Loading...
HomeMy WebLinkAboutAA524 DetailsProject: Developer: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: By: Sheet Title: CARMEL CITY CENTER Carmel, Indiana Building A Phase 1 COPYRIGHT & OWNERSHIP OF DOCUMENTS Architecture / Project Management: Project Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue Date PEDCOR DESIGN GROUP LLC 0502.00 AA524 Details Bid Set 04.21.06 THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP,LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP,LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP,LLC. © COPYRIGHT 2006, 2007, 2008 JAMES R. STUTZMAN, AIA, CARMEL, INDIANA 13 12 11 14 15 16 CONSTRUCTION SET A.100; A.200 06/29/07 BID SET A.400 ISSUE, 08/17/07 A.100.ASI.012, A.200.ASI.001, 09/13/07 A.100.ASI.013, 12/14/07 BID SET A.400 RE-ISSUE, 09/19/08 BID SET A.210 ISSUE, 05/01/08 BID SET A.410 ISSUE, XX/XX/08 BID SET A.300 C.1 ISSUE, 06/27/08 E R 28 22 16 H 11 SCALE: NTS PLAN NORTH KEY PLAN 81/2" 81/2" 10" 10" 51/2" 1'-01/4" 1'-93/8" 6" 61/4" 1'-0" W S V 10" 1'-07/8" 1'-33/8" 1'-63/4" 1'-91/4" 2'-41/4" 3'-4" 1'-01/8" 1'-81/8" 81/2" W S V 111/2" 7" 7" 1'-33/4" 1'-71/4" 8" 111/2" 1'-113/8" W V S 8" 10" 10" 11" S 111/2" 11" 1'-47/8" 113/8" 8" 51/2" 8" 1'-45/8" W V S 1'-4" 9" 10" 51/2" 10" 111/2" 1'-0" 51/2" S V V W W 2'-0" 9" 1'-31/4" 1'-41/4" 1'-31/4" 1'-23/4" S 8" 8" 11" 1'-93/8" 1'-43/8" 1'-93/8" 1'-43/8" 3" 3" 3" 3" W V 8" 11" W V 101/2" 73/4" 81/2" 41/2" 81/2" 111/2" 23/4" 113/8" 1'-57/8" 1'-93/8" 1'-63/8" V W S 6" 10" 73/4" 101/2" 81/2" 1'-4" 81/2" 111/2" 1'-1" W V S V 10" 1'-31/4" 1'-31/4" 1'-41/4" 113/8" 61/4" 1'-45/8" 1'-01/4" 51/4" 83/4" S SCALE: 1" = 1'-0" N5/23.1 2nd-5th Floor Drains AA524 SCALE: 1" = 1'-0" N5/23.1 1st Floor Drains AA524 SCALE: 1" = 1'-0" P5/23 7th Floor Drains AA524 SCALE: 1" = 1'-0" P5/23 6th Floor Drains AA524 SCALE: 1" = 1'-0" P5/23 2nd-5th Floor Drains AA524 SCALE: 1" = 1'-0" Q/23 1st Floor Drains AA524 SCALE: 1" = 1'-0" Q5/23 7th Floor Drains AA524 SCALE: 1" = 1'-0" Q5/23 6th Floor Drains AA524 SCALE: 1" = 1'-0" Q5/23 2nd-5th Floor Drains AA524 SCALE: 1" = 1'-0" Q5/23 1st Floor Drains AA524 SCALE: 1" = 1'-0" R/23 6th Floor Drains AA524 SCALE: 1" = 1'-0" R/23 2nd-5th Floor Drains AA524 SCALE: 1" = 1'-0" P5/22 7th Floor Drains AA524 SCALE: 1" = 1'-0" P5/22 6th Floor Drains AA524 SCALE: 1" = 1'-0" P5/22 2nd-5th Floor Drains AA524 SCALE: 1" = 1'-0" P5/22 1st Floor Drains AA524 SCALE: 1" = 1'-0" Q5/22 7th Floor Drains AA524 SCALE: 1" = 1'-0" Q5/22 6th Floor Drains AA524 SCALE: 1" = 1'-0" Q5/22 2nd-5th Floor Drains AA524 SCALE: 1" = 1'-0" Q5/22 1st Floor Drains AA524 SCALE: 1" = 1'-0" R/22 6th Floor Drains AA524 SCALE: 1" = 1'-0" R/22 2nd-5th Floor Drains AA524 SCALE: 1" = 1'-0" N5/23.1 7th Floor Drains AA524 SCALE: 1" = 1'-0" N5/23.1 6th Floor Drains AA524 DCW A.210,A.400 DCW 08.21.08 09.19.08