HomeMy WebLinkAboutHIS Constructors/CO1 Final/decrease 15,049.66/Mitchner Ditch Bridge i CITY OF CARMEL i I TO: HIS Constructors, LLC CONTRACT CHANGE ORDER NO.: 1 (Final) 5150 East 65 Street, Suite B DATE: January 23, 2012 Indianapolis, Indiana 46220 PROJECT NAME: Hamilton Co. Bridge No. 289 CITY REQ. NO.: CITY PO NO.: CITY PO DATE: I. You are directed to make the following changes in this Contract: (Brief Description) ITEM AMOUNT OR DAYS 40 fit, n See attached sheet ilak- II. The following referenced Documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order 154,800.00 Contract Price will be decreased by this Change Order 15,049.66 New Contract Price including this Change Order 139,750.34 Contract Time Prior to this Change Order Days Completion Date Net increased /decreased resulting from this Change Order Days Current Contract Time including this Change Order Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended Accepted: Dan Greskamp HIS Cans -J ors, Inc ENGINEER CONTRACTOR f es inard, f yor i One Civic Square 5150 E (0) Sfi., Sal-le-5 i Address Address k n Eld: e, Member Carmel Indiana 1rd'vo.nar301vi iN L- Ikoa 4 City /State /Zip City /State /Zip Lori A.. son, Member By: B A" EST: �?/7 �r �Gli� BA RUcl (pr Name) (pri na ,e) (signature) (sign. re) I" i Phone: 5/7 -7/4 363 8 Phone: (3)i a8L- 1 iana Cordray, Ierk- Treasurer Date: 6 -t2 Date: i l a3b a Date: 0 2- /5 47/ Michael T. cBride I City Engineer Date: /CM. ZdiZ- i CHANGE ORDER #1 (Final) Westwood Drive over Mitchner Ditch Project No. 1 1 -08 Hamilton Co. Bridge No. 289 Item No. 4 Temporary In-Stream Silt Basin The silt basin was not constructed as shown on the plans. (Underrun) Item No. 6 Excavation, Waterway No waterway excavation was done because existing riprap remained in place. (Underrun) Item No. 8 Temporary Silt Fence Temporary silt fence was not used. (Underrun) Item No. 9 Aggregate for End Bent Backfill Additional aggregate was used due to over excavation for piles at the end bents. (Overrun) Item No. 10 Compacted Aggregate, 53, Base The thickness of the #53 base was greater than was shown on the plans. (Overrun) Item No. 11 HMA Surface, Type A The thickness of the HMA surface was less than was shown on the plans. (Underrun) Item No. 12 HMA Binder, Type A The thickness of the HMA binder was greater than was shown on the plans. (Overrun) Item No. 13 HMA Base, Type A The thickness of the HMA base was less than was shown on the plans. (Underrun) Item No. 18 Geotextile Less geotextile was used because no geotextile was placed under the existing riprap at the end bents. (Underrun) Item No. 19 Riprap, Class 1, 24 Inch Depth Less riprap was required because the existing riprap was used. (Underrun) Item No. 20 Seed Mixture, R More seed was used because a greater area was disturbed in the wooded area at the southeast corner of the bridge. More of the erosion control blanket was used to provide erosion control protection. (Overrun) Item No. 21 Fertilizer Less fertilizer was used than was shown on the plans. More erosion control blanket was used to provide erosion control protection, (Underrun) Item No. 22 Mulched Seeding, Type T, Undistributed No Mulched seeding was used. More erosion control blanket was used to provide erosion control protection, (Underrun) Item No. 23 Temporary Erosion Control Blanket More seed was used because a greater area was disturbed in the wooded area at the southeast corner of the bridge. More of the erosion control blanket was used to provide erosion control protection. (Overrun) Item No. 24 Mobilization Demobilization for Seeding All seeding operations were performed at one time. An additional mobilization was not required. (Underrun) Item No. 25 End Bent Drain Pipe, 6 Inch Diameter Less pipe was required that was shown on the plans because of the changed slope of the spill cones at the end bents. (Underrun) Item No. 26 Less saw cutting was required that was shown on the plans. (Underrun) Item No. 27 Piling, Steel "H" Piles, HP 12x53 Less piling was required because the end bents were redesigned to eliminate a conflict with a 30" water line. One pile was eliminated at each end bent. (Underrun) Item No. 28 Epoxy Coated Reinforcing Steel More epoxy steel was required because the end bents were redesigned to eliminate a conflict with a 30" water line. (Overrun) Item No. 33 Field Tile, Undistributed No field tile was encountered during construction. Underrun) EWA 1 Was for the use of a trench box during pile driving operations at the end bents. The box was never used. (EWA 1 Void) EWA 2 GPR Utility Locating (Water Main) Underground radar was used to locate the existing 30 inch water main as directed by the City. (Overrun) EWA 3 Existing End Bent Riprap The existing riprap was reshaped around the new end bents and additional riprap was used to fill in low areas in the slopes. (Overrun) EWA 4 Anchor Bolts Anchor bolts were not provided with the beams. These anchor bolts were to be provide to HIS by the City. (Overrun) EWA 5 Cut and Treat Timber Rail Cutting and treating the timber paving strip on the bridge deck was required to allow the placement of the HMA surface. (Overrun) CITY OF CARMEL PROJECT NO.11 -08 WESTWOOD DR. OVER MITCHNER DITCH HAMILTON CO. BBRIDGE #289 ITEM DESCRIPTION UNITS UNIT ORIGINAL ESTIMATE FINAL ESTIMATE OVERRUNS UNERRUNS NO. PRICE QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 Construction Engineering LSUM 2,400.00 1.00 2,400.00 1.00 2,400.00 2 Mobilization Demobilization LSUM 7,800.00 1.00 7,800.00 1.00 7,800.00 3 Clearing Right of Way LSUM 5,718.20 1.00 5,718.20 1.00 5,718.20 4 Temporary In- stream Silt Basin LSUM 1,000.00 1.00 1,000.00 0.00 0.00 1.00 1,000.00 5 Excavation, Common CYS 55.00 138.00 7,590.00 138.00 7,590.00 6 Excavation, Waterway CYS 45.00 25.00 1,125.00 0.00 0.00 25.00 1,125.00 7 Excavation, Foundation, Unclassifed CYS 35.00 52.00 1,820.00 52.00 1,820.00 8 Temporary Silt Fence, Undistributed LFT 2.75 300.00 825.00 0.00 0.00 300.00 825.00 9 Aggregate for End Bent Backfill CYS 70.00 22.60 1,582.00 25.09 1,756.30 2.49 174.30 10 Compacted Aggregate, 53, Base TON 30.00 168.00 5,040.00 181.71 5,451.30 13.71 411.30 11 HMA Surface, Type A TON 119.00 42.00 4,998.00 32.10 3,819.90 9.90 1,178.10 12 HMA Intermediate, Type A TON 106.00 57.00 6,042.00 59.61 6,318.66 2.61 276.66 13 HMA Base, TypeA TON 88.00 70.00 6,160.00 65.96 5,804.48 4.04 355.52 14 Benchmark TON 500.00 1.00 500.00 1.00 500.00 15 Buried Timber GR End Section, Install Only EACH 1,300.00 4.00 5,200.00 4.00 5,200.00 16 Timber Guardrail, Install Only LFT 41.00 96.00 3,936.00 96.00 3,936.00 17 Timber Bridge Rail, Install Only LFT 48.00 84.00 4,032.00 84.00 4,032.00 18 Geotextile SYS 2.50 390.00 975.00 72.00 180.00 318.00 795.00 19 Riprap, Class I, 24 Inch Depth TON 35.00 263.00 9,205.00 21.02 735.70 241.98 8,469.30 20 Seed Mixture, R LBS 47.00 8.00 376.00 42.50 1,997.50 34.50 1,621.50 21 Fertilizer TON 2,100.00 0.10 210.00 0.05 105.00 0.05 105.00 22 Mulched Seeding, Type T, Undistributed SYS 3.00 212.00 636.00 0.00 0.00 212.00 636.00 23 Temporary Erosion Control Blanket SYS 4.00 212.00 848.00 800.00 3,200.00 588.00 2,352.00 24 Mobilization Demobilization for Seeding EACH 265.00 2.00 530.00 1.00 265.00 1.00 265.00 25 End Bent Drain Pipe, 6 inch Diameter LFT 13.00 80.00 1,040.00 75.00 975.00 5.00 65.00 26 Saw Cut Joint LFT 13.00 49.00 637.00 40.00 520.00 9.00 117.00 27 Piling, Steel "H" Piles, HP 12x53 LFT 65.00 520.00 33,800.00 312.00 20,280.00 208.00 13,520.00 28 Epoxy Coated Reinforcing Steel LBS 1.20 3,434.00 4,120.80 4,140.00 4,968.00 706.00 847.20 29 Concrete, A, Substructure LFT 950.00 21.20 20,140.00 21.20 20,140.00 30 Structural Membrane Waterproofng LFT 30.00 150.00 4,500.00 150.00 4,500.00 31 WS 17 "x 4' -0 Conc. Box Beam, Install Only LFT 7.00 924.00 6,468.00 924.00 6,468.00 32 Surface Seal LFT 1,150.00 1.00 1,150.00 1.00 1,150.00 33 Field Tie, Undistrubuted EACH 15.00 20.00 300.00 0.00 0.00 20.00 300.00 34 Construction Sign, Type A EACH 130.00 8.00 1,040.00 8.00 1,040.00 35 Construction Sign, Type B EACH 70.00 2.00 140.00 2.00 140.00 36 Standard Barricade, Type IIIA LFT 13.00 48.00 624.00 48.00 624.00 37 Standard Barricade, Type IIIB LFT 14.00 48.00 672.00 48.00 672.00 Page 1 of 2 38 Detour Route Marker Assembly EACH 140.00 7.00 980.00 7.00 980.00 39 Road Closure Sign Assembly EACH 160.00 4.00 640.00 4.00 640.00 EWA2 GPR Utility Locating (Water Main) LSUM 880.00 1.00 880.00 1.00 880.00 EWA3 Existing End Bent Riprap LSUM 5,676.58 1.00 5,676.58 1.00 5,676.58 EWA4 Anchor Bolts EACH 24.95 27.00 673.65 27.00 673.65 EWA5 Cut Treat Timber Rail LSUM 793.07 1.00 793.07 1.00 793.07 TOTALS 154,800.00 139,750.34 13,706.26 28,755.92 15,049.66 15,049.66 Page 2 of 2