Loading...
HomeMy WebLinkAboutIA409 2ND-5TH FL. AREA B FINISH PLAN29 CCC.A.ASI.1, 5.20.09 RFI UPDATES, PUBLIC WAYS, ROOF UPDATES 30 BID SET A.500, CCC.A.ASI.2, 5/15/09 PLUMBING FIXTURE DIMENSION UPDATE Project Number: Revisions: Issue Date Drawn By Checked By Architecture / Project Managment: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: Sheet Title: Project: Developer: By: CARMEL CITY CENTER Carmel, Indiana Building A Phase 1 COPYRIGHT & OWNERSHIP OF DOCUMENTS SCALE: NTS PLAN NORTH 28 22 16 H M AREA A AREA C AREA B R KEY PLAN BLDG A PEDCOR DESIGN GROUP 0502.00 IA409 2ND-5TH FL. AREA B FINISH PLAN Friday, May 22, 2009; alldata:MS:DESIGN:PROJECTS:CARMEL CITY CENTER:CCC Drawings:CCC Construction Doc:Building A:A.General:BLDG A INTERIORS:CDs:IBASE.pln BID SET A500 AR MC THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP,LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND UNPUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP,LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP,LLC. © COPYRIGHT 2006, 2007, 2008 JAMES R. STUTZMAN, AIA, CARMEL, INDIANA 01/22/2009 REVIEW SET: 12/04/07 BID SET: 01/22/09 W S6Di VEFIS L.9 M M.5 M.9 N N.1 N.5 P P.1 P.5 Q Q.2 Q.5 R R.1 R.2 R.3 R.5 R.6 S AREA B AREA C AREA A AREA B AREA A AREA B F W F WW F WW F F F L.9 M M.5 M.9 N N.1 N.5 P P.1 P.5 Q Q.2 Q.5 R R.1 R.2 R.3 R.5 R.6 S 7 IA430 1 IA427 FN2 FN7 FN2 FN10 FN5 FN8 FN5 FN5 FN5 FN5 FN5 FN5 FN5 FN5 FN5 FN8 FN10 FN2 FN11 FN7 FN7 FN7 FN7 FN2 FN2 FN2 FN2 FN2 FN2 FN2 FN2 FN11 FN11 FN11 FN11 FN11 FN11 FN11 FN11 FN11 FN11 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 FN7 LIVING ROOM 9 BEDROOM 6 I.T. 16 MASTER BEDROOM 8 HALL 10 CL. 13 PANTRY 12 UNIT 05 TYP. TYP. BEDROOM 5 MASTER BEDROOM 10 HALL 3 MASTER BEDROOM 8 LAUNDRY 15 ENTRY 1 HALLWAY 12 LAUNDRY 6 CL 5 BEDROOM 6 BATHROOM 3 ENTRY 1 UNIT 23 BEDROOM 12 CL 12 CL 15 KITCHEN 4 CL 7 CL 11 MASTER BATH 5 ENTRY 1 LIVING ROOM 9 LINEN 3 MECH 2 LINEN 6 CL 7 LAUNDRY 2 MASTER BEDROOM 9 UNIT 21 UNIT 22 BEDROOM 4 BEDROOM 5 KITCHEN 5 CL 18 ENTRY 1 LINEN 4 CL 8 MASTER BATHROOM 11 CL 6 CL 6 KITCHEN 7 PANTRY 4 CL 4 HALLWAY 3 UNIT 20 UNIT 12 I.T. 13 CLOSET 12 CL 11 LAUNDRY 14 CL 2 UNIT 16 LAUNDRY 12 MECH 13 UNIT 11 MASTER BATH 16 MASTER BEDROOM 14 I.T. 4 HALLWAY 11 LINEN 10 HALLWAY 2 BATH 2 KITCHEN 9 MASTER BEDROOM 7 MASTER BATHROOM 12 BEDROOM 4 MASTER BEDROOM 11 CL 2 BEDROOM 5 BATHROOM 14 PANTRY 9 CL 5 RF1 MASTER BEDROOM 12 LINEN 17 CL 2 BEDROOM 11 CL 13 BATHROOM 6 CL 15 PANTRY 10 MECH 7 CL 14 ENTRY 1 CL 10 LAUNDRY 13 CL 15 ENTRY 1 ENTRY 1 LIVING ROOM 10 LIVING ROOM 8 LIVING ROOM 9 LIVING ROOM 6 LIVING ROOM 8 PANTRY 9 MASTER BATHROOM 12 CL 13 MASTER BATH 9 MASTER BATH 6 ENTRY 1 LIVING ROOM 8 MECH 13 PANTRY 8 LAUNDRY 14 MECH 3 BEDROOM 15 BATH 4 LINEN 5 KITCHEN 8 MASTER BATH 12 BATHROOM 15 MASTER BEDROOM 11 MASTER BEDROOM 8 HALL 3 RF2 B3 B3 RF1 RF2 MECH 14 HALLWAY 7 LINEN 13 KITCHEN 8 C2/C7 PCT3 TYP. TYP. C2/C7 C2/C7 PCT3 TYP. TYP. TYP. TYP. TYP. TYP. TYP. TYP. TYP. TYP. TYP. TYP. TYP. TYP. TYP. TYP. TYP. TYP. C2/C7 PCT3 C2/C7 PCT3 C2/C7 PCT3 C2/C7 PCT3 PCT3 C2/C7 PCT3 C2/C7 C2/C7 C2/C7 PCT3 PCT3 PCT3 PCT3 C2/C7 C2/C7 PCT3 C2/C7 C2/C7 PCT3 C2/C7 PCT3 C2/C7 PCT3 PCT3 C2/C7 PCT3 C2/C7 PCT3 C2/C7 PCT3 MECH 14 BATH 3 CL 2 PANTRY 4 PANTRY 6 MASTER BATH 11 KITCHEN 5 ENTRY 1 KITCHEN 7 LIVING ROOM 6 CL 2 STOR. 3 UNIT 15 CL 13 BEDROOM 14 BEDROOM 14 BEDROOM 18 CL 19 ENTRY 1 CL 14 MASTER BATH 13 UNIT 14 LAUNDRY 4 MECH 5 LIVING ROOM 8 CL 9 MASTER BEDROOM 10 LINEN 16 MECH 15 CL 2 LAUNDRY 16 CL 10 BATH 4 HALLWAY 3 LINEN 11 BEDROOM 9 UNIT 13 PANTRY 8 LIVING ROOM 6 C2/C7 PCT3 C2/C7 CL 7 PANTRY 11 KITCHEN 10 KITCHEN 7 HALL 12 BATHROOM 17 POWDER ROOM 3 MASTER BATH CL 12 11 HALLWAY 9 MASTER BEDROOM 10 LAUNDRY 8 LINEN 13 MECH 7 KITCHEN 7 KITCHEN 9 CL 15 PANTRY 10 BATHROOM 15 LINEN 3 VN1 RF2 VN1 RF2 UNIT 14 HALLWAY 5 UNIT 14 HALLWAY 5 Mtr Rm 2A-1 TA2-2 Corridor D Corridor F TA4-2 Corridor E Exh. XA2 Mtr Rm 2A-2 Corridor G Elevator Lobby XXX Stair SA3 Stair SA2 Elev EA4 Elev EA5 Mech Shaft MA2 C1 C1 WP1 P3 P4 P3 P4 CG2 CG2 TR A2B GENERAL FINISH NOTES 1. CARPET TO CARPET AND/OR CARPET TO HARDSURFACE FLOORING TRANSITIONS TO BE FEATHERED AS REQUIRED OR ARE TO BE EASED USING LATEX TO ACHIEVE A SMOOTH TRANSITION FROM FINISH TO FINISH. G.C. TO SUBMIT SEAMING DIAGRAMS OF ALL CARPET IN PROJECT SCOPE FOR REVIEW AND APPROVAL BY ARCHITECT BEFORE PROCEEDING WITH FLOORING INSTALLATION. 2. 3. 4. ALL NEW WOOD TRIM TO BE PAINTED P5. 11. 12. BASE IN PUBLIC REST ROOMS MUST BE MINIMUM 5" HEIGHT TO MEET BOARD OF HEALTH CODE. G.C. TO PROVIDE VINYL REDUCER STRIP WHERE CARPET AND VINYL TILE TRANSITIONS TAKE PLACE IN COMMON AREAS. COLOR TO MATCH COMMON CORRIDOR BASE B7. GROUT TO BE 100% EPOXY. COLOR TO BE SELECTED BY ARCHITECT. G.C. TO SUBMIT STAINED AND/OR PAINTED SAMPLE OF MILLWORK TO ARCHITECT FOR REVIEW AND APPROVAL BEFORE PROCEEDING WITH MILLWORK FINISHING PROCESS. PAINT ALL EXPOSED METAL SURFACES (i.e.. GRILLS, HEATERS, AND FIRE EXTINGUISHER CABINETS) TO MATCH ADJACENT SURFACE. PAINT NEW PLYWOOD PHONE BOARDS WITH FIRE RETARDANT PAINT. COLOR TO MATCH ADJACENT WALL FINISH. REFERENCE INTERIOR ELEVATIONS, WHERE PROVIDED, FOR ADDITIONAL FINISH INFORMATION. 5. 6. 7. 8. 9. 10. 13. G.C. TO PROVIDE ZINC OR BRASS TRANSITION STRIP WHERE CARPET AND TILE FINISHES MEET IN COMMON AREAS. SEE ENLARGED PLANS ON IA427 FOR FINISH. ALL NEW DOORS TO BE PAINTED P5. ALL INSIDE OF BALCONY DOORS TO BE PAINTED P5 TO MATCH INTERIOR DOORS. ALL NEW DOOR FRAMES TO BE PAINTED P5. BLINDS ARE TO BE PROVIDED AT ALL PERIMETER WINDOW LOCATIONS, 2ND-5TH FLOOR APARTMENTS AND CONDOS. 14. 15. 16. 17. REFER TO 12/IA426 FOR TYPICAL APARTMENT AND STANDARD CONDO BATHROOM FLOOR PATTERN. REFER TO SHEET IA415 FOR GENERAL FINISH SCHEDULE. ALL DRYWALL BULKHEADS ARE TO BE PAINTED P2, UNLESS NOTED OTHERWISE ON REFLECTED CEILING PLANS. 18. ALL CORRIDOR DOORS AND DOOR FRAMES TO BE PAINTED P7. PROVIDE CROWN MOULDING. SEE DETAIL 3/IA425. CONTINUE STAIR FINISHES TO ROOF. FN9 ALTERNATES FINISH PLAN NOTES ALIGN FINISHES. REFER TO CUSTOM DRAWINGS FOR 6TH AND 7TH FLOOR PENTHOUSES. CUSTOM DRAWINGS TO BE PROVIDED UPON SALE OF PENTHOUSE UNIT. USE FULL TILE DEPTH AT BORDERS IN ELEVATOR LOBBY. 1. ALTERNATES WILL NOT BE ACCEPTED WITHOUT WRITTEN APPROVAL OF DESIGNER. SAMPLES, WHEN APPLICABLE, SHALL BE SUBMITTED FOR REVIEW. FN4 FN5 FN6 FN2 FN1 FN3 REFER TO SHEET IA415 FOR TYPICAL APARTMENT FINISH SCHEDULE. REFER TO SHEET IA415 FOR TYPICAL STANDARD CONDO FINISH SCHEDULE. OWNER OPTIONAL AND CUSTOM SELECTIONS TO BE PROVIDED UPON SALE OF CONDO UNIT. FN7 FN8 SEE ELEVATIONS ON IA428 FOR EXTENT OF WALL TILE. PROVIDE WOOD TRIM AND SILL AT EXTERIOR WINDOWS. SEE DETAIL 5/IA425. FN10 REFER TO 7/IA429 FOR TYPICAL TILE PATTERN. INSTALL CORNER SHELF ACCESSORY IN BATHROOMS AS FOLLOWS: CONDO SHOWERS (2) CS1-INSTALL AT 4' TO TOP AND 5'-3" TO TOP W/ LIP SIDE UP. CONDO TUBS (2) CS1-INSTALL AT 2'-6" TO TOP AND 4' TO TOP W/ LIP SIDE UP. APT. SHOWERS (1) CS2-INSTALL AT 4' TO TOP W/ SOAP DISH SIDE DOWN. APT. TUBS (1) CS2-INSTALL AT 2'-6" TO TOP W/ SOAP DISH SIDE DOWN. 19. INSTALL WALL PROTECTION PANELS VERTICALLY IN TRASH DISPOSAL ROOMS; AVOID SEAMS AT TRASH CHUTE OPENING. PAINT EXPOSED DRYWALL TO MATCH CEILING UNLESS OTHERWISE NOTED. PROVIDE SEAMING DIAGRAM TO ARCHITECT PRIOR TO INSTALLATION. FN11 PROVIDE WOOD TRIM AT EXTERIOR DOOR LOCATIONS. SEE DETAIL 1/IA425. AREA TO BE FINISHED BY TENANT OR BY OTHER. 20. USE JOHNSONITE COVE FILLER STRIP CFS-OO-A ON STAIRS WHEN INSTALLING ONE-PIECE TREAD/ RISER AS DIRECTED BY MANUFACTURER. 21. G.C. TO PROVIDE Z-BAR WHERE CARPET AND VINYL SHEET AND CARPET AND TILE TRANSITIONS TAKE PLACE IN APARTMENTS AND CONDOS. 22. REFER TO 11/IA430 FOR TYPICAL APARTMENT AND STANDARD CONDO KITCHEN FLOOR PATTERN. 23. FLOOR COVERING CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF TOP LAYER OF SOUND ISOLATION SYSTEM. SEE 3/IA426 FOR DETAILS. 24. A CAULKED JOINT IS TO BE PROVIDED AT TRANSITION OF FLOOR TILE TO WALL TILE. SEE 10/IA426 FOR DETAILS. 28 27.6 27 26 25 24 23 22 23.6 26.4 26.5 24.1 23.1 21.9 28.2 28.1 25.7 25.4 26.9 26.3 27.5 25.3 28 27.6 27 26 25 24 23 22 23.6 26.4 26.5 24.1 23.1 21.9 28.2 28.1 25.7 25.4 26.9 26.3 27.5 25.3 28 27.6 27 26 25 24 23 22 23.6 26.4 26.5 24.1 23.1 21.9 28.2 28.1 25.7 25.4 26.9 26.3 27.5 25.3 SCALE: 1/8" = 1'-0" 1 2ND-5TH FL. FINISH PLAN IA409 N NOTE: REFER TO SHEET IA415 FOR CONDO FINISH SCHEDULE. AREA B