Loading...
HomeMy WebLinkAboutAA412 Elevator Plans & SectionsProject: Developer: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: By: Sheet Title: CARMEL CITY CENTER Carmel, Indiana Building A Phase 1 COPYRIGHT & OWNERSHIP OF DOCUMENTS Architecture / Project Management: Project Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue Date PEDCOR DESIGN GROUP LLC 0502.00 AA412 Elevator Plans & Sections 03.29.07 THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP,LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP,LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP,LLC. © COPYRIGHT 2006, 2007, 2008 JAMES R. STUTZMAN, AIA, CARMEL, INDIANA BID SET A.410 ISSUE, 12/29/08 SCALE: NTS PLAN NORTH 28 22 16 H M AREA A AREA C AREA B R KEY PLAN BLDG A Monday, December 29, 2008; alldata:MS:DESIGN:PROJECTS:CARMEL CITY CENTER:CCC Drawings:CCC Construction Doc:Building A:A.200:A.200 Main sheets.pln 14 14 14 1 AA501 10 AA414 9 AA501 8'-103/8" 4'-0" MIN. EL.: -15'-0" EL.: -13'-0" 17'-0" 18'-11/2" WATERPROOFING CMU EA7 ELEVATOR SHAFT COORDINATE SUMP PIT LOCATION W/ ELEVATOR MANUFACTURER, PROVIDE STEEL GRATE COVER & FRAME WATERPROOFING LADDERS BY ELEVATOR MANUFACTURER EL. = EL. = EL. = 8'-3" min. CONC. BEAM, REF. STRUCTURAL LINTEL, REF. S- SERIES DRAWINGS NOTE: REFERENCE S-SERIES DRAWINGS FOR BOND BEAM REQUIREMENTS IN CMU WALLS. -3'-1" Plaza Sandwich +2'-0" First Floor +20'-0" Second Floor SCALE: 1/4" = 1'-0" 12 ELEVATOR EA7 N/S SHAFT SECTION AA412 0 2' 4' 8' 18'-0" 4'-0" min. WATERPROOFING HIGHEST POINT OF SLOPED PIT FLOOR 1ELEVATOR SHAFT WATERPROOFING COORDINATE SUMP PIT LOCATION W/ ELEVATOR MANUFACTURER, PROVIDE STEEL GRATE COVER & FRAME EA6 LADDERS BY ELEVATOR MANUFACTURER HOIST BEAM, REF. S-SERIES DRAWINGS NOTE: REFERENCE S-SERIES DRAWINGS FOR BOND BEAM REQUIREMENTS IN CMU WALLS. -3'-1" Plaza Sandwich +2'-0" First Floor +20'-0" Second Floor SCALE: 1/4" = 1'-0" 11 ELEVATOR EA6 N/S SHAFT SECTION AA412 0 2' 4' 8' 4'-0" MIN. EA7 1ELEVATOR SHAFT LADDERS BY ELEVATOR MANUFACTURER HIGHEST POINT OF SLOPED PIT FLOOR WATERPROOFING COORDINATE SUMP PIT LOCATION W/ ELEVATOR MANUFACTURER, PROVIDE STEEL GRATE COVER & FRAME EL. = EL. = EL. = EL. = NOTE: REFERENCE S-SERIES DRAWINGS FOR BOND BEAM REQUIREMENTS IN CMU WALLS. -3'-1" Plaza Sandwich +2'-0" First Floor +20'-0" Second Floor SCALE: 1/4" = 1'-0" 10 ELEVATOR EA7 E/W SHAFT SECTION AA412 0 2' 4' 8' Q.2 Q.5 21.9 10 AA412 - 12 AA412 - 11'-43/4" 41/2" 5'-3" 1'-101/2" 7'-6" VERIFY W/ ELEVATOR MANF. M.O. WIDTH, HEIGHT, & LOCATION ELEVATOR EA7 SCALE: 1/4" = 1'-0" 8 ELEV.EA7 PARKING LEVEL PLAN AA412 0 2' 4' 8' Q.2 Q.5 21.9 12 AA412 - 10 AA412 - 7'-6" 11'-43/4" 75/8" 41/2" VERIFY W/ 5'-3" 1'-101/2" ELEVATOR MANF. M.O. WIDTH, HEIGHT, & LOCATION ELEVATOR EA7 SCALE: 1/4" = 1'-0" 7 ELEV. EA7 FIRST FLR. PLAN AA412 0 2' 4' 8' P 23.6 P.1 9 AA412 - 11 AA412 - 3" 4'-9" 3'-6" 7'-1" 8'-6" VERIFY W/ ELEVATOR MANF. M.O. WIDTH, HEIGHT, & LOCATION EA6 ELEVATOR SCALE: 1/4" = 1'-0" 6 ELEV.EA6 PARKING LEVEL PLAN AA412 0 2' 4' 8' P 23.6 P.1 9 AA412 - 11 AA412 - 7'-1" 3" 4'-9" 3'-6" 8'-6" VERIFY W/ ELEVATOR MANF. M.O. WIDTH, HEIGHT, & LOCATION EA6 ELEVATOR SCALE: 1/4" = 1'-0" 5 ELEV. EA6 FIRST FLR. PLAN AA412 0 2' 4' 8' J.5 23.6 2 AA412 - 1 AA412 - 1'-101/2" 5'-3" 41/2" 10'-4" 7'-6" 5'-23/8" 8" 10'-4" 75/8" VERIFY W/ ELEVATOR MANF. M.O. WIDTH, HEIGHT, & LOCATION ELEVATOR EA1 SCALE: 1/4" = 1'-0" 4 ELEV. EA1 PARKING LEVEL PLAN AA412 0 2' 4' 8' J.5 23.6 2 AA412 - 1 AA412 - 10'-4" 7'-6" 1'-101/2" 5'-3" 41/2" VERIFY W/ ELEVATOR MANF. M.O. WIDTH, HEIGHT, & LOCATION ELEVATOR EA1 SCALE: 1/4" = 1'-0" 3 ELEV. EA1 FIRST FLR. PLAN AA412 0 2' 4' 8' 1 AA501 9 AA501 4'-0" MIN. EL.= -17'-5" 19'-5" SLOPED PIT FLOOR REF. STRUCTURAL CMU ELEVATOR EA1 WATERPROOFING WATERPROOFING COORDINATE SUMP PIT LOCATION W/ ELEVATOR MANUFACTURER, PROVIDE STEEL GRATE COVER & FRAME LADDERS BY ELEVATOR MANUFACTURER LINTEL, REF. S- SERIES DRAWINGS HOIST BEAM, REF. S-SERIES DRAWINGS EL. = EL. = EL. = NOTE: REFERENCE S-SERIES DRAWINGS FOR BOND BEAM REQUIREMENTS IN CMU WALLS. -3'-1" Plaza Sandwich +2'-0" First Floor +20'-0" Second Floor SCALE: 1/4" = 1'-0" 2 ELEVATOR EA1 E/W SHAFT SECTION AA412 0 2' 4' 8' J.2 J.3 J.4 J.5 25.5 25.3 25.4 21.4 21.5 Q.2 Q.5 P P.1 23.6 23.1 1 AA501 9 AA501 8'-83/8" 4'-0" min. 18'-10" EL.: -16'-10" CMU WATERPROOFING ELEVATOR SHAFT EA6 COORDINATE SUMP PIT LOCATION W/ ELEVATOR MANUFACTURER, PROVIDE STEEL GRATE COVER & FRAME WATERPROOFING 8'-3" min. LADDERS BY ELEVATOR MANUFACTURER HOIST BEAM, REF. S-SERIES DRAWINGS EL. = EL. = EL. = LINTEL, REF. S- SERIES DRAWINGS CONC. BEAM, REF. STRUCTURAL NOTE: REFERENCE S-SERIES DRAWINGS FOR BOND BEAM REQUIREMENTS IN CMU WALLS. -3'-1" Plaza Sandwich +2'-0" First Floor +20'-0" Second Floor SCALE: 1/4" = 1'-0" 9 ELEVATOR EA6 E/W SHAFT SECTION AA412 0 2' 4' 8' SECOND FLOOR +20'-0" 4'-0" MIN. 18'-11/2" FIRST FLOOR +2'-0" 1ELEVATOR SHAFT EA1 WATERPROOFING WATERPROOFING COORDINATE SUMP PIT LOCATION W/ ELEVATOR MANUFACTURER, PROVIDE STEEL GRATE COVER & FRAME HIGHEST POINT OF SLOPED PIT FLOOR LADDERS BY ELEVATOR MANUFACTURER HOIST BEAM, REF. S-SERIES DRAWINGS FIRE PROTECTION ON ALL STEEL STRUCTURE EL. = EL. = EL. = EL. = NOTE: REFERENCE S-SERIES DRAWINGS FOR BOND BEAM REQUIREMENTS IN CMU WALLS. -3'-1" Plaza Sandwich +2'-0" First Floor +20'-0" Second Floor SCALE: 1/4" = 1'-0" 1 ELEVATOR EA1 N/S SHAFT SECTION AA412 0 2' 4' 8' 4.27.07 jdr, jaw jaw Bid Set A.200,A.210,A.400 12-29-08