevations of the detention basin. · Please include directional flow arrows to the plan to indicate surface storm water patterns. · There is a large increase in new impervious area for this development. Does the existing basin have the capacity to accommodate this additional area? There is an existing storm pipe indicated terminating in the detention basin from the new storm inlet #701. Please install an end section and riprap on this outlet. · If the pipe s~es (and material) of the existing storm pipes are known, please indicate on the plans. · Please show the detention basin outlet discharge point on the plans, including invert elevations at the outlet. · Is there an emergency overflow outlet designed for the detention basin? · Please remove the sanitary lateral from this sheet. · The end section detail seems out of place on this sheet. 18. Sheet C105 - Site Utility Plan · The sanitary sewer lift station and service lines are indicated at the northwest comer building addition. Where is the force main and where does it connect to the sanitary sewer main? · Is the water main shown new or existing? 19. Sheet C 107 - Construction Details · Provide a Right of Way Asphalt Paving Section for that portion of the new curb cuts in the right of way of Gray Road and 131 st Street. At a minimum, the fight of way pavement section should be 1½" Surface, 5" 5D Base and 10"//53 Compacted Stone Base. 20. On Sheet C102, note #17 is noted as "not used". Isn't this the proposed privacy fence? 21. Missing a 792 contour on east and south side of pond. 22. Any pavement removed in dedicated right of way to facilitate new construction (curbs, etc.) shall ' be saw cut and replaced with right of way pavement section. 23. Construction entrance is shown as existing pavement to remain. Can existing pavement to be salvaged support construction equipment? Likely that it will be damaged if it is not a heavy section. 24. The sidewalk in the northwest comer adjacent to the building expansion is higher than the FFE of the expansion. 25. Drive aisle for southwest parking spaces is 23.50 feet. Mr. James K. Shinneman, P.E. June 15, 2004 Page 4 We reserve the right to provide additional comments upon further reviews and upon receipt of the drainage review by Crossroad Engineers. The above comments are based upon the Engineering Department's initial review. Please provide our office with a follow up letter regarding this review and revised plans, indicating all revisions. A second review will focus only on detailed construction plans. It is critical that our office be made aware of all modifications made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our initial review. If you have questions, please contact Gary Duncan or me at 571-2441. S%rely, Dick Hill, Assistant Director Department of Engineering Enclosures ccl Jon Dobosiewicz, Department of Community Services (w.o. encl.) John Duffy, Carmel Utilities (w.o. encl.) Paul Pace, Carmel Utilities (w.o. encl.) Jim Haag, Carmel Utilities (w.o. encl.) Greg Hoyes, Hamilton County Surveyor's Office (fax/w.o. encl.) John South, Hamilton County Soil & Water Conservation District (fax/w.o. encl.) Department Review File Copy S :kP ROJ REV03 \C ARM E LLUTHERAN EXP June 9, 2004 Weihe Bn$ineers, Inc ATI~: 3ames Shinneman 10505 North College Avenue Indianapolis, IN 46280 VIA FACSIMILE: 843-0546 Re: Camel Lutheran Church Dear Mr. Shinneman: We have reviewed the construction plans submitted to thc Hamilton County Surveyor's Office on June 1, 2004 for this projec~ and have the following commcnts' 1. This project falls within the jurisdiction of the City of Carmel. 2, The proposcd project DOES fall in a Carmel WelLhead Protection Area 3, Thc proposed project falls in the U.O. Mitchner Regulated Drain Watershed. 4. Hamilton County Ordinance 4-26-99-C(7)b requires all sites in a regulated drain watershed to have staged detention for the 2-I 0-100, 24 hour storm event. Please provide drainage calculations that provide the proposed new site discharge and how the site will detain for the new impervious surface. The maximum allowable 1 O0 year discharge should be between 9 and 10 els, based off thc previous dr~ag~ c~lcul~t~l done with the l~t expansion. 5. To meet the staged detention requirements, this office would suggest a weir type structure on the outflow pipe, rather than an cnd section. 6. Please label the 100 year elevation and minimum top of bank for the dry detention basin in the construction plans. Also, show an emergency spillway (set at the 100 year elevation) and emergency routing with a positive outlet. HAMILTON COUNTY HIGHWA y D£PARTA4£NT June ?, 200~ Mr. James K. Shlnneman Weihe Engineers, inc. 10505 North College Avenue Indianapolis, Indiana 46260 VIA FACSIMILE RE: Carmel Lutheran Church Site Plan - Sanctuary and Youth Addition Clay Township Dear Mr. Shinneman: This letter serves to acknowledge receipt of a transmittal received 611104 containing the plans for the above-mentioned project. After reviewing the plans the Highway Department has the following comments: la It appears that this project lies entirely within the limits of the City of Carmel. Therefore, all future comments should be directed toward the City. If you have any information contrary to this statement, please contact me Immediately. If you have any questions or comments concerning this letter, please feel free to contact me at anytime. $1nce~rely, Steven J. Broermann Staff Engineer Jon Doboslewicz Greg Hoyes G:~U $ ER$~,$1a~04ta~06-07-04~an"nellutheran.d~ 1700 South 10~ Street Noblesville, .in. 46060 .www..eo.hamilton.in.us Office 017) 773-7770 Fax 017) 776-9814 June 3, 2004 Mr. James K. Shinneman, PE Weihe Engineers, INC. 10505 N. college Avenue Indianapolis, IN 46280 RE: Carmel Lutheran Church- Sanctuary & Youth Addition Dear Mr. Shinneman: I have received and reviewed the plans for the above-mentioned projects. At the present time, ! see nothing in the plans that. would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, Michael D. Fogarzy Chief of Police MDF:vb CC: Dept. of Community Services (317) 571-2500 A Nationally Accredit~:;!i~!ii~hforcement Agency F~ (517} $71-2512 Babbitt, Pamela A From: Sent: To: Cc: Subject: Butler, Angelina V Thursday, June 03, 2004 2:21 PM Tingley, Connie S Morrissey, Phyllis G; Pattyn, Dawn E; Babbitt, Pamela A; Hollibaugh, Mike P; Keeling, Adrienne M; Kendall, Jeff A; Brewer, Scott I; Hancock, Ramona B; Dobosiewicz, Jon C; Pohlman, Jesse M; Brennan, Kevin S Docket No. Assignment: (SUA, V) Carmel Lutheran Church (#04060002 SUA and #04060003 V) Connie, Please print and fax this e-mail to the petitioner identified below and update the file. I have issued the necessary Docket Number for (SUA, V) Carmel Lutheran Church. It will be the following: Docket No. 040060002 SUA Docket No. 040060003 V Total Fee' $750 + $100 * 1 acre = $850.00 $950 $1,800.00 Carmel Lutheran Missouri Synod Church - Expansion The applicant seeks special use amendment and development standards variance approval for a church expansion, located at 4850 East 131 st Street. Docket No. 04060002 SUA 5.02.A special use Docket No.- 04060003 V 5.04.03.F lot coverage The site is zoned S-I/Residence - Low Density. Filed by Larry Kemper of Nelson & Frankenberger. Petitioner, please note the following: 1. This Item will be on the June 16 agenda of the Technical Advisory Committee. 2. Mailed and Published Public Notice needs to occur no later than Thursday, July 1, 2004. Published notice is required within the Indianapolis Star. 3. The Proof of Notice will need to be received by this Department no later than noon, Friday, July 23. Failure to submit Proof of Notice by this time will result in the tabling of the petition. 4. The Filing Fee and Nine (9) Informational Packets must be delivered to BZA Secretary Connie Tingley no later than Noon, Friday, July 16. Failure to submit Informational Packets by this time will result in the automatic tabling of the petition to the Monday, August 23, 2004, agenda of the BZA. 5. This Item will appear on the July 26, 2004 agenda of the Board of Zoning Appeals under Public Hearings. 6. The petitioner will need to provide a fully filled-out Findings-of-Fact sheets for each petition the night of the meeting for the Board's use (Sheet 8). On Ballot sheets, only fill out docket number, petitioner, and date (Sheet 7). Ballot sheets must be collated. 7.) PETITIONER: refer to your instruction sheet for more details. Please contact Mr. Kemper at 844-0106 (Fax: 846-8782) with this information. Once the file is updated please return it to my office. Thank you, Angie ~/~/0 CIVIL ENGINEERS, LAND SURVEYORS, LAND PLANNERS, LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Department of Community Services Carmel Lutheran Church - Sanctuary & Youth Addition One Civic Square Job #: W030545 Carmel, Indiana 46032 Date-' June 1, 2004 Phone: 571-2417 Attn: Jon Dobosiewicz Fax: 571-2426 We are sending you ~ Attached I"l Under separate cover via delivery the following items' V-1 Shop Drawings E3 Prints [3 Copy of Letter l'-I Product Data V'] Specifications [3 Meeting Minutes V-I Samples E] Change Order(s) [3 Inspection Report F1 F1 Sketches/Drawings [3 Application(s) for Payment F1 Sets ~ Copies Document Date Document Number Description Transmittal letters to TAC members These are transmitted as indicated below: E] Approved Vq Approved as Noted V-1 Not Approved, Revise and Resubmit E] Action Not Required E] Action Indicated on Item Transmitted E] For Signature. Return__ Copies to Us [8] For Your Review or Use [3 For Your Review & Comment V1 As Requested V1 For Your Records F1 For Your Approval Remarks-' Jon, following are copies of the transmittal letters to the TAC members. Please place us on the June 16 TAC agenda. You should already be in possession of construction plans and drainage calculations for your project review. James K. Shinneman, PE ALLAN h. WEIHE... P.E,, LS, - PRESJDENT 0505 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA 46280 (317) 846-661 t (8001) 452-6408 FAX: (317)843<)546 NC. CIVIL ENGINEERS, LAND SurvEYors, LAND PLANNERS, LANDSCAPE ArCHiTECtS LETTER OF TRANSMITTAL To-' Carmel/Clay Communications Project: Carmel Lutheran Church- Sanctuary & Youth Addition 31 First Avenue Northwest Job #: W030545 Carmel, Indiana 46032 Date: June 1,2004 Phone: 571-2580 Attn: Bill Akers Fax: 571-2585 We are sending you ~1 Attached F1 Under separate cover via delivery the following items: F1 Shop Drawings [-] Prints F1 Copy of Letter F'I Product Data Fl Specifications Fl Meeting Minutes [3 Samples V1 Change Order(s) V1 Inspection Report '[2 V1 Sketches/Drawings [3 Application(S) for Payment F1 Sets. [8] Copies Document Date Document Number Description 1 Set of Construction Plans These are transmitted as indicated below.: F1 Approved F1 Approved as Noted Fl Not Approved, Revise and Resubmit F1 Action Not Required E] Action Indicated on Item Transmitted E] For Signature. Return ~ Copies to Us [8] For Your Review or Use [3 For Your Review & Comment [3 As Requested [3 For Your Records V1 For Your Approval Remarks: For Carmel/Clay TAC~Members for project review cc: James K. Shinneman, PE ALLAN h,. WEIHE:. P,E., L,$., ~ PRESIDENT 0505 NORTH COLLEGE AVENUE iNDIANAPOLIS, INDIANA 46280 (3 t 7) '846-661 t (800) 452-6408 FAX: (317)843-0546 Ci"Vll ENGINEERS, LAND SUrVEYOrS, LAND PLANNERS, LANdSCAPe ArCHIT C LETTER OF TRANSMITTAL To: Assistant Building Commissioner Project: Carmel Lutheran Church - Sanctuary & Youth Addition One Civic Square Job #: W030545 Carmel, Indiana 46032 Date: June 1, 2004 Phone: 571-2444 Attn: Jim Blanchard Fax: 571-2499 We are sending you ~1 Attached F1 Under separate.cover via delivery the following items: F1 Shop Drawings F1 Prints [-1 Copy of Letter F1 Product Data F1 Specifications El Meeting Minutes I-3 Samples F1 Change Order(s) F1 Inspection Report F1 F-! Sketches/Drawings F1 Application(s) for Payment F1 Sets [8] CoPies Document Date Document Number Description Set of ConstructiOn Plans These are transmitted as indicated below: E] Approved E] Approved as Noted E] Not Approved, Revise and Resubmit El Action. Not Required F1 Action Indicated on Item Transmitted E] For Signature. Return Copies to Us [8] For Your Review or Use [2] For Your Review & Comment F1 As Requested F1 For Your Records El For Your Approval Remarks: For Carmel/Clay TAC Members for project review cc: James K. Shinneman, PE ALLAN h, WEtHE, P,E .... L,S,.,. pRESiDENT 10505 NORTH COLLEGE; AVENUE iNDIANAPOLIS, INDIANA' 46280 (31'7) 846'661 't (800) 452:6408 FAX:: (317)843,0-546 VEYORS LANd Planners LANDSCAPE A~~~ LETTER OF TRANSMITTAL To: Cinergy PSi Project: Carmel Lutheran Church - Sanctuary & Youth Addition 1441 S. Guilford Road Job #: W030545 Carmel, Indiana 46032 Date: June 1, 2004 Phone: 571-2417 Attn: Ron Booher Fax: 581-3031 We are sending you [-ffi Attached F1 Under separate cover via delivery the folloWing items' I-3 Shop Drawings F1 Prints F1 Copy of Letter [2] Product Data F1 Specifications [2] Meeting Minutes [3 Samples F1 Change Order(s) F1 Inspection Report F1 F1 Sketches/Drawings [3 Application(s) for Paymem .. F1 Sets Document Document Description '[8] Copies Date Number · 1, Set of Construction Plans ,, · · ,, ....... These are transmitted as indicated below: [3 Approved E] Approved as Noted F1 Not Approved, Revise and Resubmit F-I Action Not Required F1 Action Indicated on Item Transmitted [-I For Signature. RetUrn ~ Copies to Us [8] For Your Review or Use F1 For Your Review & Comment F1 As Requested F1 For Your Records [2] For Your Approval Remarks: For Carmel/Clay TAC Members for project review By J~ ~ James K.-Shinnem cc: ALLAN H, .WEIHE, P,E .... 1,S,.-pRESiDENT i0505 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA 46280 (317;) ~6:66i I (800;) CIVIl ENGINeErS, LAND SUrVEYOrS, LANd PLANNERS, LANDSCAPE ArChITECtS LETTER OF TRANSMITTAL To: Department of Community Services Project: Carmel Lutheran Church - Sanctuary & Youth Addition One Civic Square Job #: W030545 Carmel, Indiana 46032 Date: June 1, 2004 Phone: 581-3028 Attn: Scott Brewer Fax: 571-2426 We are sending you ~'1 Attached F1 Under separate cover via delivery the following items: F1 Shop Drawings F1 Prints F1 Copy of Letter F-I Product Data [3 Specifications F1 Meeting Minutes F'] Samples F1 Change Order(s) F1 Inspection Report -3 [2] Sketches/Drawings F1 Application(s) for Payment [2] Sets FX-1 Copies Document Date Document Number Description Set of Construction Plans These are transmitted as indicated below: F1 Approved F-1 Approved as Noted F1 Not Approved, Revise and Resubmit F1 Action Not Required [-1 Action Indicated on Item Transmitted E] For Signature. Retum~ Copies to Us ~! For YoUr Review or Use [2] For Your Review & Comment Fl As Requested [2] For Your Records F1 For Your Approval Remarks: For Carmel/Clay TAC Members for project review CC: James K. Shinneman, PE ALLAN H, WEIHE.~ P,E., L,S. * PRESIDENT 10505 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA ~46280 (3~ 7) ~846'661 t (800) 452-6408 FAx: (317).843-054.6 ENGINEERS, LAND .Surveyors, LAND PlaNNers. LANDSCAPE ArChITeCts LETTER OF TRANSMITTAL To: Hamilton County Engineering Project~ Carmel Lutheran Church- Sanctuary & Youth Addition Hamilton County Highway Job #: W030545 · 1700 S. 10th Street Date: June 1, 2004 Noblesville, Indiana 46060 Phone: 773-7770 Attn: Steve Broermann Fax: 776-9814 We are sending you [gl Attached E! Under separate cover via delivery the following items: Shop Drawings E] Prints E] Copy of Letter Product Data V'] Specifications ~ Fl Meeting Minutes Samples E] Change Order(s) ~l Inspection Report V1 Sketches/Drawings V1 Application(s) for Payment V1 Sets [~] Copies Document Date Document Number Description Set of ConstruCtion Plans These are transmitted as indicated below: l--l Approved [3 Approved as Noted E] Not Approved, Revise and Resubmit V-I Action Not Required E] Action Indicated on Item Transmitted E] For Signature. Return__ Copies to Us IX] For Your Review or Use V1 For Your ReView & Commem E] As Requested F1 For Your Records [3 ,For Your ApproVal ,, ,, Remarks: For Carmel/Clay TAC Members for project review James K. Shinneman, PE CC: ALLAN h. WEtHE; P,E., iL.S: ~ PRESIDENT 10505 NORTH COLLEGE AVENUE INDIANAPOLIS, ~NDtANA 46280 (3t. 7):846-66't t (800) 452-64.08 FaX: (3t 7)843~)546 LETTER OF TRANSMITTAL To; Carmel City Utilities Project= Carmel Lutheran Church- Sanctuary'& Youth Addition 130 First Avenue Southwest Job #= W030545 Carmel, Indiana 46032 Date: June 1, 2004 Phone: 571-2648 Attn: John Duf~ Fax: 571-2653 We are sending you [~l Attached El Under separate cover via deliverY the follOwing items: El Shop Drawings [3 Prints E3 Copy of Letter I'3 Product Data F'l Specifications I-3 Meeting Minutes E3 Samples l--] Change Order(s) El Inspection Report V1 [3 Sketches/DraWings F1 Application(S) for Payment Sets Document Document Description Copies Date Number · , ,, 1 Set of Construction Plans · , ,, ., , · , These are transmitted as indicated below: [3 Approved El Approved.as Noted [-1 Not Approved, ReviSe and Resubmit El Action Not Required !-3 Action Indicated on Item Transmitted F-1 For Signature. Return ~ Copies to Us [8] For Your Review or Use El For Your Review & Comment F1 As Requested El For Your RecordS V1 For Your Approval Remarks: For Carmel/Clay TAC Members for project review CC: James K. Shinneman, PE AL:LAN h? WEtHE,.P,E .... L.$,-.pRE$1DENT t 0505 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA 46280 (31.7) 846'66i i (800) 452~6408 FAX: (317)~3'0546 NC CI'VII ENGINEERS., LAND SURVEYORS, LAND PLANNERS, LANDSCAPE ArChITECtS LETTER OF TRANSMITTAL To: Brighthouse Networks Project: Carmel Lutheran Church - Sanctuary & Youth Addition 516 East Carmel Drive Job #: W030545 Carmel, Indiana 46032 Date: June 1, 2004 Phone: 844-8877 Attn: Jeff Farmer Fax: 843-2047 We are sending you FX-i Attached Fq Under separate cover via delivery the following items: F1 Shop Drawings V1 Prints [3 Copy of Letter [3 Product Data iq Specifications [3 Meeting MinUtes El Samples [3 Change Order(s) V1 Inspection Report F1 [3 Sketches/Drawings V1 Application(s) for Payment Sets Copies Document Date Document Number Description Set of Construction Plans These are transmitted as indicated below: El Approved [3 Approved as Noted V1 Not Approved, Revise and Resubmit F1 Action Not Required [3 Action Indicated on Item Transmitted F1 For Signature. Return__ Copies to Us [8] For Your Review or Use F1 For Your Review & Comment [3 As Requested El For Your Records V1 For Your Approval Remarks: For Carmel/ClaY TAC Members for project review James K. Shinneman, PE cc: ALLAN H.......WE:tHE.,,_._ ..P,...~t..,..: :L,S, - PRESIDENT 0505 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA 46280 (317) 846'66i 1 (800) 452'6408 FAX.: (317)843-0546 CIVIL ENGINEERS., LAND .SURVEYORS, LAND PLANNERS, LANDSCAPE ARCHiTECtS LETTER OF TRANSMITTAL To,' Carmel/Clay Schools proj~ Carmel Lutheran Church - Sanctuary & Youth Addition 5201 E. 131 st Street Job #: W030545 Carmel, Indiana 46033 Date: June 1,2004 Phone: 844-9961 At'tn: Ron farrand Fax: 844-9965 We are sending you ~ Attached El Under separate cover via delivery the following items: .E] Shop Drawings [3 Prints E] Copy of Letter [3 Product Data El Specifications [3 Meeting.Minutes [-1 Samples El Change Order(s) F-] Inspection Report F1 ~ Sketches/Drawings Fl Application(s) for Payment Sets DoCUment Document DesCription Copies Date Number ,, 1 Set of Construction Plans · , , .. ......... These are transmitted as indicated below: F1 Approved [,! Approved as Noted E] Not Approved, Revise and Resubmit E] Action Not Required E] Action Indicated on Item Transmitted [3 For Signature. Return ~ Copies to Us [8] For Your Review or Use Fl For Your Review & Comment F1 As Requested F1 For Your Records F1 For Your Approval Remarks: For Carmel/Clay TAC Members for project review. James K. Shinneman, PE ALLAN H, 'WEIHE, p.e., L.$. - PRESIDENT 10505 'NO[~:;~TH COLLEGE AVENUE iNDIANAPOLIS, INDIANA '46280 (3t7)Et46'661 t (8°0) 452'64°8. FAX; ~317)~3~0546 CIVIL ENGINEERS, LAND SURVEYORS, LAND PLANNERS, LANDSCAPE ArCHiTECTS LETTER OF TRANSMITTAL To: Office of Police Chief Projeca Carmel Lutheran Church- Sanctuary & Youth Addition Three Civic Square Job #: W030545 Carmel, Indiana 46032 Date: June 1, 2004 Phone: 571-2500 Attn: Michael fogarty Fax: 571-2512 We are sending you I~l Attached F1 Under separate cover via delivery the following items: I-q Shop Drawings F'I Prints F1 Copy of Letter F1 Product Data F1 Specifications E] Meeting Minutes F1 Samples F1 Change Order(s) F1 Inspection Report F1 E1 Sketches/Drawings F1 Application(s) for Payment F1 Sets ~ Copies Document Date Document Number Description Set of Construction Plans These are transmitted as indicated below: F1 Approved F'l ApProved as Noted Fl Not Approved, Revise and Resubmit F1 Action Not Required Fq Action Indicated on Item Transmitted F'I For Signature. Retum~ Copies to Us [8] For Your ReView or Use F1 For Your Review & Comment El As ReqUested F1 For Your Records E] For Your Approval,,, Remarks: For Carmel/Clay TAC Members for project review James K. Shinneman, PE cc: ALLAN H. WEIHE, 'P.E., i,S. - pRESiDE~'NT ~'0505 .NOETH :COLLEGE AVENUE iNDIANAPOLiS, INDIANA'46280 (3t7) 846'661 I (8°0.) 45'~]6~.0~''' FAX: (~1 7)843~)546' CiVil ENgiNEErS, LAND SURVEYORS, land PLANNERS, LANdSCAPe arohttEC S LETTER OF TRANSMITTAL To: Cinergy Projec~ Carmel Lutheran Church - Sanctuary & Youth Addition 1441 S. Guilford Road Job #: W030545 Carmel, Indiana 46032 Date: June 1, 2004 Phone: 581-3041. Attn: Dean Groves Fax: 581-3031 We are sending you r~ Attached r-! Under separate cover via deliVery the following items: I'3 Shop Drawings [3 Prints [3 Copy of Letter [3 Product Data [3 Specifications [3 Meeting Minutes V1 SamPles [3 Change~Order(s) [3 Inspection Report Fl [3 Sketches/Drawings [3 Application(s) for Pa ?-ment . [3 Sets FX-1 Copies Document Date Document Number Description Set of Construction Plans theSe are transmitted as indicated below: F1 Approved F1 Approved as Noted [3 Not Approved, Revise and Resubmit F1 Action Not Required [-1 Action Indicated on Item Transmitted F1 For Signature. Return Copies to Us [8] For Your Review or Use V1 For Your Review & Comment V1 As Requested F1 For YOur Records [-3 For Your Approval Remarks: For Carmel/Clay TAC Members for project review James K. Shinneman, PE ALLAN h,. WE!H E, P, E.._,:. ~ .L_:S, ' PREei DENT 10505 NORTH COLLEGE AVENUE INDIANAPOLIS., INDIANA :46280 (317) IB46'661 I (800) 452'6408 FAX.: (31' 7)~3-0546 CiVil ENGINeers, LAND Surveyors, LANd PlaNNers, LaNdSCaPe ArChitects LETTER OF TRANSMITTAL To: Hamilton County Local Emergency project: Carmel Lutheran Church - Sanctuary & Youth Addition Planning Committee Job #: W030545 ' 1717 Pleasant Street, Suite 1 O0 Date: June 1, 2004 Noblesville, Indiana 46060 Phone: 770-3381 Attn: RObert hendricks Fax: We are sending you V~] Attached l-'l Under separate cover via delivery the following items: F-l Shop DraWings Fl Prints [3 Copy of Letter El Product Data , E] Specifications [3 Meeting Minutes [3 Samples E] Change Order(s) E3 Inspection Report ~ .... D Sketches/Drawings F1 Application(s) for Payment Sets Copies Document Date Document Number Description Set of Construction Plans These are transmitted as indicated below: ~ Approved [3 Approved as Noted [3 Not ApProved, Revise and Resubmit i'-] Action Not Required ['3 Action Indicated on Item Transmitted [3 For Signature. Return ~ Copies to Us [~] For Your Review or Use V1 For Your Review & Comment V1 As Requested V1 For Your Records V1 For Your Approval Remarks: FOr Carmel/Clay TAC Members for project }'eview James K. Shinneman, PE cc: ALlaN H, WEJHE~ 'P.E. iL/S, ~ PRESIDENT 0505 NORTH COLLEGE AVENUE iNDIANAPOLIS, ~NDIANA 46280 (317)846:6611 (800) 452-6408 FAX: (3:17.)843-0546 LETTER OF TRANSMITTAL To: City of Carmel Project: Carmel Lutheran Church- Sanctuary & Youth Addition One Civic Square Job #: W030545 Department of Engineering Date: June 1, 2004 Carmel, Indiana 46032 Phone: 571-2441 Attn: Dick Hill Fax: 571-2439 We are sending you ~-1 Attached E! Under separate cover via delivery the following items: E] Shop Drawings F1 Prints [3 Copy of Letter [3 Product Data F'l Specifications E] Meeting Minutes E3 Samples [-3 Change Order(s) [-3 Inspection Report -1 V1 Sketches/Drawings V1 Application(s) for Payment Sets Copies Document Date Document Number Description Set of Construction Plans These are transmitted as indicated below:' V1 Approved V1 Approved as Noted V1 Not Approved, Revise and Resubmit [2] Action Not Required V1 Action Indicated on Item Transmitted V1 For Signature. Return ~ Copies to Us [8] For Your Review or Use [D For Your Review & Comment V1 As Requested V1 For Your Records El For Your Approval. Remarks: You should have already received drainage calcs for this project. If not, I believe 2 copies were dropped off at DOCS. This is for Carmel/Clay TAC Members for project review CC: James K. Shinneman, PE ALLAN h? WEtHE, P.E,, l,$, - PRESIDENT 0505 'NORTH COLLEGE AVENUE iNDIANAPOLiS, INDIANA 46280 (3 t 7) 84.6'661 t (8OO) 452-64.08 FAX: (317)843-0546 LETTER OF TRANSMITTAL To: Jones & Henry Pmjecl= Carmel Lutheran Church - Sanctuary & Youth Addition 2420 N. ColiSeum Boulevard Job #: W030545 Suite 214 Date: June 1, 2004 Ft. Wayne, Indiana 46805 Phone: 571-2648 Attn: Brian Houghton Fax: 571-2653 We are sending you I~! Attached I-'i Under separate cover via delivery the following items: I-'! Shop Drawings FI Prints I--! Copy of Letter El Product Data [3 Specifications [3 Meeting Minutes [3 Samples . V1 Change Order(s) V1 Inspection Report D FI Sketches/Drawings [3 Application(s) for Payment El Sets Document Document DescriptiOn [El Copies Date Number , .... 1 Set of Construction Plans , ,, ,,, ...... ,, , These are transmitted as indicated below: F1 Approved F1 Approved as Noted F1 Not Approved, Revise and Resubmit F! Action Not Required V1 Action-Indicated on Item Transmitted E] For Signature. Remm~ Copies to Us [8] For Your Review or Use F1 For Your Review & Comment V1 As Requested [3 For Your Records V1 For Your Approval Remarks: For Carmel/Clay TAC Members for project review cc: James K. Shinneman, PE ALLAN H. 'WEIHE, P.E., L.'S, - PRESIDENT 0505 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA 46280 (3 I7) EN6'66 t I (800) 452'6408 FAX: (317)843~)546 LETTER OF TRANSMITTAL To: Hamilton County Surveyors Office Project= Carmel Lutheran Church - Sanctuary & Youth Addition One Hamilton Square Job #: W030545 Suite 188 Date: June 1, 2004 Noblesville, Indiana 46060 Phone: 776-8495 Attn: Greg Hoyes Fax: 776-9628 We are sending you ~ Attached El Under separate cover via delivery the following items: lq Shop Drawings F1 Prints E] Copy of Letter U] Product Data El Specifications [-I Meeting Minutes E] Samples F'I Change Order(s) U] Inspection Report [-1 F1 Sketches/Drawings [3 Application(s) for Payment Sets Copies Document Date DoCUment Number Description Set of Construction Plans These are transmitted as indicated below: [-] APproved [3 Approved as Noted E] Not Approved, Revise and Resubmit El Action Not Required E] Action Indicated on Item Transmitted E] For Signature. Return ~ Copies to Us [8] For Your Review or Use F1 For Your.Review & Comment [3 As Requested F1 For Your Records F1 For YOur Approval ,,, BI ' Remarks: For Carmel/Clay TAC Members for project review CC: James K. Shinneman, PE ALLAN H. WEIHE,.P.E.. L;S, '- PRESIDENT 0505 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA 46280 (3 t 7) '846-66 i t (800) 452'64.08 FAX: (3.17)843~O546 LETTER OF TRANSMITT To: Office of Fire Chief, Fire Station #1 Project: Carmel Lutheran Church- Sanctuary & Youth Addition Two Civic Square Job #: W030545 Carmel, Indiana 46032 Date: June 1,2004 Phone: 571-2600 Attn: Gary Hoyt Fax: 571-2615 We are sending you [k'] Attached F1 Under separate cover via delivery the follOwing items: V1 Shop Drawings [3 Prints El Copy of Letter 'El Product Data V1 Specifications E] Meeting Minutes V1 Samples V1 Change Order(s) V1 Inspection Report -1 ,, El Sketches/Drawings E] Application(s) for Payment Sets Copies Document Date Document Description NUmber Set of Construction Plans These are transmitted as indicated below: [3 Approved [2] Approved as Noted E] Not APproved, Revise and Resubmit [2 Action Not Required ID Action Indicated on Item Transmitted V1 For Signature. Return ~ Copies to Us [8] For Your ReView or Use V1 For Your Review & Comment El As Requested V1 For Your Records V1 For Your Approval [-'] _. Remarks: For Carmel/Clay TAC Members for project review ' James K. Shinneman, PE CC: ALl'AN H. WE:IHE,.'P.:E., :L.S.- PRESIDENT COLLEGE AVENUE iNDIANAPOLIS, INDIANA 46280 (317)/~46~66i I (800) 452'6408 FAX: (3t 7)843-0546 N · Rs, .,I .N C, CIVIl ENGINEERS, LAND .SU'RVEYORS, LAND P'LANNERS, LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Clay Township Regional Waste District Project: Carmel Lutheran Church - Sanctuary & Youth Addition 10701 N. College Avenue Suite A Job #: W030545 Indianapolis, IN 46280 Date: June 1, 2004 Phone: 844-9200 Attn: Andy Kern Fax: 844-9203 We are sending you ~1 Attached l"! Under separate cover via delivery the folloWing items: [2] Shop Drawings [2 Prints [2 Copy of Letter [2] Product Data V1 Specifications V1 Meeting Minutes [2] Samples [--I Change Order(s) [3 Inspection Report V1 · V1 Sketches/Drawings V1 Application(s) for Pa ~mem Sets Document Document Description Copies Date Number 1 Set of Construction plans These are transmitted as indicated below: 123 Approved [2] Approved as Noted F] Not Approved, Revise and Resubmit [2] Action Not Required [2] Action Indicated on Item Transmitted V1 For Signature. Retum~ Copies to Us [8] For Your ReView or Use V1 For Your Review & Comment [2 As Requested V1 For Your Records ' V1 For Your Approval Remarks: For Carmel/Clay TAC Members for project review James K. Shinneman, PE CC: ALLAN h, 'WEIHE, P.E.,.L.S. * PRESIDENT 0505 ;NOt~.TH :COLLEGE AVENUE INDIANAPOLIS, ~NDtANa 46280 (:3 ! ;7:)846~66 i i (800) 452-6408 FAX: (317)843-0546 *WEiH NGi lN RS CIVIL ENGINEERS., LAND'SURVEYORS, LAND PLANNERS, LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Hamilton County Health Department Project= Carmel Lutheran Church - Sanctuary & Youth Addition One Hamilton Square Job #: W030545 Suite 30 ,, Date: June 1, 2004 Noblesville, Indiana 46060 Phone: 776-8500 Attn: Jason Lemaster Fax: 776-8506 We are sending you [gl Attached l-I Under separate cover via delivery the following items. Shop Drawings [3 Prints E] Copy of Letter Product Data E] Specifications [3 Meeting Minutes Samples E] Change Order(s) E] Inspection Report El Sketches/Drawings El Application(s) for Payment F1 Sets Document Document Description [8] Copies Date Number ...... 1 Set of Construction Plans .... · ,. ......... These are transmitted as indicated belOw: I-! Approved 1'3 Approved as Noted E] Not Approved, Revise and Resubmit E] Action Not Required E] Action Indicated on Item Transmitted E] For Signature. Return ~ Copies to Us [8] For Your Review or Use [2 For Your Review & Comment El As Requested F1 For Your Records [2 For Your Approval Remarks: For carmel/Clay TAC Members for project review James K. Shinneman, PE CC: ALLAN H, WE!HE, P.e .... L.S, '-.PRe$iD£NT 10505 NORTH COLLEGE AVENUE INDIANAPOLIS., INDIANA 46280 (317) 846'661 i (800) 452:6408 FAx.: (317)843-0546 CI'VII ENGINEERS., LAND:=SUr'veYOR$, LAND PLANNERS, LANDSCAPe ARCHITECTS LETTER OF TRANSMITTAL To: Panhandle Eastern Pipeline Company Project: Carmel Lutheran Church- Sanctuary & Youth Addition P.O. Box 38 Job #: W030545 Zionsville, Indiana 46077 Date: June 1, 2004 Phone: 733-3213 Attn: Teresa Magee/Mark Wood Fax: 733-3204 , We are sending you [k'l Attached F1 Under separate cover via delivery the following items' F1 Shop Drawings F-1 Prints F1 Copy of Letter I'-I Product Data l-'l Specifications IZ1 Meeting Minutes IZ1 Samples E] Change Order(s) El Inspection Report -'l !-'1 SketcheS/Drawings El Application(s) for Pa ~ment F'! Sets Document Document Description [8] Copies Date Number 1 Set of Construction Plans · These are transmitted as indicated below: !-] Approved I"] Approved as Noted F1 Not Approved, Revise and Resubmit F1 Action Not Required [--! Action Indicated on Item Transmitted F1 For Signature. Return Copies to Us ['~ For Your Review or Use 1--1 For Your Review & Comment E] As Requested F1 For Your Records [-] For Your Approval, Remarks: For Carmel/Clay TAC Members for project review cc: James K. Shinneman, PE ALLAN h: WE!HE,.P,E ..... L,S, .-.PRESIDENT 050.5'NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA. 46280 (31.7) 846-66i i (800) 452-6408 FAx.: (317)843-0546 CI'VIL ENGINEERS., LAND SURVEYORS, LAND PLANNERS, LANDSCAPE LETTER OF TRANSMITTAL To: Indianapolis Power & Light Company Project: Carmel Lutheran Church - Sanctuary & Youth Addition 3600 N. Arlington Avenue Job #: W030545 Indianapolis, Indiana 46218 Date: June 1, 2004 Phone: 261-5261 Attn: Ron Morris Fax: 261-5201 We are sending you IX! Attached I"l Under separate cover via delivery'the following items: Shop Drawings 1-3 Prints E] Copy of Letter Product Data F3 Specifications E] Meeting Minutes Samples UI Change Order(s) E] Inspection Report E1Ske h /D i FIA li ti ()fo P ~ . . tc.. es rawn s ~ . ca ons r a ment F1 Sets Document Document Description [8] Copies 1 Date Number These are transmitted as indicated below: 1'3 ApproVed ~ Approved as Noted ~ Not Approved, Revise and Resubmit E] Action Not Required F-] Action Indicated on Item Transmitted E] For Signature. Return Copies to Us Set of Construction Plans [8] For Your Review or Use F1 For Your Review & Comment F1 As Requested El For Your Records F! For Your Approval Remarks: For Carmel/Clay TAc Members for project review __ James K. Shinneman, PE cc: 10505 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA46A~-~ ~:~-)"~6]'~ '1 (800) 452-6408 FAX: (317)8~43,05z~6 N ,. NC · CI'VIL ENGINEERS, LAND: SURVEYORS, LAND PLANNERS, LANDSCAPE ARChITECtS LETTER OF TRANSMITTAL To: Carmel Post Office Project: Carmel Lutheran Church- Sanctuary & Youth Addition 275 Medical Drive Job Ct: W030545 Carmel, Indiana 46032 Date: June 1, 2004 Phone: 846-2489 Attn: Postmaster c/o Karen Pitts Fax: 846-3135 Fq Product Data F'! Samples We are sending you [Xl Attached i-'i Under separate cover Via delivery the following items: F'I Shop Drawings F1 Prints F-1 Copy of Letter Fl Specifications F-! Meeting Minutes F-! Change Order(s) ~ Inspection Report E! Sets Document Document DesCription ~ Copies Date Number 1 Set of Construction Plans These are transmitted as indicated below: El Approved [--1 Approved as Noted U] Not Approved, Revise and Resubmit E] Action Not. Required ~ Action Indicated on Item Transmitted Fl For Signature~ Return Copies to Us ~1 For Your Review or Use l-q For Your Review & Comment ~ As Requested f'q For Your Records i-! For Your Approval .._ By: ~ James K. Shinneman, PE CC: "- ALLAN h..WEtHE, P.E.. :L,S. - PRESIDENT' 0505 NORTH COLLEGE; AVENUE INDiANAPOLiS., iNDiANA 46280 ('31~.) 84~6 i '! (800) 452~6408 FAX: (317)E143-~ CIVIL ENGINEERS, LAND'SURVEYORS, LAND PLANNERS, LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Carmel Post Office Project: Carmel Lutheran Church - Sanctuary & Youth Addition 275 Medical Drive Job #: W030545 Carmel, Indiana 46032 Date: June 1, 2004 Phone: 846-2489 Attn: Postmaster c/o Karen Pitts Fax: 846-3135 we are sending you ~ Attached El Under separate cover Via delivery the following items: E] Shop Drawings Fq Prints F-1 CoPy of Letter UI Product Data [3 Specifications E3 Meeting Minutes [3 Samples [3 Change Order(s) UI Inspection RePort Fl F1 SketChes/Drawings FI Application(s) for Payment [3 Sets B3 Copies Document Date Document Number Description Set of Construction Plans These are transmitted as indicated below: El APproved E] Approved as Noted F-I Not Approved, Revise and Resubmit F'l Action Not Required E] Action Indicated on Item Transmitted E] For Signature: Return ~ Copies to Us ~ For YoUr Review or Use FI For Your Review & Comment El As Requested El For Your Records ' F1 For Your Approval El Remarks: For Carmel/Clay TAC Members for project review cc: James K. Shinneman, PE ALLAN H, WEtthE, P,E., L,$. * PRESIDENT' 0505 NORTH COLLEGE; AVENUE INDIANAPOLIS, INDIANA 46280 (317) ~6'66i '! (800) 452'6408 FAX.: (317)843-0546 LETTER OF TRANSMITTAL To: Vectren Energy Projecb Carmel Lutheran Church- Sanctuary & Youth Addition PO Box 1700 Job #: W030545 Noblesville, Indiana 46060 Date: June 1,2004 Phone: 776-5535 Attn: Chuck Shupperd Fax: 776-5553 We are sending you IL] Attached [2] Under separate cover via delivery the following items: [-I Shop Drawings [2] Prints [2] Copy of Letter [2] Product Data E3 Specifications [2] Meeting Minutes [2] Samples [2] Change Order(s) [2] Inspection Report [3 E] Sketches/Drawings F-I Application(s) for Payment Sets · Document Document Description Copies Date Number . . , 1 Set of Construction Plans : , These are transmitted as indicated below: [3 ApproVed [2] Approved as Noted [21 Not Approved, Revise and Resubmit [3 Action Not Required [2] Action Indicated on Item Transmitted [3 For Signature. Return Copies to Us [8] For Your Review or Use F1 For Your Review & Comment El As Requested F1 For Your Records [2 For Your Approval Remarks: For Carmel/Clay TAC Members for project review jam r~an, PE CC: ALLAN .H, .WE:IH e,. P.E ;L,$, .~. PR. ESIDENT 0505 NORTH COLLEGE AVENUE iNDIANAPOLiS, INDIANA 46280 (317;) ~6-66 ~ '1 (800.) 452'6408 FAX: (317)843-054~ RS, JN,C. CIVIL' ENGINEERS., LAND.SURVEYORS, LAND PLANNERS, LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Hamilton County Soil & Water Conservation Project: Carmel Lutheran Church- Sanctuary & Youth Addition 1108 S. 9th Street Job #: W030545 Noblesville, Indiana 46060 Date-' June 1, 2004 Phone: 773-1406 Attn: John South Fax: 776-1101 We are sending you I~! Attached [3 Under separate cover via delivery the following items' r-] Shop Drawings E] Prints [3 Copy of Letter F'] Product Data El Specifications E] Meeting Minutes E] Samples [3 Change Order(s) [3 InSpection Report I-3 F1 Sketches/Drawings [-1 APplication(s) for Payment Sets Copies . Document Date DOcument Number Description Set of Construction Plans These are transmitted as indicated below: r-1 Approved [3 Approved as Noted [3 Not Approved, Revise and Resubmit [3 ActionNot Required F1 Action Indicated on Item Transmitted F1 For Signature. Return COpies to Us fi0 For Your Review or Use F1 For YoUr Review & Comment F1 As Requested F1 For Your Records El For Your Approval ,, Remarks: For Carmel/Clay TAC Members for project review. James K. Shinneman, PE CC: ALLAN h. WE!HE,.P.E L.$. ~ PRESIDENT · 10505 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA'46280 (317') 846'6611 (800) 452'6408 FAX.: '(317)843-054t~ I 'NC,.. Ci'VIL ENGINEERS., LAND SURVEYORS, LAND PLANNERS, LANDSCAPE ARCHITECTS LETTER OF TRANSMITTAL To: Veolia Water Indianapolis Project: Carmel Lutheran Church- Sanctuary & Youth Addition PO Box 1220 JOb #: W030545 Indianapolis, Indiana 46206 Date: June 1, 2004 Phone: 639-1501 Attn: Pam Waggoner Fax: 263-6452 We are sending you l~ Attached E! Under seParate cover via delivery the following items: V-1 Shop Drawings E] Prints V-I Copy of Letter [3 Product Data F'] Specifications E] Meeting Minutes ['-I Samples [3 Change Order(s) E] Inspection RepOrt -'1 V1 Sketches/Drawings V1 Application(s) for Payment E] Sets Document Document Description [8] Copies Date Number 1 Set of Construction Plans , , . ,, ............... These are transmitted as indicated below: V'i Approved FI Approved as Noted F-1 Not Approved,' Revise and Resubmit El Action Not Required E] Action Indicated on Item Transmitted F'l For Signature. Return__ Copies to Us For Your Review or Use For Your Review & Comment As Requested For Your Records For Your Approval Remarks: For Carmel/Clay TAC Members for project review James K. Shinneman, PE CC: ALLAN H, WEtHE; P.E ..... L.$, -.PR. ESID£NT 0505 NORTH COLLEGE AVENUE INDIANAPoLis, iNDIANA 46280 ('31.7) 846:66 t I (800.) 452'6408 FAX: (31'7)843-0546 Ci~Vll ENgiNeers,, LANd SurveyoRs, LAnd PLANNers., LaNdScape ArChiteCtS LETTER OF TRANSMITTAL To-' Carmel/Clay Parks Department Project: Carmel lutheran Church - Sanctuary & Youth Addition 1055 Third Avenue Southwest Job #: W030545 , Carmel, Indiana 46032 Date: June 1, 2004 Phone: 848-7275 Attn: Mark Westermeier Fax: 776-1101 we are sending you I~ Attached l"l Under separate coVer via delivery the following items' E] Shop Drawings [3 Prints [3 Copy of Letter [3 Product Data E] Specifications [3 Meeting Minutes [3 Samples [3 Change Order(s) [3 Inspection Report F1 El Sketches/Drawings El Application(s) for Payment El Sets Document Document Description IX] Copies Date Number 1 Set of Construction Plans · . · · These are transmitted as indicated below: [-q Approved F1 Approved as Noted F-1 Not Approved, Revise and Resubmit E] Action Not Required El Action Indicated on Item Transmitted !-3 For Signature. Return Copies to Us [8] For Your Review or Use I'-I For Your Review & Comment F1 As Requested F1 For Your Records E1 For Your Approval , Remarks: For Carmel/Clay TAC Members for project review James K. Shinneman, PE CC: ALLAN .h, WEIHE,...P,E ..... L,$,- PRESIDENT 1'0505 NORTH COLLEGE AVENUE INDIANAPOLIS., INDIANA 46280 (317) 846-66t '! (800.) 452'6408 FAX: (317)843-0'546 JAMES J. NELSON CHARLES D. FRANKENBERGER JAMES E. SHINAVER LAWRENCE J. KEMPER JOHN B. FLATT FREDRIC LAWRENCE of counsel JANE B. MERRILL FRANKENBERGER A PROFESSIONAL CORPORATION ATTORNEYS-AT-LAW 3105 EAST 98TH STREET SUITE 170 INDIANAPOLIS, INDIANA 46280 317-844-0106 FAX: 317-846-8782 VIA HAND DELIVERY May 28, 2004 Jon Dobosiewicz City of Carmel Department of Community Services One Civic Square Carmel, IN 46032 Re.' Carmel Lutheran Church- Special Use Amend and Development Standards Variance Dear Jon: Enclosed are (i) an original and 1 copy of the Special Use Amendment application, (ii) and original and 1 copy of the Developmental Standards Variance application, (iii) 2 copies of a location map, and (iv) 2 full-size sets of plans. Please notify me when you have docket numbers for each matter and the filing fee for each. Please call me with any questions. Thank you. Very truly yours, NELSON & FRANKENBERGER Lawrence~pper LJK/jlw Enclosures H:XJanet\Carmel Lutheran Church~Dobosiewicz llx 052804.doc