Loading...
HomeMy WebLinkAboutIA408 4TH FL-5TH FL. AREA A FIN. PLAN29 CCC.A.ASI.1, 5.20.09 RFI UPDATES, PUBLIC WAYS, ROOF UPDATES 30 BID SET A.500, CCC.A.ASI.2, 5/15/09 PLUMBING FIXTURE DIMENSION UPDATE Project: Project Number: Revisions: Issue Date Drawn By Checked By Developer: Architecture / Project Managment: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: By: Sheet Title: CARMEL CITY CENTER Carmel, Indiana Building A Phase 1 COPYRIGHT & OWNERSHIP OF DOCUMENTS SCALE: NTS PLAN NORTH 28 22 16 H M AREA A AREA C AREA B R KEY PLAN BLDG A PEDCOR DESIGN GROUP 0502.00 IA408 4TH FL-5TH FL. AREA A FIN. PLAN Friday, May 22, 2009; alldata:MS:DESIGN:PROJECTS:CARMEL CITY CENTER:CCC Drawings:CCC Construction Doc:Building A:A.General:BLDG A INTERIORS:CDs:IBASE.pln BID SET A500 AR MC THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP,LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP,LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP,LLC. © COPYRIGHT 2006, 2007, 2008 JAMES R. STUTZMAN, AIA, CARMEL, INDIANA 01/22/2009 REVIEW SET: 12/04/07 BID SET: 01/22/09 FN4 FN4 FN8 NOTE: SEE 4TH FLOOR FOR MAIN LEVEL. Hood Shaft MASTER BATH L1 STAIR 6 MASTER BEDROOM L1 MECH L4 MASTER BEDROOM L3 UNIT L09 MASTER BATH L2 STAIR 16 UNIT L01 CL L3 CL L2 W4 B7 P3 P4 B3 MECH L4 Stair SA1 MECH. RM MA-A1 MECH. RM MA-A2 W28 W28 C3 RF2 RF2 RF1 VN1 GENERAL FINISH NOTES 1. CARPET TO CARPET AND/OR CARPET TO HARDSURFACE FLOORING TRANSITIONS TO BE FEATHERED AS REQUIRED OR ARE TO BE EASED USING LATEX TO ACHIEVE A SMOOTH TRANSITION FROM FINISH TO FINISH. G.C. TO SUBMIT SEAMING DIAGRAMS OF ALL CARPET IN PROJECT SCOPE FOR REVIEW AND APPROVAL BY ARCHITECT BEFORE PROCEEDING WITH FLOORING INSTALLATION. 2. 3. 4. ALL NEW WOOD TRIM TO BE PAINTED P5. 11. 12. BASE IN PUBLIC REST ROOMS MUST BE MINIMUM 5" HEIGHT TO MEET BOARD OF HEALTH CODE. G.C. TO PROVIDE VINYL REDUCER STRIP WHERE CARPET AND VINYL TILE TRANSITIONS TAKE PLACE IN COMMON AREAS. COLOR TO MATCH COMMON CORRIDOR BASE B7. GROUT TO BE 100% EPOXY. COLOR TO BE SELECTED BY ARCHITECT. G.C. TO SUBMIT STAINED AND/OR PAINTED SAMPLE OF MILLWORK TO ARCHITECT FOR REVIEW AND APPROVAL BEFORE PROCEEDING WITH MILLWORK FINISHING PROCESS. PAINT ALL EXPOSED METAL SURFACES (i.e.. GRILLS, HEATERS, AND FIRE EXTINGUISHER CABINETS) TO MATCH ADJACENT SURFACE. PAINT NEW PLYWOOD PHONE BOARDS WITH FIRE RETARDANT PAINT. COLOR TO MATCH ADJACENT WALL FINISH. REFERENCE INTERIOR ELEVATIONS, WHERE PROVIDED, FOR ADDITIONAL FINISH INFORMATION. 5. 6. 7. 8. 9. 10. 13. G.C. TO PROVIDE ZINC OR BRASS TRANSITION STRIP WHERE CARPET AND TILE FINISHES MEET IN COMMON AREAS. SEE ENLARGED PLANS ON IA427 FOR FINISH. ALL NEW DOORS TO BE PAINTED P5. ALL INSIDE OF BALCONY DOORS TO BE PAINTED P5 TO MATCH INTERIOR DOORS. ALL NEW DOOR FRAMES TO BE PAINTED P5. BLINDS ARE TO BE PROVIDED AT ALL PERIMETER WINDOW LOCATIONS, 2ND-5TH FLOOR APARTMENTS AND CONDOS. 14. 15. 16. 17. REFER TO 12/IA426 FOR TYPICAL APARTMENT AND STANDARD CONDO BATHROOM FLOOR PATTERN. REFER TO SHEET IA415 FOR GENERAL FINISH SCHEDULE. ALL DRYWALL BULKHEADS ARE TO BE PAINTED P2, UNLESS NOTED OTHERWISE ON REFLECTED CEILING PLANS. 18. ALL CORRIDOR DOORS AND DOOR FRAMES TO BE PAINTED P7. INSTALL CORNER SHELF ACCESSORY IN BATHROOMS AS FOLLOWS: CONDO SHOWERS (2) CS1-INSTALL AT 4' TO TOP AND 5'-3" TO TOP W/ LIP SIDE UP. CONDO TUBS (2) CS1-INSTALL AT 2'-6" TO TOP AND 4' TO TOP W/ LIP SIDE UP. APT. SHOWERS (1) CS2-INSTALL AT 4' TO TOP W/ SOAP DISH SIDE DOWN. APT. TUBS (1) CS2-INSTALL AT 2'-6" TO TOP W/ SOAP DISH SIDE DOWN. 19. INSTALL WALL PROTECTION PANELS VERTICALLY IN TRASH DISPOSAL ROOMS; AVOID SEAMS AT TRASH CHUTE OPENING. PAINT EXPOSED DRYWALL TO MATCH CEILING UNLESS OTHERWISE NOTED. PROVIDE SEAMING DIAGRAM TO ARCHITECT PRIOR TO INSTALLATION. 20. USE JOHNSONITE COVE FILLER STRIP CFS-OO-A ON STAIRS WHEN INSTALLING ONE-PIECE TREAD/ RISER AS DIRECTED BY MANUFACTURER. 21. G.C. TO PROVIDE Z-BAR WHERE CARPET AND VINYL SHEET AND CARPET AND TILE TRANSITIONS TAKE PLACE IN APARTMENTS AND CONDOS. 22. REFER TO 11/IA430 FOR TYPICAL APARTMENT AND STANDARD CONDO KITCHEN FLOOR PATTERN. 23. FLOOR COVERING CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF TOP LAYER OF SOUND ISOLATION SYSTEM. SEE 3/IA426 FOR DETAILS. 24. A CAULKED JOINT IS TO BE PROVIDED AT TRANSITION OF FLOOR TILE TO WALL TILE. SEE 10/IA426 FOR DETAILS. W41 W41 W23 W23 H H.5 J J.05 J.1 J.2 J.3 J.4 J.5 K K.5 L L.1 L.5 L.9 M FN8 FN4 FN7 FN7 FN4 FN7 FN7 FN7 FN7 FN4 FN7 FN8 FN2 FN7 FN7 FN7 FN7 FN7 FN11 FN11 NOTE: LOFT LEVEL ABOVE. NOTE: LOFT LEVEL ABOVE. AREA A AREA B AREA B AREA A UNIT 11 CL 2 ENTRY 1 LIVING ROOM 10 HALL 3 RF2 AREA A AREA B AREA B AREA A POWDER ROOM 6 BEDROOM 8 BEDROOM 12 BEDROOM 12 LINEN 11 STAIR 5 LIVING ROOM 14 UNIT 09 STAIR 16 CL. 3 UNIT 01 MASTER BEDROOM 8 KITCHEN 5 MECH. 7 CL. 4 CL 13 LINEN 11 BATH 10 POWDER ROOM 17 HALL 2 HALL 2 MECH 15 LIVING ROOM 7 BATHROOM 10 LAUNDRY 14 KITCHEN 15 CL. 13 CL. 9 ENTRY 1 ENTRY 1 CL. 9 B9 PCT3 TYP. C2/C7 C2/C7 PANTRY 6 TYP. BEDROOM 9 UNIT 10 HALLWAY 4 ENTRY 1 KITCHEN 6 LIVING ROOM 8 PANTRY 17 CL. 4 LAUNDRY 5 TYP. TYP. LAUNDRY 5 CL. 10 CL 2 PANTRY 7 BATHROOM 11 CL. 3 MECH. 12 KITCHEN 13 CL 15 LAUNDRY 3 CLOSET 6 MECH. 4 CL 2 LINEN 12 HALL 3 BATHROOM 3 CL 2 KITCHEN 11 POWDER ROOM 14 PANTRY 7 CL 2 MECH. 20 CL. 18 BEDROOM 13 DEN 17 UNIT 04 LIVING ROOM 9 BATH 14 ENTRY 1 IT 4 LINEN 16 BEDROOM 2 UNIT 08 MASTER BATH 11 MECH. 3 UNIT 07 CL 2 UNIT 03 CLOSET 7 LINEN 8 BEDROOM 6 UNIT 06 LINEN 4 HALL 6 I.T. 16 CL 9 ENTRY 1 LAUNDRY 5 LAUNDRY 3 PANTRY 14 KITCHEN 6 MASTER BEDROOM 8 MASTER BEDROOM 9 BEDROOM 5 MASTER BEDROOM 8 BEDROOM 4 MASTER BEDROOM 8 MECH. 4 BATHROOM 13 LINEN 6 LAUNDRY 14 MASTER BATHROOM 10 KITCHEN 9 MASTER BATHROOM 5 MASTER BEDROOM 7 CL. 7 MECH. 3 CL. 6 UNIT 02 KITCHEN 11 PANTRY 12 BATHROOM 13 PANTRY 10 POWDER ROOM 21 KITCHEN 13 BATH 15 BATH 9 LAUNDRY 5 MECH. 11 CL 14 CLOSET 10 CL 10 LIVING ROOM 9 LIVING ROOM 8 LIVING ROOM 8 LAUNDRY 12 ENTRY 1 BEDROOM 11 LIVING ROOM 12 MASTER BEDROOM 16 CL 17 MASTER BATHROOM 18 KITCHEN 5 LIVING ROOM 7 BEDROOM 8 CL 9 MASTER BEDROOM 10 MASTER BATHROOM 12 LINEN 19 HALL 10 DEN 4 MASTER BATH 5 LAUNDRY 2 CL. 13 HALL 10 MASTER BATHROOM 6 CL 14 I.T. 4 PANTRY 14 LIVING ROOM 11 PANTRY 12 UNIT 05 ENTRY 1 ENTRY 1 HALL 2 HALL 15 ENTRY 1 LINEN 13 ENTRY 1 LINEN 15 LINEN 15 LINEN 15 CL 10 CLOSET 5 Mtr Rm 4A-3 Exh. XA1 CORRIDOR A STAIR SA1 MECH SHAFT MA1 ELEV EA3 ELEV EA2 TA2-4 C1 PCT1 PCT1 C1 C1 PCT1 C1 PCT1 RF1 RF2 P3 P4 28.2 28.1 28 27.6 27.5 27 26.9 26.5 26.4 26.3 26 25.7 25.4 25.3 25 24.1 24 H H.5 J J.05 J.1 27 26.9 26.5 26.4 26.3 26 25.7 25.4 25.3 25 24.1 24 PROVIDE CROWN MOULDING. SEE DETAIL 3/IA425. CONTINUE STAIR FINISHES TO ROOF. FN9 ALTERNATES FINISH PLAN NOTES ALIGN FINISHES. REFER TO CUSTOM DRAWINGS FOR 6TH AND 7TH FLOOR PENTHOUSES. CUSTOM DRAWINGS TO BE PROVIDED UPON SALE OF PENTHOUSE UNIT. USE FULL TILE DEPTH AT BORDERS IN ELEVATOR LOBBY. 1. ALTERNATES WILL NOT BE ACCEPTED WITHOUT WRITTEN APPROVAL OF DESIGNER. SAMPLES, WHEN APPLICABLE, SHALL BE SUBMITTED FOR REVIEW. FN4 FN5 FN6 FN2 FN1 FN3 REFER TO SHEET IA415 FOR TYPICAL APARTMENT FINISH SCHEDULE. REFER TO SHEET IA415 FOR TYPICAL STANDARD CONDO FINISH SCHEDULE. OWNER OPTIONAL AND CUSTOM SELECTIONS TO BE PROVIDED UPON SALE OF CONDO UNIT. FN7 FN8 SEE ELEVATIONS ON IA428 FOR EXTENT OF WALL TILE. PROVIDE WOOD TRIM AND SILL AT EXTERIOR WINDOWS. SEE DETAIL 5/IA425. FN10 REFER TO 7/IA429 FOR TYPICAL TILE PATTERN. FN11 PROVIDE WOOD TRIM AT EXTERIOR DOOR LOCATIONS. SEE DETAIL 1/IA425. AREA TO BE FINISHED BY TENANT OR BY OTHER. SCALE: 1/8" = 1'-0" 2 LOFT LEVEL FINISH PLAN IA408 SCALE: 1/8" = 1'-0" 1 4TH FL. FINISH PLAN IA408 N AREA A AREA A NOTE: REFER TO SHEET IA415 FOR APARTMENT FINISH SCHEDULE. N NOTE: FOR HATCHED AREAS, REFER TO 2ND-3RD FLOOR A FINISH PLAN.