Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AA577 PLAN DETAILS EAST AREA B LL 25-28
Project: Developer: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: By: Sheet Title: CARMEL CITY CENTER Carmel, Indiana Building A Phase 1 COPYRIGHT & OWNERSHIP OF DOCUMENTS Architecture / Project Management: Project Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue Date PEDCOR DESIGN GROUP LLC 0502.00 AA577 PLAN DETAILS EAST AREA B LL 25-28 Bid Set !"#!$#%& THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP,LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP,LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP,LLC. © COPYRIGHT 2006, 2007, 2008 JAMES R. STUTZMAN, AIA, CARMEL, INDIANA 25 26 27 28 29 BID SET A.410 ISSUE, 12/29/08 BID SET A.210.ASI.01, 01/20/09 (AFFECTING A.300, A.310, A.400) WINDOW SCHEDULE UPDATE, 2/02/09 BID SET A.300, 02/07/09 MASONRY AND EIFS UPDATE BID SET A.300, 02/27/09 MASONRY AND EIFS UPDATE 2 A.300.ASI.004, 03/08/09 CCC.A.ASI.1, 5.20.09 RFI UPDATES, PUBLIC WAYS, ROOF UPDATES !"#$%&’()! !"#$%$&’() !" !! #$ % & ’()’*’ ’()’*+ ’()’*, ( !"#$%&’( )&*+$’ NOT FOR CONSTRUCTION Tuesday, May 19, 2009; ALLDATA:MS:DESIGN:PROJECTS:CARMEL CITY CENTER:CCC Drawings:CCC Construction Doc:Building A:A.General:BLDG A SHELL FILES:EAST MODULES:Bldg A-EAST LL 25-28.pln 29 29 P.5 27.6 1'-6" 1'-6" 8" 3'-0" 8" 1'-3" 6 1/2" 6 1/8" ALUM. STOREFRONT STONE BASE BELOW BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUD WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING BACKER ROD AND SEALANT BATT INSULATION STONE BASE BELOW CMU BELOW VAPOR BARRIER Q 27.6 1'-3" 6 1/8" 6 1/2" 1'-6" 1'-6" 8" 3'-0" 2'-2" 11 1/2" 8 7/8" ALUM. STOREFRONT STONE BASE BELOW BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUD WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING BACKER ROD AND SEALANT BATT INSULATION STONE BASE BELOW CMU BELOW PREFIN. BRAKE METAL FILLER VAPOR BARRIER WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING Q.5 28 1'-6" 1'-6" 3'-0" 1'-6" 1'-6" 3'-0" 1'-11" 1'-11" STONE BASE BELOW BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUD WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING Q.5 27.6 1'-6" 1'-6" 3'-0" 1'-8" 1'-8 3/8" 1'-8 3/8" ALUM. STOREFRONT STONE BASE BELOW BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUD BACKER ROD AND SEALANT BATT INSULATION STONE BASE BELOW CMU BELOW PREFIN. BRAKE METAL FILLER WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING VAPOR BARRIER WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING R 27.6 1'-6" 1'-6" 3'-0" 1'-6 3/8" 1'-1 1/2" 6 1/2" 1'-8 3/8" 6" 5 1/2" ALUM. STOREFRONT STONE BASE BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUD BACKER ROD AND SEALANT BATT INSULATION STONE BASE BELOW CMU BELOW WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING VAPOR BARRIER R 27 2 5/8" 1'-8 3/8" 6" 1'-0" 11 1/8" 6 7/8" PREFIN. BRAKE METAL FILLER ALUM. STOREFRONT STONE BASE BELOW BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUD BACKER ROD AND SEALANT BATT INSULATION STONE BASE BELOW CMU BELOW WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING VAPOR BARRIER WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING R.2 26 1'-8 3/8" 1'-8 3/8" 1'-6" 1'-6" 11 1/2" 11 1/2" 5 3/8" 6 1/8" 1'-6" PREFIN. BRAKE METAL FILLER ALUM. STOREFRONT STONE BASE BELOW BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUD BACKER ROD AND SEALANT BATT INSULATION STONE BASE BELOW CMU BELOW WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING VAPOR BARRIER R.2 25.4 8 7/8" 11 1/2" 5 3/8" 6 1/8" 1'-6" 1'-6" 6 1/8" 5 3/8" 1'-8 3/8" 1'-6" 1'-6" ALUM. STOREFRONT STONE BASE BELOW BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUD BACKER ROD AND SEALANT BATT INSULATION SHIM, TYPICAL STONE BASE BELOW CMU BELOW WEATER BARRIER OVER 5/8" EXTERIOR SHEATHING PREFIN. BRAKE METAL FILLER VAPOR BARRIER P 27.6 1'-3 1/2" 1'-3 1/2" 1'-4 7/8" 7 1/2" 7 1/2" 1'-10 1/2" 1'-10" 1'-10" 8" 2'-3 5/8" 6 1/8" 8 1/4" 1'-0 7/8" ALUM. STOREFRONT STONE BASE BELOW BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUD WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING BACKER ROD AND SEALANT BATT INSULATION WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING P.1 27.6 3 1/8" 1'-4 5/8" 1'-3" 6" 8" 2" 1'-9 1/2" 6 1/8" BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUDS WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING BACKER ROD AND SEALANT 3/4" EFIS VENEER EFIS VENEER STONE BAND BELOW JOINT BETWEEN STONE AND EFIS BAND BELOW WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING ADJ. FACADE EFIS VENEER P.5 27.6 1'-3" 6 1/8" 1'-9 1/2" 6 1/8" 8" 3'-0" 8" BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUDS WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING BACKER ROD AND SEALANT 3/4" EFIS VENEER EFIS VENEER STONE BAND BELOW JOINT BETWEEN STONE AND EFIS BAND BELOW WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING Q 27.6 1'-3" 1'-9 1/2" 6 1/8" 5 3/8" 8" 1'-6" BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUDS WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING BACKER ROD AND SEALANT 3/4" EFIS VENEER EFIS VENEER STONE BAND BELOW JOINT BETWEEN STONE AND EFIS BAND BELOW Q.5 28 11 1/2" 11 1/2" 1'-6" 1'-6" 5 3/8" 6 1/8" 1'-6" BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUDS WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING BACKER ROD AND SEALANT 3/4" EFIS VENEER EFIS VENEER STONE BAND BELOW JOINT BETWEEN STONE AND EFIS BAND BELOW WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING R 27 6" 5 1/2" 1'-6" 5 3/8" 6 1/8" 1'-6" BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUDS WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING BACKER ROD AND SEALANT 3/4" EFIS VENEER EFIS VENEER STONE BAND BELOW BACKER ROD AND SEALANT JOINT BETWEEN STONE AND EFIS BAND BELOW WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING R.2 25.4 1'-11" 1'-6" 1'-6" 6 1/8" 2 1/4" 1'-2 5/8" 1'-2 7/8" 1'-9 1/8" 5 3/8" BRICK VENEER 2 1/4" AIR SPACE 8" CFS STUDS WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING BACKER ROD AND SEALANT 3/4" EFIS VENEER EFIS VENEER STONE BAND BELOW JOINT BETWEEN STONE AND EFIS BAND BELOW WEATHER BARRIER OVER 5/8" EXTERIOR SHEATHING SCALE: 1" = 1'-0" 2 PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 3 PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 4 PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 5 PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 6 PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 7 PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 8 PARAPET PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 9 PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 1 PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 10 PARAPET PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 11 PARAPET PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 12 PARAPET PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 13 PARAPET PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 14 PARAPET PLAN DETAIL AA577 0 6'' 1' 2' SCALE: 1" = 1'-0" 15 PARAPET PLAN DETAIL AA577 0 6'' 1' 2' 5.20.09 See sheets AA130 & AA131 for plan information, AA216 for elevation information, AA351 for wall section information NOT USED