Loading...
HomeMy WebLinkAboutIA403 PARKING LEVEL AREA C FIN. PLAN29 CCC.A.ASI.1, 5.20.09 RFI UPDATES, PUBLIC WAYS, ROOF UPDATES 30 BID SET A.500, CCC.A.ASI.2, 5/15/09 PLUMBING FIXTURE DIMENSION UPDATE Project Number: Revisions: Issue Date Drawn By Checked By Architecture / Project Managment: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: Sheet Title: Project: Developer: By: CARMEL CITY CENTER Carmel, Indiana Building A Phase 1 COPYRIGHT & OWNERSHIP OF DOCUMENTS SCALE: NTS PLAN NORTH 28 22 16 H M AREA A AREA C AREA B R KEY PLAN BLDG A PEDCOR DESIGN GROUP 0502.00 IA403 PARKING LEVEL AREA C FIN. PLAN Friday, May 22, 2009; alldata:MS:DESIGN:PROJECTS:CARMEL CITY CENTER:CCC Drawings:CCC Construction Doc:Building A:A.General:BLDG A INTERIORS:CDs:IBASE.pln BID SET A500 AR MC THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP,LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP,LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP,LLC. © COPYRIGHT 2006, 2007, 2008 JAMES R. STUTZMAN, AIA, CARMEL, INDIANA 01/22/2009 REVIEW SET: 12/04/07 BID SET: 01/22/09 22 15.5 21 20 19 18 17 16 21.4 18.1 16.1 21.9 19.9 17.1 16.9 21.5 UP 22 15.5 21 20 19 18 17 16 21.4 18.1 16.1 21.9 19.9 17.1 16.9 21.5 AREA B AREA C 22 15.5 21 20 19 18 17 16 21.4 18.1 16.1 21.9 19.9 17.1 16.9 21.5 9 IA427 FN8 SC1 SC1 RF1 B3 RAMP UP 1:12 RAMP UP 1:12 PARKING GARAGE PA00 RF2 VN1 Fire Command Center FFC 1 Toilet FFC 2 Elev EA11 Stair Lobby SA7 EA7M Passage PA12 Stor. PA13 Elevator Lby PA11 Elevator Lobby PA14 EA11M EA10M Loading PA15 TA5 TA6 Elev EA10 Retail RA03 Retail RA02 Retail RA04 Powr & Dist. Rm PA17 PDA5 Mech Fan Room PMA3 Stair PSA5 Mech Fan Room PMA4 PDA6 Elev EA8 Elev EA9 P4 P3 Elev EA7 GENERAL FINISH NOTES 1. CARPET TO CARPET AND/OR CARPET TO HARDSURFACE FLOORING TRANSITIONS TO BE FEATHERED AS REQUIRED OR ARE TO BE EASED USING LATEX TO ACHIEVE A SMOOTH TRANSITION FROM FINISH TO FINISH. G.C. TO SUBMIT SEAMING DIAGRAMS OF ALL CARPET IN PROJECT SCOPE FOR REVIEW AND APPROVAL BY ARCHITECT BEFORE PROCEEDING WITH FLOORING INSTALLATION. 2. 3. 4. ALL NEW WOOD TRIM TO BE PAINTED P5. 11. 12. BASE IN PUBLIC REST ROOMS MUST BE MINIMUM 5" HEIGHT TO MEET BOARD OF HEALTH CODE. G.C. TO PROVIDE VINYL REDUCER STRIP WHERE CARPET AND VINYL TILE TRANSITIONS TAKE PLACE IN COMMON AREAS. COLOR TO MATCH COMMON CORRIDOR BASE B7. GROUT TO BE 100% EPOXY. COLOR TO BE SELECTED BY ARCHITECT. G.C. TO SUBMIT STAINED AND/OR PAINTED SAMPLE OF MILLWORK TO ARCHITECT FOR REVIEW AND APPROVAL BEFORE PROCEEDING WITH MILLWORK FINISHING PROCESS. PAINT ALL EXPOSED METAL SURFACES (i.e.. GRILLS, HEATERS, AND FIRE EXTINGUISHER CABINETS) TO MATCH ADJACENT SURFACE. PAINT NEW PLYWOOD PHONE BOARDS WITH FIRE RETARDANT PAINT. COLOR TO MATCH ADJACENT WALL FINISH. REFERENCE INTERIOR ELEVATIONS, WHERE PROVIDED, FOR ADDITIONAL FINISH INFORMATION. 5. 6. 7. 8. 9. 10. 13. G.C. TO PROVIDE ZINC OR BRASS TRANSITION STRIP WHERE CARPET AND TILE FINISHES MEET IN COMMON AREAS. SEE ENLARGED PLANS ON IA427 FOR FINISH. ALL NEW DOORS TO BE PAINTED P5. ALL INSIDE OF BALCONY DOORS TO BE PAINTED P5 TO MATCH INTERIOR DOORS. ALL NEW DOOR FRAMES TO BE PAINTED P5. BLINDS ARE TO BE PROVIDED AT ALL PERIMETER WINDOW LOCATIONS, 2ND-5TH FLOOR APARTMENTS AND CONDOS. 14. 15. 16. 17. REFER TO 12/IA426 FOR TYPICAL APARTMENT AND STANDARD CONDO BATHROOM FLOOR PATTERN. REFER TO SHEET IA415 FOR GENERAL FINISH SCHEDULE. ALL DRYWALL BULKHEADS ARE TO BE PAINTED P2, UNLESS NOTED OTHERWISE ON REFLECTED CEILING PLANS. 18. ALL CORRIDOR DOORS AND DOOR FRAMES TO BE PAINTED P7. PROVIDE CROWN MOULDING. SEE DETAIL 3/IA425. CONTINUE STAIR FINISHES TO ROOF. FN9 ALTERNATES FINISH PLAN NOTES ALIGN FINISHES. REFER TO CUSTOM DRAWINGS FOR 6TH AND 7TH FLOOR PENTHOUSES. CUSTOM DRAWINGS TO BE PROVIDED UPON SALE OF PENTHOUSE UNIT. USE FULL TILE DEPTH AT BORDERS IN ELEVATOR LOBBY. 1. ALTERNATES WILL NOT BE ACCEPTED WITHOUT WRITTEN APPROVAL OF DESIGNER. SAMPLES, WHEN APPLICABLE, SHALL BE SUBMITTED FOR REVIEW. FN4 FN5 FN6 FN2 FN1 FN3 REFER TO SHEET IA415 FOR TYPICAL APARTMENT FINISH SCHEDULE. REFER TO SHEET IA415 FOR TYPICAL STANDARD CONDO FINISH SCHEDULE. OWNER OPTIONAL AND CUSTOM SELECTIONS TO BE PROVIDED UPON SALE OF CONDO UNIT. FN7 FN8 SEE ELEVATIONS ON IA428 FOR EXTENT OF WALL TILE. PROVIDE WOOD TRIM AND SILL AT EXTERIOR WINDOWS. SEE DETAIL 5/IA425. FN10 REFER TO 7/IA429 FOR TYPICAL TILE PATTERN. INSTALL CORNER SHELF ACCESSORY IN BATHROOMS AS FOLLOWS: CONDO SHOWERS (2) CS1-INSTALL AT 4' TO TOP AND 5'-3" TO TOP W/ LIP SIDE UP. CONDO TUBS (2) CS1-INSTALL AT 2'-6" TO TOP AND 4' TO TOP W/ LIP SIDE UP. APT. SHOWERS (1) CS2-INSTALL AT 4' TO TOP W/ SOAP DISH SIDE DOWN. APT. TUBS (1) CS2-INSTALL AT 2'-6" TO TOP W/ SOAP DISH SIDE DOWN. 19. INSTALL WALL PROTECTION PANELS VERTICALLY IN TRASH DISPOSAL ROOMS; AVOID SEAMS AT TRASH CHUTE OPENING. PAINT EXPOSED DRYWALL TO MATCH CEILING UNLESS OTHERWISE NOTED. PROVIDE SEAMING DIAGRAM TO ARCHITECT PRIOR TO INSTALLATION. FN11 PROVIDE WOOD TRIM AT EXTERIOR DOOR LOCATIONS. SEE DETAIL 1/IA425. AREA TO BE FINISHED BY TENANT OR BY OTHER. 20. USE JOHNSONITE COVE FILLER STRIP CFS-OO-A ON STAIRS WHEN INSTALLING ONE-PIECE TREAD/ RISER AS DIRECTED BY MANUFACTURER. 21. G.C. TO PROVIDE Z-BAR WHERE CARPET AND VINYL SHEET AND CARPET AND TILE TRANSITIONS TAKE PLACE IN APARTMENTS AND CONDOS. 22. REFER TO 11/IA430 FOR TYPICAL APARTMENT AND STANDARD CONDO KITCHEN FLOOR PATTERN. 23. FLOOR COVERING CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF TOP LAYER OF SOUND ISOLATION SYSTEM. SEE 3/IA426 FOR DETAILS. 24. A CAULKED JOINT IS TO BE PROVIDED AT TRANSITION OF FLOOR TILE TO WALL TILE. SEE 10/IA426 FOR DETAILS. N.5 P P.1 P.5 Q Q.2 Q.5 R R.1 R.2 R.3 R.5 R.6 S SCALE: 1/8" = 1'-0" 1 PARKING LEVEL FINISH PLAN IA403 AREA C N NOTE: REFER TO SHEET IA415 FOR FINISH SCHEDULE.