HomeMy WebLinkAboutM2-2 - Mechanical HVAC Roof Plan.pdf
A D F H 23 I J K L 578 10 11 X B E G 46 Y 9 EF-1 CU-1 RTU-1 RTU-2 RTU-5 RTU-6 RTU-3 RTU-7 RTU-4 RTU-8 1"ø GAS UP FROM 1ST 3/4"ø CW UP FROM 1ST SC-1 4"øVTR GR-1 GR-2 GR-3 1"ø G G G G
1"ø 1"ø 3/4"ø 3/4"ø 1"ø 1 1 11 111 2 1 4 5 3 3 35 MICHAEL D. NICHT I ENGINEER REGISTERED 890360 STATE OF I I ND A AN No. PROFESSONAL ER * * COMMISSION NUMBER DATE SHEET NUMBER SHEET
TITLE The concepts, ideas, designs, plans, and details as shown on this document are the sole property of MSKTD & Associates, Inc., and were created, developed and presented for use
on this specific project. None of the concepts, ideas, designs, plans, and details shall be used by any person, firm, or corporation for any purpose whatsoever, without the expressed
written consent of MSKTD & Associates, Inc. The Owner shall be permitted to retain copies for information and reference in connection with this project. 1715 MAGNAVOX WAY FORT WAYNE,
IN 46804 voice 260.432.9337 fax 260.436.2402 930 NORTH MERIDIAN INDIANAPOLIS, IN 46204 voice 317.917.1190 fax 317.822.6236 http://www.msktd.com ARCHITECTURE ENGINEERING INTERIOR DESIGN
CERTIFICATION MSKTD 5629 BUILD 65076 CONSTRUCTION SET 3-21-11 3/18/2011 4:47:38 PM 100 W 96th St Indianapolis, Indiana 46290 M2.2 2-11-11 Indianapolis North Mechanical HVAC Roof Plan
Lake City Bank 1/8" = 1'-0" Mechanical Roof HVAC Plan M2.2 CONSTRUCTION NOTES 1 FURNISH AND INSTALL GAS PRESSURE REGULATORS AT EACH UNIT. 2 CONDENSATE SHALL DRAIN TO ROOF. SEE CONDENSATE
TRAP DETAIL SHEET P5.1. 3 PAINT GAS PIPING ON ROOF WITH TWO COATS OF BLACK RUSTOLEUM PAINT. SUPPORT GAS PIPING ON 4' CENTERS WITH PIPE SUPPORT, SEE DETAIL SHEET P5.1. 4 SET CONDENSING
UNIT ON EQUIPMENT CURB (PATE, MODEL ES-5). ROUTE REFRIGERANT LINES, SIZE AND SLOPE PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS. 5 USE PATE "PIPE SEAL" AT ROOF PENETRATION. SEE
DETAIL SHEET P5.1. Revisions: Date: By: