Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LS101 First Floor Plan
Project: Developer: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: By: Sheet Title: CARMEL CITY CENTER Carmel, Indiana Building A Phase 1 COPYRIGHT & OWNERSHIP OF DOCUMENTS Architecture / Project Management: Project Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue Date PEDCOR DESIGN GROUP LLC 0502.00 LS101 First Floor Plan !"#$%#!& THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP,LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP,LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP,LLC. © COPYRIGHT 2006, 2007, 2008 JAMES R. STUTZMAN, AIA, CARMEL, INDIANA 30 31 32 33 34 BID SET A.500, CCC.A.ASI.2, 5/15/09 PLUMBING FIXTURE DIMENSION UPDATE A.ASI.003, 05/29/09 STOREFRONT AND WALL BASE UPDATES 6/29/09 A.ASI.004, 06/10/09 SHEET METAL FLASHING & METAL ROOF COLOR UPDATE, 08/17/09 !"#$%&’()! !"#$%$&’() !" !! #$ % & ’()’*’ ’()’*+ ’()’*, ( !"#$%&’( )&*+$’ Monday, August 17, 2009; alldata:MS:DESIGN:PROJECTS:CARMEL CITY CENTER:CCC Drawings:CCC Construction Doc:Building A:A.General:BLDG A LAYOUT DRAWINGS:BLDG A LS Sheets.pln RJP JAW 04.06.07 H H.5 J J.05 J.1 J.2J.3 J.4 J.5 K K.5 L L.1 L.5 L.9 M M.5 M.9 N N.1 N.5 P P.1 P.5 Q Q.2 Q.5 R R.1 R.2 R.3 R.5 R.6 S H H.5 J J.05 J.1 J.2J.3 J.4 J.5 K K.5 L L.1 L.5 L.9 M M.5 M.9 N N.1 N.5 P P.1 P.5 Q Q.2 Q.5 R R.1 R.2 R.3 R.5 R.6 S 27.6 27.5 27 26.9 26.26.5 26.4 3 26 25.7 25.4 25.3 25 24.1 24 23.6 23.1 23 22 21.9 21.5 21.4 21 20 19.9 19 18.1 18 17.1 17 16.9 16.1 16 15.5 28 27.6 27 26 25 24 23 22 23.6 15.5 21 20 19 18 17 16 15 26.4 26.5 21.4 18.1 16.1 24.1 23.1 21.9 19.9 17.1 16.9 28.1 21.5 25.7 25.4 26.9 26.3 27.5 25.3 28 27.6 27 26 25 24 23 22 23.6 15.5 21 20 19 18 17 16 15 26.4 26.5 21.4 18.1 16.1 24.1 23.1 21.9 19.9 17.1 16.9 28.1 21.5 25.7 25.4 26.9 26.3 27.5 25.3 28 27.6 27 26 25 24 23 22 23.6 15.5 21 20 19 18 17 16 15 26.4 26.5 21.4 18.1 16.1 24.1 23.1 21.9 19.9 17.1 16.9 28.1 21.5 25.7 25.4 26.9 26.3 27.5 25.3 28 27.6 27 26 25 24 23 22 23.6 15.5 21 20 19 18 17 16 15 26.4 26.5 21.4 18.1 16.1 24.1 23.1 21.9 19.9 17.1 16.9 28.1 21.5 25.7 25.4 26.9 26.3 27.5 25.3 28 27.6 27 26 25 24 23 22 23.6 15.5 21 20 19 18 17 16 15 26.4 26.5 21.4 18.1 16.1 24.1 23.1 21.9 19.9 17.1 16.9 28.1 21.5 25.7 25.4 26.9 26.3 27.5 25.3 DN 28 27.6 27 26 25 24 23 22 23.6 15.5 21 20 19 18 17 16 15 26.4 26.5 21.4 18.1 16.1 24.1 23.1 21.9 19.9 17.1 16.9 28.1 21.5 25.7 25.4 26.9 26.3 27.5 25.3 AREA B AREA C AREA A AREA B AREA B AREA C AREA B AREA C AREA A AREA B AREA B AREA C AREA B AREA C AREA A AREA B AREA B AREA C Stair SA4 Elev EA12 Service Corridor A149 Exit Passageway A146 Public Passage A30 Service Corridor A131 Elev. Lobby A159 Public Toilets A144 Service Corridor A155 Toilet Access A145 Public Passage A20 Public Passage A31 Mech Shaft MA3 Elev. Lobby A138 Exit Passageway A139 Public Passage TRASH DISP. A10 DA1 TRASH DISP. DA4 Power Distrib. Room A156 Mtr Rm (GA-1) A158 Stair SA3 Elev EA6 Stair SA5 Stair SA1 Retail A116 Family A141 Retail A112 Elev EA9 Elev EA8 Women A143 Men A142 TR A152 TR A157 Service Corridor A140 Service Lobby A137 Retail A109 Mech Shaft MA1 Elev EA1 Retail A107 Retail A106 Retail A105 Retail A104 Retail A103 Stair SA2 Retail A113 Retail A123 Retail A114 Retail A122 Domestic Water A133 Pwr Distrib. Rm A147 Pwr Distrib. Rm A135 TR A136 Service Corridor A151 Service Corridor A150 Retail A108 Retail A102 Elev. Lobby A153 TRASH DISP. DA5 Elev. Lobby A154 Mtr Rm 1A-3 (A134) Retail A110 Retail A111 Exterior Colonnade 2 Exterior Colonnade 3 Exterior Colonnade 4 DEAD SPACE Mech Shaft MA4 Entry A40 DA6 Power Distrib. Room A161 Mtr Rm 1A-1 (A162) Stair SA6 Elev EA11 Retail A119 Retail A117 Retail A120 Retail A118 Service Corridor A160 ELEV EA4 ELEV EA5 MECH SHAFT MA2 Exterior Colonnade 1 Elev EA3 Elev EA2 Retail A121 Retail A115 Retail A101 Retail A124 Elev EA7 Elev EA10 SCALE: 1/16" = 1'-0" 1 First Floor Plan LS101 0 8' 16' 32' All Bid Sets 08.17.09 NOTE: 1 HOUR RATED EXTERIOR WALL ON FIRST FLOOR ALONG GRID LINE P.1 FROM COLUMN LINE 18 TO 23, CONTINUING WEST ALONG 23 TO N.1.