HomeMy WebLinkAboutCorrespondenceCITY OF
CARMEL
DEPARTMENT OF COMMUNITY SERVICES
Division of Planning & Zoning
TRANSMITTAI
Date: May 7, 2004
To: Kelli Lawrence
fax: (317) 577-5633
From: Adrienne Keeling /~/~
Planning & ZoningAdhti~istrator
Department of Community Services
One Civic Square
Carmel, IN 46032
Re:
Steckley Rezone, Docket No. 04010024 Z (Guilford Reserve)
ph. 317.571.2417
fax. 317.571.2426
I The material you requested
[21 For review and comment
[21 For your information
[21 For approvhl
Kelli,
This is pretty small, but the best I could do on letter size. Let me know if you have any
more questions.
Adrienne Keeling
E- GUILFORD ROAD
,,/./.- ....
,..,.
i/2. sw i/_,~4 sic 24. T 18 N. R :3 E:
~m* Ooeeoom ,
\
\
/
/ /
/
/
'!
!
llq'~g2
,O0'*gC~ - 3 ./.L,~L.O0 s
CERTIFICATION OF THE CARMEL/CLAY
PLAN COMMISSION'S RECOMMENDATION
ON THE PETITION OF CRAWFORD DEVELOPMENT, LLC
TO REZONE A PROPERTY GENERALLY LOCATED ON THE EAST SIDE OF
GUILFORD ROAD, BETWEEN 116~a STREET AND CARMEL DRIVE
PURSUANT TO INDIANA CODE 36-7-4-605
ORDINANCE No. Z-448-04
To:
The Honorable Common Council
of the City of Carmel
Hamilton County, Indiana
D ear Memb ers'
The Carmel/Clay Plan Commission offers you the following report on the application (Docket No.
040010024 Z) of Crawford Development, LLC petitioning the Comrrdssion for a favorable recommendation
to rezone a property generally located on the east side of Guilford Rd, between 116th St and Carmel Dr from
the B-6/Business District designation to the PUD/Planned Unit Development Zoning designation:
The Carmel/Clay Plan Commission's recommendation on the petition of the applicant is "FAVORABLE."
At its regularly scheduled meeting on April 20, 2004, the Carmel/Clay Plan Commission voted ten (10) in
Favor, zero (0) Opposed, zero (0) Abstaining, to forward to the Common Council the proposed Ordinance
No. Z-448-04 with a Favorable Recommendation, subject to a recorded commitment.
Please be advised that by virtue of the Plan Commission's Favorable Recommendation, pursuant to IC 36-7-
4-608(f)(4), the Council has ninety (90) days to act on this petition before it becomes effective as Certified
by the Commission. Ninety days from the date of this Certification (April 23, 2004) is Thursday, July 22,
2004.
~ ona Hancock, Secretary
C~rmel Plan Commission
Dated: April 23, 2004
2004-0423; Z-448-04; Guilford Reserve Rezone Certification
CARMEL~PLAN COMMISSION
i~eo~Die'~kmar~
.
APR 2 3 2004
Clerk. Treasm.e~
...
&
FRANKENBERGER
A PROFESSIONAL CORPORATION
ATTORNEYS-AT-LAW
April 21, 2004
JAMES J. NELSON
CHARLES D. FRANKENBERGER
JAMES E. SHINAVER
LAWRENCE J. KEMPER
JOHN B. FLATT
FREDRIC LAWRENCE
of counsel
JANE B. MERRILL
Jon C. Dobosiewicz
Department of Community Services
One Civic Square
Carmel, IN 46032
Crawford Development, LLC - Docket No. 04010024Z
Guilford Reserve PUD
Re:
3105 EnST 98TH STRE~-~r
SUITE 170
INDIANAPOLIS, INmt, nt, 46280
317-844-0106
FAX: 317-846-8782
Dear Jon:
Regarding three outstanding matters, please note the following:
Fence and Water Line Agreement- Enclosed is a copy of the agreement, with Mr. Johnson, to install a
fence and water line. Please let me know whether you suggest anything further.
.
o
Landbanking of Parking- As you know, the PUD was revised to provide for the landbanking of
parking. Please let me know if you suggest anything further.
Commitments- I have determined that the commitments made in connection with the existing zoning
were never recorded. I still think it would be helpful, however, to obtain a certification, from the
Department, that the commitments made in connection with the existing zoning are ineffective by
reason of the subsequent rezone. Please give me your thoughts.
As always, we appreciate your help. Your suggestions regarding the site layout, landscaping, and
architectural enhancements were particularly helpful - they make the project better for everyone.
Please advise. Thank you.
Very truly yours,
NELSON & FRANKENBERGER
CDF/jlw
Enclosure
H:XJanet~lainkDobosiewicz ltr 042104.doc
Charles D. Frankenberger
AGREEMENT TO INSTALL FENCE AND WATER LINE
THIS AGREEMENT (the "Agreement") is made and entered into by and between
Crawford Development, LLC, an Indiana limited liability company ("Crawford") and William R.
Johnson ("Johnson"), and is signed on the dates indicated below,
WITNESSETH'
WHEREAS, Crawford is the contract purchaser of the real estate described in what is
attached hereto and incorporated herein by reference as Exhibit "A" ("Parcel 1");
WHEREAS, Crawford has filed an application, with the Carmel-Clay Plan Commission,
to change the zoning of Parcel 1, which application is pending under Docket Number 04-01-
0024Z;
WHEREAS, Johnson and his wife are the owners of the real estate described in what is
attached hereto and incorporated herein by reference as Exhibit "B" ("Parcel 2");
WHEREAS, Johnson's residence (the "Residence") is located on Parcel 2, and the water
to the Residence is serviced by a well (the "Well") located upon Parcel 2;
WHEREAS, on the terms and conditions which follow, Crawford has agreed (i) to install
a fence at or near the boundary line separating Parcel 1 and Parcel. 2 and (ii) install a water line
from Parcel 1 and connecting to the Residence.
NOW, THEREFORE, in consideration of the foregoing preambles and recitations, it is
acknowledged and agreed as follows:
1. Upon the cleating and grubbing of Parcel 1, Crawford shall cause to be installed a
three board split rail fence without mesh, an illustration of which is attached hereto and
incorporated herein by reference as Exhibit "C" (the "Fence"), in the location specified on the
drawing attached hereto and incorporated herein by reference as Exhibit "D". The highest of the
three (3) horizontal rails of the Fence shall be approximately four (4) feet above grade;
2. Installation of Water Line. When on-site water mains and laterals are installed
upon Parcel 1, Crawford shall cause to be extended a water line, north from Parcel 1 to Parcel 2,
and connecting to the Residence at a point adjacent to the Well. Regarding the installation of
such water line, the parties further agree as follows'
(a) Crawford shall pay the availability and connection fees assessed in order
to make water available to the Residence on;
(b) Within seven (7) days after payment of such water availability and
connection fees, Johnson shall pay to Crawford the sum of One Thousand Dollars
($1,000.00);
(c) Crawford, at its expense, shall (i) mn the water line north from Parcel 1
and across Parcel 2 to the Residence and (ii) actually connect the water line to the
Residence turnkey, at a place adjacent to the Well, at .a time prior to the obtaining of the
first certificate of occupancy for the first townhome residence located on Parcel 1; and
(d) Any subsequent abandoning and capping of the Well shall be the
Johnsons' obligation and expense.
3. Effective Date. This Agreement, and the obligations of the parties under this
Agreement, shall not be effective until the occurrence of all of the following, and shall be null
and void absent the occurrence of all of the following:
(a)
The acquisition by Crawford of Parcel 1;
(b) The enactment of a PUD Ordinance rezoning the real estate as requested
under Docket No. 04-01-0024Z; and
(c) The commencement of development of the real estate by Crawford or its
successor or assign.
CRAWFORD DEVELOPMENT, LLC
By:
'/'"David Klain, Member
Date:
William R. jOhnson
ate.
H:Uanet\Klain\Fence-Water Line GR.doc
EXHIBIT "A"
Begin at a point 66.0 feet west and 475.0 feet south of the Northwest comer of
the East Half of the Southwest Quarter of Section 36, Township 18 North,
Range 3 East, thence east 727 feet to an iron stake in the fence, said point being
475.9 feet south of the North line of said Southwest Quarter, thence south on
and along a fence line 302.0 feet to an iron stake, thence westerly 729.4 feet to a
point, with the intersection of a line 66.0 feet west of the west line of said East
Half, thence northerly on and along said line 296.4 feet to place of beginning.
Containing 5.0 acres more or less including the center of the Road.
EXHIBIT "B"
Part of the southwest Quarter of Section 36, Township 18 North, Range 3 East
in Hamilton County, Indiana, described as follows'
Beginning at the Northeast comer of the West Half of the Southwest quarter of
Section 36, Township 18 north, Range 3 East; thence South 89 degrees '15
minutes 52 seconds West (assumed beating) on and along the North line thereof
66.23 feet to its intersection with the prolongation North of the centerline of
College Avenue; thence South 00 degrees 00 minutes 00 seconds on and along
said centerline 125.00 feet to the Tree Beginning Point of this description;
thence South 00 degrees 00 minutes 00 seconds on and along said centerline
350.00 feet; thence North 89 degrees 15 minutes 52 seconds East parallel with
the North line of said Southwest Quarter 494.63 feet to the approximate
centerline of Carmel Creek; thence North 04 degrees 17 minutes 28 seconds
West 188.24 feet to a point in said centerline; thence North 61 degrees 18
minutes 57 seconds West 139.34 feet to a point in said centerline; thence North
43 degrees 47 minutes 32 seconds West 93.52 feet to a point in said centerline;
thence North 85 degrees 47 minutes 46 seconds West 294.34 feet to the
Beginning Point.
Children and Pets
TOln Gl ddc, l'~
Gliddel~ l':ell(,;(~ C(').,Ii'~(':.
over 25 ,vear~ ag().
TOl'~"~ al'~cl his '-'~ /~
over 55 years experi ~1' "'-
in fenice COl'/StrLIctJOl/
in Ce[~tral l~dial~a.
I)ic'k(,t
l)(~lilils
l)~:lll('J·
l)(:taJl.~
I:r('tl('ll
I x4 ()~ly
l:llii(:k \/il 1vi
(';l'lail ~ Li[ fk
l?)r()wl ~ ViIlv'I
C,I lait'l l,in 'k
Dog Ear
Mill TgP
OPTIONS
French Gothic
4x4 only
ii
S('ail()l) (:r()w,!
Bradford
Cl'()~,Vll
ii
G()II lk.'. 45° Allglc'
! X4 ()lily I X4 ¢)111y
I '
Dog Ear
i ii
* Not available witll Decor Panels
Split Rail ..~Wi~im vinyl Rail
will'~
Available in heigl'/ts l-(') st~il' your needs, these fences are a prac:tical solL~tior~ to a host of
~ - ·
residerit~al problen"~s. Bott~ all'ractive and
c.c.)[](.)r~]lc..ai, a Glidden Fence will add quality to
your standard of liviJlg.
. .
:.:: -,~ ., .
k~'' !:"'
, i:'i!:::: i:~:.-.i.:--"::i. .~....:.
l~ I1.~ s oo~o'3~' E - ~.40' GUILFORD ROAD
.
,OO"~O~ - 3 ,,/.I.,~kO0 S
BROWNSTONE HOMES '"'
al: CP, tWORD DE~P~, LLC KgELER-I~EBB .aSSOCIATES
, , , , , ,, ,,
FRANKENBERGER
A PROFESSIONAL CORPORATION
ATTORNEYS-AT-LAW
JAMES J. NELSON
CHARLES D. FRANKENBERGER
JAMES E. SHINAVER
LAWRENCE J. KEMPER
JOHN B. FLATT
JANE B. MERRILL
3105 EAST 98TX STREET
SUITE 170
INDIANAPOLIS, INDIANA 46280
317-844-0106
FAX: 317-846-8782
VIA HAND DELIVERY
April 9, 2004
Jon C. Dobosiewicz
Carmel Department of Community Services
One Civic Square
Carmel IN 46032
Re'
Dear Jon:
Crawford Development, LLC
Docket No. 04-01-0024Z
Enclosed are 20 informational brochures to be distributed to the Plan Commission for the
hearing scheduled to be held on April 20, 2004.
Should you have any questions or comments, please call. As you know, I appreciate your
help.
Very truly yours,
NELSON & FRANKENBERGER
Lawren~p' er
LJK/jlw
Enclosures
H:~Janet\Klain\Dobosiewicz brochure ltr 040904.doc
JAMES BRAINARD, MAYOR
March 29, 2004
Adam DeHart, LS
486 Gradle Dr.
Carmel, IN 46032
RE: Brownstone Homes
Dear Mr. DeHart,
After review of the revised plans for the Guilford Reserve, the fire department has no other
outstanding concerns with this project.
If you have any further questions or concerns, please call our office.
Res/pectfully,
~rve M a r"~s~a i~
ention Bureau
Cc:
Assistant Chief Jace Platt, Carmel Fire Department
Jon Dobosiewicz, Department of Community Development
file: (2)
CARMEL FIRE DEPARTMENT HEADQUARTERS
TWO CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2600, Fax 317.571.2615
JAMES J. NELSON
CHARLES D. FRANKENBERGER
JAMES E. SHINAVER
LAWRENCE J. KEMPER
JOHN B. FLATT
FREDRIC LAWRENCE
of counsel
JANE B. MERRILL
NELSON
&
FRANKENBERGER
A PROFESSIONAL CORPORATION
ATTORNEYS-AT-LAW
March 5, 2004
VIA HAND DELIVERY
Jon C. Dobosiewicz
Carmel Department of Community Services
One Civic Square
Carmel IN 46032
3105 EAST 98TH STREET
SUITE 170
INDIANAPOLIS, INmANA 46280
317-844-0106
FAX: 317-846-8782
Crawford Development, LLC
Docket No. 04-01-0024Z
Dear Jon:
Enclosed are 15 informational brochures to be distributed to the Plan Commission for the
hearing scheduled to be held on March 16, 2004. Also enClosed is a check in the amount of
$1,750.00 for the filing fee.
help.
Should you have any questions or comments, please call. As you know, I appreciate your
Very truly yours,
NELSON & FRANKENBERGER
Charles D. Frankenberger
CDF/jlw
Enclosures
H:XJanet~KlainXDobosiewicz brochure ltr 030504.doc
JAMES J. NELSON
CHARLES D. FRANKENBERGER
JAMES E. SHINAVER
LAWRENCE J. KEMPER
JOHN B. FLATT
FREDRIC LAWRENCE
of counsel
JANE B. MERRILL
NELSON
&
FRANKENBERGER
A PROFESSIONAL CORPORATION
ATTORNEYS-AT-LAW
March 5, 2004
VIA HAND DELIVERY
Jon C. Dobosiewicz
Department of Community Services
One Civic Square
Carmel, IN 46032
Re~
Crawford Development, LLC
Docket No. 04-01-0024Z
3105 EAST 98T}! STREET
SUITE 170
INDIANAPOLIS, INDIANA 46280
317-844-0106
FAX: 317-846-8782
Dear Jon:
Please find enclosed the following for the above-referenced matter:
o
2.
3.
4.
5.
Notice of Public Heating;
Affidavit of Mailing with list of owners attached as Exhibit "A";
Proof of Publication;
List from Hamilton County Auditor regarding surrounding property owners; and
Certified, return receipt requested cards which were returned by the surrounding property
owners.
The above-referenced docket matter is to be presented to the Carmel Plan Commission on
Tuesday, March 16, 2004.
Should you have any questions, please contact me.
Very truly yours,
NELSON & FRANKENBERGER
CDF/jlw
Enclosures
H:XJanetXaKlain\Dobosiewicz-pub ltr 030504.doc
Charles D. Frankenberger
KEELER-WEBB ASSOCIATES
Consulting Engineers-Planners- ~urveyors
486 Gradle Drive
Carmel, Indiana 46032
(317) 574-0140
TO
CITY OF CARMEL DEPARTMENT
OF COMMUNITY SERVICES
ONE CIVIC SQUARE
CARMEL, IN 46032
LETTER OF TRANSMITTAL
DATE JOB NO.
2/27/2004 o40~.o02
Al IENTION
JOHN DOBOSIEWlCZ
~~:~:~'~'$ 0~UTH"'" G U I L FO RD ROAD
I CA"MEL, IN
WE ARE SENDING YOU
J-'l Shop drawings
r--] copy of letter
COPIES
DATE
2/26/04
[~ Attached r-] Under separate cover via
J~ Prints [~ Plans J'-J Samples
r-] Change order J-']
DELIVERY
___the following items'
J-'J Specifications
SET
DESCRIPTION
DEVELOPMENT & LANDSCAPING PLANS
R£CFIVE
FB 21
THESE ARE TRANSMITTED as checked below:
For approval
For your use
J~ As requested
For review and comment
r-] FOR BIDS DUE
REMARKS
J'-J Approved as submitted
r-'J Approved as noted
Returned for corrections
D ,,,
J-'] Resubmit
I"-! Submit
copies for approval
copies for distribution
J-'J Return corrected prints
r-] PRINTS RETURNED AFTER LOAN TO US
THE ATTACHED UPDATED CONSTRUCTION DOUMENTS REFLECT THE T.A.C. COMMENTS AND REQUESTED
REVISIONS TO THE PLAN IS OUR FEBRUARY 20 MEETING.
COPY TO
SIGNED:
If enclosures are not as noted, kindly notify us at once.
ADAM DeHART~ LS
NATURAL RESOURCES
PLAN REVIEW AND COMMENT
Hamilton County Soil and Water Conservation District
1108 South 9th Street, Noblesville IN 46060
Ph- 317-773-1432 or Email at john-south~iaswcd.org
Project Name- Guilford Reserve Rezone Petition
Location-
Sec. 36 T- 18 N R-3E
Acreage- 5.0 Ac
Owner/Developer-
Crawford Development LLC
1386 Clay Spring Drive
Carmel, In 46032
Engineer-
Adam DeHart
Keeler- Webb Associates
486 Gradle Drive
Carmel, 1N 46032
'Plan Review Date:
February 14, 2004
Soils Information:
Br Brookston silty clay loam
This is a poorly drained soil with a seasonal high water table at 0.0 to 1.0 ft. This soil is located
on depressions and is subject to ponding; slopes are 0 to 2 percent. The native vegetation is
water tolerant grasses and hardwood trees. The surface layer is silty clay loam and has moderate
to high organic matter content (2.0 to 6.0 percent). Permeability is moderately slow (0.2 to 0.6
in/hr) in the most restrictive layer above 60 inches. Available water capacity is high (10.0 inches
in the upper 60 inches). The pH of the surface layer in non-limed areas is 6.0 to 7.3. This soil is
hydric. Wetness is a management concern for crop production. This soil responds well to tile
drainage; it is designated not highly erodible (class 3) in the Highly Erodible Land (HEL)
classification system.
CrA
Crosby silt loam, 0 to 3 percent slopes
This is a somewhat poorly drained soil with a seasonal high water table at 0.5 to 2.0 ft. This soil
is located on rises on till plains; slopes are 0 to 3 percent. The native vegetation is hardwood
forest. The surface layer is silt loam and has moderately low to moderate organic matter content
(1.0 to 3.0 percent). Permeability is very slow (< 0.06 in/hr) in the most restrictive layer above
60 inches. Available water capacity is moderate (6.2 inches in the upper 60 inches). The pH of
the surface layer in non-limed areas is 5.1 to 6.5. Droughtiness and wetness are management
concerns for crop production. This soil responds well to tile drainage; it is designated potentially
highly erodible (class 2) in the Highly Erodible Land (HEL) classification system.
Sh Shoals silt loam
This is a somewhat poorly drained soil with a seasonal high water table at 0.5 to 2.0 ft. This soil
is located on flood plains; slopes are 0 to 2 percent. The native vegetation is hardwood forest.
The surface layer is silt loam and has moderate organic matter content (2.0 to 4.0 percent).
Permeability is moderate (0.6 to 2 in/hr) in the most restrictive layer above 60 inches. Available
water capacity is high (11.6 inches in the upper 60 inches). The pH of the surface layer in non-
limed areas is 6.0 to 7.3. Wetness and flooding hazard are management concerns for crop
production. This soil responds well to tile drainage; it is designated not highly erodible (class 3)
in the Highly Erodible Land (HEL) classification system. Because of the flooding hazard, this
soil has a severe limitation for most non-ag uses.
Additional information about soils is available in the "Soil Survey of Hamilton County". The engineer and/or
developer should consider the need for an onsite soils investigation.
I have reviewed the plans for this project and have the following comments:
· This project exceeds the threshold for Rule 5 projects and must be designed to meet those
requirements. See www.hamiltonswcd.org for information about the revised rule.
Consider sheet flow instead of th e 12" RCP that drains the north end of the parking lot
directly to the creek.
· Improvements to the detention basin should be included for better water quality.
· Basements are not recommended in these soil types.
Should you have questions concerning these comments, please contact me.
Submitted By:
John B. South P.E.
Certified Professional in Erosion and Sediment Control
Cc~
Jon Dobosiewicz, Carmel DOCS
Greg Hoyes, County Surveyor
File
J~MEs BRA~N.d~D, MAYOR
February 13, 2004
Mr. Darrell G. Phillips, PE
Insight Engineering, Inc.
9765 Randall Drive, Suite C
Indianapolis, IN 46280
RE: Main Street Plaza- Project Review #1
Dear Mr. Phillips:
We have reviewed your submission of February 4, 2004. We offer the following comments:
GENERAL INFORMATION
1. The project site is located within current City of Carmel Corporate Limits.
2. Jurisdictions:
· Street and Right of Way - City of Carmel (Guilford Road, Main S.treet).
· Water - City of Carmel
· Sanitary Sewer- City of Carmel
· Storm Sewer - City of Carmel
3. Board of Public Works and Safety Approval Requkements:
· Water and Sanitary Sewer Availability.
· Commercial Curb Cut. The request for Board approval should include 8 ½" x 11" exhibits that
will indicate the proposed curb cuts and all appropriate data and dimensions including width, radii,
etc. Please indicate all existing and opposing driveways and their relationship to the proposed
curb cuts for this development.
· Temporary Construction Entrance. Separate BPWS approval will be required if this entrance is to
be located anywhere other the site of the permanent curb cuts.
· Consent to Encroach approvals for any permanent improvement to be installed within dedicated
easements and/or dedicated right of way. If an irrigation system is planned for this project,
additional Water Availability approval will be required from the Board and additional Water
Connection Fees will be due.
· Dedication of Right of Way. Preferred dedication forms are available electronically from this
office. I am enclosing copies of the form for your use.
I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines
for your use. Please use the Engineering Department deadlines for submissions to the Board.
Any submission to the Board requires prior final approval by the Carmel Clay Plan Commission
and/or the Board of Zoning Appeals and completion of review by the Technical Advisory
Committee. All written requests to be place on the Board's agenda must include the appropriate
Docket Numbers attd the date (or dates) of approval by the Plan Commission and/or BZA.
4. Water and Sanitary Sewer Availability and Connection Fees:
Water and Sanitary Sewer Availability (acreage) Fees - It is our assumption that this site and
previous development was served by and connected to Carmel Utilities. If that is the case, Availability
or Acreage Fees would not applicable for this development. If this is not the case, please advise.' We
DEt ART:> XIENTr OF ENGINEERING
ONE CI\qC SQUARE, CARMEI., IN 46032 OF}:ic~: 317.571.2441
EMAIL kweesc~ci.carmel.in.us
F:~x 317.571.2439
Mr. Darrell G. Phillips, PE
February 13, 2004
Page 2
,
o
do not see any reference to the demolition of water or sanitary sewer service lines to the existing
facility on the demolition plans.
Water and Sanitary Sewer Connection Fees - In order to calculate Connection Fees for this
development, detailed usage information is required. If a restaurant is to be included, we will need the
total number of seats planned. Restaurants are calculated at 0.10 EDUs per seat. If office or retail, we
will need the total square footage for each. Offices are calculated at 0.50 EDUs per 1000 square feet
and retail is 1.00 EDUs per 1000 square feet. We do not have a classification for an automotive
service and repair business. Please provide proposed usage for this facility. Please specify what type
of residential units are planned for the upper level and number of bedrooms for each unit. Connection
Fees are $1,310.00 per EDU for water and $795.00 per EDU for sanitary sewer. I am enclosing
Average User Factor Sheets for water and for sanitary sewers. ;
TAC Review/Drawings submitted for approval:
We request that all comments and comment letters generated by this office be answered in writing and
be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for
construction until all issues have been resolved. All Carmel Utility issues must also re resolved. The
design engineer must certify all drawings submitted for final approval. This office will require a
minimum of five-sets (maximum of seven-sets) of approved drawings after all issues have been
resolved. The drawings will be stamped approved and signed by both the City Engineer and Director
Carmel Utilities. The Developer/Owner will receive one-set which is to be maintained on the
construction site at all times. Carmel Utilities will receive two-sets. Our Public Works Inspector will
receive one-set and one-set will be maintained in the Department of Engineering. If more than the
minimum of five-sets are requested to be approved, the additional sets (maximum total of two
additional) must be submitted with the five required sets.
Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated
easements and/or right of way will require Consent to Encroach approval.
Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water
and sanitary sewer main locations.
Carmel Utilities will provide a separate review of this project for water and sanitary sewer issues.
I am including copies of the following with this correspondence'
· Commercial Project Approval Procedures.
· Permit Data, Contacts, etc.
· Commercial Permitting Procedures.
BONDING REQUIREMENTS
10. Upon initial review, it appears the following bonding requirements may apply to this project:
Performance Guarantees/Engmee s Estimates
Due to the extensive construction and improvements planned in the right of way, including the two
entrances and new sidewalks, we request a Performance Guarantee be posted for this work. Please
provide a Certified Engineer's Estimate for 100% of the cost of labor and materials for these
improvements. Please post a Performance Guarantee, in the amount of the Engineer's Estimate, for the
Right of Way Improvements. The Performance Guarantee may be a Performance Bond, Irrevocable
Letter of Credit or a Cashier's/Official Check.
Street Cut/Right of Way Permit and Bonding Requirements
Any work in the dedicated right of way of Main Street or Guilford Road, not included or covered by a
Performance Guarantee, will require a Right of Way Permit and a License and Permit Bond. The bond
amount will be determined b.y the number of instances of work in the right of way ~ $2,000.00 per
instance. This would include any demolition activities. Open pavement cuts in dedicated streets
require approval by our Board of Public Works and Safety. Please contact our Right of Way
Manager, Fred Glaser, to arrange permitting and bonding.
Mr. Darrell G. Phillips, PE
February 13, 2004
Page 3
PROJECT COMMENTS-CONSTRUCTION PLANS
11. Topographic Sur~'ey
· Please dimension the right of way lines for both Main Street and Guilford Road on this and on all
sheets.
· Identify the property adjacent to the west and south property lines of the development.
12. Demolition Plan-Sheet C102
Please advise the Ow-ners and Contractors involved in this project that the City of Carmel has a strict
ordinance regarding mud and other substances or debris deposited on City streets by vehicles and
equipment used in excavation, construction, demolition or otherwise within the City Limits. Be
prepared to clean both Main Street and Guilford Road as required for the duration of this project.
13. Site Plan-Sheet C201 ~
· We request that the existing Guilford Road pavement and traffic lanes, including the northbound
left turn lane and northbound through lane, be extended and shown on the plans beyond the south
property line of the development
· The plan view indicates 5-foot sidewalks while Item M in the Legend indicates 4-foot sidewalks.
5-foot wide sidewalks are required in the right of way.
· Item B in the Legend indicates 6" City of Carmel Curb. What does that mean?
· Please show all opposing drives on Main Street and on Guilford Road and their relationship to the
proposed project curb cuts.
· Dimension the existing and proposed Main Street right of way. The 20-Year Thoroughfare Plan
designation for this portion of Main Street is a Secondary Parkway with a right of way
requirement of 120-feet total, 60-feet half. The Alternative Transportation Plan (ATP) calls for
1 O-foot wide, separated, parallel multi-use paths for this portion ot' Main Street. We will yield to
the Department of Community Services to determine the requirements for this development.
· What is the purpose of the circular sidewalk at the intersection? It is labeled as a handicap ramp.
· The sidewalk in the right of way serving the entry/exit from the building at the intersection
appears to be curbed. It this the intent of the double lines? Are these walks to be privately
maintained?
14. Grading & Erosion Control Plan-Sheet C202
· Please place flow arrows in the parking areas to indicate how this site will discharge surface storm
water run-off.
15. Utility Plan-Sheet C203
· Carmel Utilities normally requires the sanitary lateral outlet from a commercial/retail development
to discharge directly to a sanitary manhole. Two sanitary wyes from the building direct to the
existing main are indicated on the drawings.
· Is there an existing easement for the offsite storm sewer outlet from the detention area? Will this
development be responsible for the maintenance of this storm sewer?
· Does the existing storm system that you are tying into have the capacity to accommodate this
additional discharge?
· Do not see water connection details. Also, it is very hard to distinguish where the existing water
main is located. It appears to be the same line as the property and/or right of way line.
16. Site Details-Sheet C801
· We would request that the Right of Way Pavement section be revised as follows'
- 1"-#1 lB Bituminous Surface on 2"-Binder on 3"-#5D Bituminous Base on 4"-#5
Bituminous Base on 6" #53-Compacted Aggregate Base.
·
17 Is this to be developed in phases? If so, please provide a plan or designate on the drawing the
construction phasing and provide an estimated time frame for the construction.
Mr. Darrell G. Phillips
February 13, 2004
Page 4
We have engaged Crossroad Engineers to provide storm sewer/storm drainage review. These comments
will be forwarded to you upon receipt by ~his office. Additionally, we reserve the right to provide
additional comments after further review by the City Engineer.
The above comments are based upon the Engineering Department's initial review. Please provide our
office with a follow up letter regarding this review and revised plans, indicating _all revisions. A second
review will focus only on detailed construction plans. It is critical that our office be made aware of all
modifications made on the plans being re-submitted, particularly if any such changes are considered "new"
or fall outside of our initial review. If you have questions, please contact Mike McBride or me at 571-
2441.
Sincerely, ,]
Dick Hill, Assistant Director
Department of Engineering
Enclosures
CC'
Mike McBride, City Engineer (w.o. encl.)
Jon Dobosiewicz, Department of Community Services (w.o. encl.)
John Duffy, Carmel Utilities (w.o. encl.) .
Paul Pace, Carmel Utilities (w.o. encl.)
Jim Haag, Carmel Utilities (w.o. encl.)
S 5PROJREV04XaMAINsTREETP LAZA
·
¥0R'$
· !
February 13, 2004
Keeler-Wcbb Associates
ATTN: Adam DeHart
486 Cu'adle Drive
Carmel, IN' 46032
VIA FACSIMILE: 574-1269
Re: Guilford Reserve
Dear Mr. DeHart:
We have reviewed the preliminary plans submitted to the Hamilton County Surveyor's
Office on January 21, 2004 for this project and have the following eommen~s:
1. The W.R. Fertig Regulated Drain passes through the propo~.xt site.
2. Thc proposed site fails in the W.R. Fertig watershed, which has an allowable
release rate set at 0.24 cfs per acre, by the Hamilton County Drainage Board.
3. The portion of the W.R, Fertig Drain that passes through the site is currently an
unstudied area. Hamilton County Ordinance 4-26-99-C(6)(a) requires a study be
performed on this area to determine a 100 year flood elevation and any flood
plain. This office will require a HEC-2 or HEC-RA$ study be performed and
submitted to us before any approval will be granted.
4. Hamilton County Ordinance 4-26-99-C(4) requires improvcmcnts to the open
regulated drain that traverses the parcel. The requirements will be what were
determined in the prior meeting with Senny Chapman, Steve Baitz and yourself.
5. During a previous look at this site, the Hamilton County Surveyor has stated the
existing pipe on the site will not be allowed to be increased in size. This is to
prevent further downstream flooding issues.
FEB
,
Please submit construction plans, secondary plat, and dralnal~c calculations for
review by this office.
7. Please note that further comments may be necessary at a later date.
Should you have any questions, I can be reached at 317-776-8495.
rely,
Grcg Hoycs
Plan Reviewer
CC: Son Dobosicwicz- Carmel DOCD
John South- HCSWCD
Dick Hill - Cazrnel Engineering
February 6, 2004
CI EL
JAMES BRAINARD, .MAYOR
Mr. Adam DeHart, LS
Keeler Webb Associates
486 Gradle Drive
Carmel, IN 46032
RE: Guilford Reserve
Dear Mr. DeHart:
,
. We have reviewed your submission of January 21, 2004. We offer the following comments'
GENERAL INFORMATION.
1. The project site is located within current City of Carmel Corporate Limits.
2. Jurisdictions:
· Street and Right of Way - City of Carmel (Guilford Road).
· Water - City of Carmel .
· Sanitary Sewer- Clay Township Regional Waste District.
· Storm Sewer - City of Carmel / Hamilton County Surveyor's Office
3. Board of Public Works and Safety Approval Requirements:
·Water Availability.
· Commercial Curb Cut. The request for Board approval should include 8 ½" x 11" exhibits that
will indicate the existing curb cut, the proposed curb cut and all appropriate data and dimensions
including width, radii, etc. Please indicate all existing and opposing driveways and their
relationship to the proposed curb cut for this development.
· Temporary Construction Entrance. Separate BPWS approval will be required if this entrance is to
be located anywhere other the site of the permanent curb cut.
· Consent to Encroach approvals for any permanent improvement to be installed within dedicated
easements and/or dedicated right of way. If an irrigation system is planned for this project,
additional Water Availability approval will be required from the Board and additional Water
Connection Fees will be due.
I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines
for your use. Please use the Engineering Department deadlines for submissions to the Board.
Any submission to the Board requires prior final approval by the Carmel Clay Plan Commission
and/or the Board of Zoning Appeals and completion of review by the Technical Advisory
Committee. All written requests to be place on the Board's agenda must inchtde the appropriate
Docket Numbers and the date (or dates) of approval by the Plan Commission and/or BZA.
4. Water Availability and Connection Fees:
Water Availability Fees- 5.0 Acres ~ $1,010.00/Acre = $5,050.00
Water Connection Fees - Assuming that these are townhomes, the following would be applicable to
the calculation of Water Connection Fees:
DEPARTMF. NT OF' ENGINEERING
ONE CIVIC SQUARE, CAt~MEI., IN 46032 Ot'qqc: 317.571.2441
EMAIL kweese@ci.carmel.in.us
Fxx 317.571.2439
Mr. Adam DeHart, LS
February 6, 2004
Page 2
1 Bedroom Unit- 0.54 EDUs per unit --
2 Bedroom Unit- 0.81 EDUs per
3 Bedroom Unit- 1.00 EDU per unit
The Water Connection Fee is $1,310.00 per EDU. Please provide this office with a listing of the
buildings, units per building and bedrooms per unit for calculation of Water Connection Fees.
5. TAC Review/Drawings submitted for approval:
We request that all comments and comment letters generated by this office be answered in writing and
be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for
construction until all issues have been resolved. All Carmel Utility issues must also re resolved. The
design engineer must certify all drawings submitted for final approval. This office will require a
minimum of four-sets (maximum of six-sets) of approved drawings after all issues have been resolved.
The drawings will be stamped approved and signed by both the City Engineer and Director Carmel
Utilities. The Developer/Owner will receive one-set which is to be maintained on the construction site
at all times. Carmel Utilities will receive one-set. Our Public Works Inspector will receive one-set
and one-set will be maintained in the Department of Engineering. If more than the minimum of four-
sets are requested to be approved, the additional sets (maximum total of two additional) must be
submitted with the four required sets.
6. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated
easements and/or right of way will require Consent to Encroach approval.
7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water
main locations.
8. Carmel Utilities will provide a separate review of this project for water issues.
9. I am including copies of the following with this correspondence: .
· Commercial Project Approval Procedures.
· Permit Data, Contacts, etc.
· Commercial Permitting Procedures.
BONDING REQUIREMENTS
10. Upon initial review, it appears the following bonding requirements may apply to this project:
Performance Guarantees/Engineer's Estimates
Please provide a Certified Engineer's Cost Estimate for 100% of the cost of labor and materials for the
construction of the following improvements:
· Right of Way Improvements to include the entrance, acceleration lane, deceleration lane,
passing blister, asphalt path, appropriate thermoplastic striping, etc.
· Water Mains
Individual Performance Guarantees will be required in the amount of the Engineer's Estimate. If the
interior streets are to be private, we will not require Performance Guarantees for Streets, Curbs &
Gutters, Storm Sewers, Street Sign and Interior Sidewalks.
Street Cut~ght of Way Permit and Bonding Requirements
Any work in the dedicated right of way of Guilford Road, not included in construction covered by a
Performance Guarantee, will require a Right of Way Permit and a License and Permit Bond. The bond
amount will be determined by the number of instances of work in the right of way ~ $2,000.00 per
instance. Open pavement cuts in dedicated streets require approval by our Board of Public Works and
Safety. Please contact our Right of Way Manager, Fred Glaser, to arrange perm/Ring and bonding.
PROJECT COMMENTS-CONSTRUCTION PLANS
11. Please provide drainage calculations for this project to this office and to the Hamilton County
Surveyor's office. We reserve the right to provide additional comments on the storm SeWer/storm
drainage plan after receipt and review of drainage calculations.
Mr. Adam DeHart, LS
February 6, 2004
Page 3
12. If right of way is available on the west side of Guilford across from your proposed entrance, and it
appears there is, we will require the construction of a passing blister to City of Carmel standards. This
blister should be extended to the existing acceleration lane of the Lennox Trace condos. I am
enclosing City of Carmel standard for acceleration/deceleration lanes and passing blisters.
13. Guilford Road is categorized as a Collector Road on our 20-Year Thoroughfare Plan. All new asphalt
in the right of way of Guilford Road (acceleration/deceleration lanes, entrance, passing blister) shall
conform to the pavement, section for Collector Roads, which is a minimum off 1 ½" H.A. Surface on
4" H.A. Binder on 9' Compacted Aggregate #53 Base.
14. Will this development be platted?
We reserve the right to provide additional comments when detailed construction drawings are submitted.
The above comments are based upon the Engineering Department's initial review. Please provide our
office with a follow up letter regarding this review and revised plans, indicating all revisions. A second
review will focus only on detailed construction plans. It is critical that our office be made aware of all
modifications made on the plans being re-submitted, particularly if any such changes are considered "new"
or fall outside of our initial review. If you have questions, please contact Mike McBride or me at 571-
2441.
Dick Hill, Assistant Director
Department of Engineering
Enclosures
cc:
Mike McBride, City Engineer (w.o. encl.)
Jon Dobosiewicz, Department of Community Services (w.o. encl.)
John Duffy, Carmel Utilities (w.o. encl.)
Paul Pace, Carmel Utilities (w.o. encl.)
Greg Hoyes, Hamilton County Surveyor's Office (w/o encl.)
S :h° ROJ REV03\GUI LFORDRES ERVE ~
Babbitt, Pamela A ,,
From'
Sent:
To'
Subject:
Adam Dehart [adehart@keele~ebb.com]
Friday, January 30, 2004 1:35 PM
'Babbitt, Pamela A'
RE: Steckley Rezone/Guilford Reserve
CRAWFORD DEVELOPMENT, LLC
ROBERT BARBATO
1386 CLAY SPRING DRIVE
CARMEL, IN 46032
339-3300 CELL
580-9555
573-9666 FAX
RPBCustomHomes@aol.com
/
BY THE WAY THIS INFORMATION IS IN THE CENTER OF THE TITLE BLOCK ON THE
DRAWINGS. (EXCEPT FOR THE HOME PHONE NUMBER AND E-MAIL ADDRESS)
ADAM DeHART, LS
KEELER-WEBB ASSOCIATES
486 GRADLE DRIVE
CARMEL, IN 46032
317-574-0140
317-574-1269 (FAX)
..... Original Message .....
From- Babbitt, Pamela A [mailto:PBabbitt@ci.carmel.in.us]
Sent- Tuesday, January 27, 2004 8:44 AM
To: ' adehart@keelerwebb, com'
Subject- Steckley Rezone/Guilford Reserve
Adam, do you have an address for Robert Barbato? per Angie Butler. pb
City of Carlnel
VIA FAX: 846-8782
Original by mail
January 29, 2004
Charlie Frankenberger
Nelson & Frankeberger
3105 E 98th Street, Ste 170
Indianapolis, IN 46280
REe
Steckley Property (#04010024 Z)- Rezone Application
Dear Mr. Frankenberger:
This letter is in response to your Rezone Application for the Steckely Property. This is a
preliminary letter to let you begin on revisions. Additional comments will be made at the TAC
Meeting, February 18. Please complete the following items'
1. Please provide the official adjacent property list from Hamilton County Auditor's Office.
2. Please provide Exhibit D (Landscape Plan). Also, attach it to the PUD ordinance (see
section 7.2 of your PUD Ordinance).
3. Please attach Exhibit H (signs) to the PUD ordinance (See 9.1.A of your PUD
Ordinance).
4. Please attach Exhibit I (conceptual plan) to the PUD ordinance (See 12.1.A of your PUD
ordinance).
If you have any questions or if I may be of assistance, please do not hesitate to call.
Sincerely,
Angeliffa Butler
Planning Administrator
SteckleyProperty-Rezone
COp'y
ONE CMC SQUARE
Page 1
CARNEEL, INDIANA 46032
317/571-2417
Carmel Clay Schools- Continuing Excellence in
Education
January 27, 2004
Mr. Adam DeHart
Keeler-Webb
Consulting Engineers
486 Gradle Drive
Carmel, IN 46032
Re'
Dear Mr. DeHart'
Thank you for your recent submittal for the above referenced project. I have reviewed
the drawings and have the comments below.
The internal circulation system is not adequate for our standard 84 passenger bus.
School age children will be required to walk to the development entrance at Guildford
Road. Adequate sidewalks should be provided so school age children can walk to the
bus stop and have a safe area to gather.
If you have any questions, please feel free to call me.
Sincerely,
Ron Farrand, Jr.
Director of Facilities and Transportation
C' Department of Community Services- Carmel
File
Facilities & Transportation Department - 5185 East 131~ Street, Carmel, IN 46033
317/844-8207 - Fax 317/571-9659
VIA FAX: 573-9666
Original by mail
January 27, 2004
(#04010024 Z) - Rezone
Dear Mr. Barbato'
This letter is in response to your .cation for the Steckely Property. This is a
preliminary letter to let you begin on Additional comments will be made at the TAC
Meeting, February 18. Please compl the following items'
1. Please provide the officia)/hdjacent property list from Hamilton County Auditor s Office.
2. Please provide Exhibit/D (Landscape Plan). Also, attach it to the PUD ordinance (see
section 7.2 of your P~ Ordinance).
3. Please attach Ex!xi4oit H (signs) to the PUD ordinance (See 9.1.A of your PUD
Ordinance). /
4. Please attach~.~hibit I (conceptual plan) to the PUD ordinance (See 12.1.A of your PUD
ordinance). ~'~
If you have ~y questions or if I may be of assistance, please do not hesitate to call.
Sincerely'
,:;
Angelina Butler "
· Planning Administrator
S teckleyProperty-Rezone
Page 1
ONE CIVIC SQUARE
CAR_h~L, INDIANA 46032
317/571-2417
Babbitt, Pamela A
From:
Sent:
To:
Cc:
Subject:
Butler, Angelina V
Friday, January 23, 2004 2:49 PM
Babbitt, Pamela A
Morrissey, Phyllis G; Pattyn, Dawn E; Tingley, Connie S; Hollibaugh, Mike P; Keeling,
Adrienne M; Kendall, Jeff A; Brewer, Scott I; Hancock, Ramona B; Dobosiewicz, Jon C; Stahl,
Gayle H; Pohlman, Jesse M
Docket No. Assignment:(Z) Steckley Rezone (Guilford Reserve) (04010024 Z)
Pam~
Please print and fax this e-mail to the petitioner identified below and update the files. I have issued the necessary
Docket Number for (Z) Steckley Rezone (Guilford Reserve). It will be the following:
Docket No. 04010024 Z
$1250+ 100'5 acres= 1750
Total Fee: $1,750.00
Docket No. 04010024 Z: Steckley Rezone (Guilford Reserve)
The applicant seeks to Rezone approximately 5 acres from B-6/Business to PUD/Planned Unit Development.
The site is located at 1011 S. Guilford Road.
Filed by David Klain of Crawford Development, LLC.
Petitioner, please note the following:
1. This Item has been placed on the February 18 agenda of the Technical Advisory Committee.
2. Mailed and Published Public Notice needs to occur no later than Friday, February 20. Published notice is
required within the Indianapolis Star.
3. Proof of Notice will need to be received by this Department no later than noon, Friday, March 12. Failure to
submit Proof of Notice by this time will result in the tabling of the petition.
4. The Filing Fee and Twenty (15) Informational Packets must be delivered to Plan Commission Secretary
Ramona Hancock no later than noon, Friday, March 5. Failure to submit lnfornkational Packets by this time will result in
the tabling of the petition to the Tuesday, April 20, agenda of the Plan Commission.
5. The Item will appear on the March 16, 2004 agenda of the Plan Commission under (Public Hearings).
6. The Item may also appear on the Tuesday, March 30, agenda of the Plan Commission Special Studies
Committee.
Please contact Mr. Klain at 733-9600 (Fax: __- ) with this information. Once the file is updated (copy of fax
filed) please return it to Jon's office.
Thank you,
Angle Butler
Planning Administrator
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317-571-2417
Fax: 317-571-2426
FACSIMILE TELECOPY COVER LETTER
DATE:
January 23, 2004
TO' Robert Barbato
FAX: 573-9666
FROM' Pam
Attached hereto are 2 pages, including this cover letter, for facsimile
transmission. Should you experience any problem in the receipt of these pages,
· please call 317/571/2417 and ask for Pam.
NOTES' Docket Assignment Sheet for Steckley Rezone.
Please call if you have any questions.
CONFIDENTIALITY NOTICE: The materials enclosed with this facsimile transmission are private
and confidential and are the property of the sender. The information contained in the material is
privileged and is intended only for the use of the individual(s) or entity(ies) named above. If you are
not the intended recipient, be advised that any unauthorized disclosure, copying, distribution or the
taking of any action in reliance on the contents of this telecopied information is strictly prohibited. If
you have received this facsimile transmission in error, please immediately notify us by telephone to
arrange for return of the forwarded documents to us.
January 22, 2004
Mr. Adam DeHart, LS
Keeler-Webb Associates
486 Gradle Drive
Carmel, IN 46032 :~ 0
RE:
1011 South Guilford Road
Carmel, Indiana
Job No.' 0401-003
Dear Mr. DeHart:
! have received and reviewed the documents for the above-mentioned
project.
At the present time, ! see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Sincerely,
Michael D. Fogarty
Chief of Police
MDF:vb
CC:
Dept. of Community Services
( 517) 571-2500
A Nationally Accredit~:iii!~{!~forcement Agency
(517) 571-2512
From:
Sent:
To'
Subject:
Jim Steckley
5801 East 116th Street
REZONE B-6 to PUD
contact'
David Klain
733-9600
Babbitt, Pamela A
Friday, January 16, 2004 12:17 PM
Brewer, Scott I; Butler, Angelina V; Dobosiewicz, Jon C; Hollibaugh, Mike P; Keeling, Adrienne
M; Pattyn, Dawn E
new sub
JAMES J. NELSON
CHARLES D. FRANKENBERGER
JAMES E. SHINAVER
LAWRENCE J. KEMPER
JOHN B. FLATT
FREDRIC LAWRENCE
of counsel
JANE B. MERRILL
VIA HAND DELIVERY
NELSON
&
FRANKENBERGER
A PROFESSIONAL CORPORATION
ATTORNEYS-AT.LAW
January 16, 2004
3105 EAST 98TH STREET
Sta?z 170
INDIANAPOLIS, INDIANA 46280
317-844-0106
FAX: 317-846-8782
Jon C. Dobosiewicz
Department of Community Services
One Civic Square
Carmel, IN 46032
Re: Crawford Development, LLC - Petition to Change Official Zoning Map
Dear Jon:
Please find enclosed (i) an original and one copy o£ a Petition to Change Official Xoning Map, (ii) a
in the amount of $1,750.00 for the filing fee, and (iii) a draft PUD Ordinance, to which is attached the
following exhibits:
A
B
C
D
E
F
G
H
I
Legal Description of Real Estate
Building Rendering and Elevations
Community Mail Box Structure
Landscape Plan
Yard light illustration
Building light illustration
Parking lot light illustration
Entryway treatment- signage and wall
Conceptual Plan
Please file these documents and notify us when you have assigned a docket number for this matter.
Please call with any questions.
CDF/jlw
Enclosures
Very truly yours,
NELSON & FRANKENBERGER