No. Date Defect Description Type
Pulte Cost
INOUTNotesto Remedy
Banked Parking Defects
17/20/11Banked Parking not curbed = PUD ViolationNot Required3080
27/20/11Banked Parking lot needs Light PolePUD ViolationNot Required5000
37/20/11Banked Parking (catch basin) overflow curb = 40 feetCode ViolationNot Required880
47/20/11Banked Parking Wood Guard Rail - Seal Paint coatQuality issueHOA Maintenance500
Street and Curb Defects
57/3/1110th NW South side by funeral home - Sidewalk Crack Quality issueComplete300
Not Pulte
Responsibility
67/3/11Street Curb cracks = 20Quality issue2000
77/21/11Bldg 15 - No concrete curb on road end = 36 feetPUD ViolationNot Required792
87/20/119th Street NW - West end / north side no curb = 114 feetPUD ViolationNot Required2508
97/20/1111th Street - NW East end no curb = 45 feetPUD ViolationNot Required990
107/20/11Monon Lane - East end no concrete curb = 66 feetPUD ViolationNot Required1452
117/25/11Monon Lane - No Street Name SignQuality IssuePulte will install1000
127/3/11Bldg 7 - Finish Asphalt Top Coat missingPUD ViolationComplete3500
137/3/11Bldg 14, 15 - Finish Asphalt Top Coat MissingPUD ViolationComplete7000
Grounds Defects
Sod will be resintalled as
147/13/11Bldg 21 - Sod missing Southwest corner by roadLandscape Issue300
previously stated. Will
157/13/1111 street NW - Sod missing east end Landscape Issue200
commence mid to late
Not Pulte
Responsibility
167/14/11All Grounds - remove all plastic utility warning posts, wht, yellowQuality Issue300
177/17/11North Retaining wall - back fill with soil and sod = 114X8 feetCode ViolationIs backfilled properly3000
187/20/11New East Retaining Wall - Insufficiet adhesive on cap rowPUD ViolationHas been re-adhered500
If missing, Pulte will
install
197/20/11Missing Shutters - 2 sets of 2 shuttlers each @ ground floorQuality Issue200
207/20/11Monon entry sidewalk needs fill dirt on sidesCode ViloationNot Required2000
Carmel perfromed
construction inspection
217/17/11NW retaining wall has improper placement of geo grid PUD Violation5000
Building Defects
Meters installed by
utility company - not
Pulte responsibility
227/1/11Bldg 7 - W end Gas meters hanging at 30 degree angleQuality issue500
Meters installed by
utility company - not
Pulte responsibility
237/18/11Bldg 16 - W end Gas meter hanging high in bldg windowCode Violation500
Meters installed by
utility company - not
Pulte responsibility
247/14/11Bldg 7 - N end Gas Meter Manifold support missing Code Violation200
256/30/11All Bldgs - all Front Door caulking installed incorrectlyQuality issue6300
Not considered by
Pulte to be a building
defect
267/3/11All Bldgs - front door Threshold no caulk at bottom by concreteQuality issue3150
Not considered by
Pulte to be a building
defect
277/18/11All Bldgs - Front Door decks lack sealant by bldg wallQuality issue3150
Warranty Period for
settlement is 2 years
from original closing
date - these buildings
are past the warranty
period
287/8/11Bldg 4,5 - 2 units Sidewalk cracked (settling from threshold )Quality issue200
Under review - issue to
be inspected by a
structural engineer
297/14/11Bldg 3 - Unit 15 Major foundation Settling/Exterior bldg cracksCode Violation10,000
Repairs still in
progress as we are
able to gain access to
the homes - Pulte
onsite field
representative is
sending requests for
owner contact
information to Aleta
Wilson - Property
Manager
307/14/11All Bldgs - Roof Soil Pipes length Code Violation3450
Complete per HOA
turnover inspection
item response sheet
317/14/11All Bldgs - Dryer Vent Lint Screens not RemovedCode Violation6900
Complete per HOA
turnover inspection
item response sheet
327/14/11All Bldgs - Leaning Furnance Flue Pipes=15 totalCode Violation7500
Complete per HOA
turnover inspection
item response sheet
337/19/11All Bldgs - HVAC units missing rock (7/18 = 10 bldg ends noted)Code Violation1750
Complete per HOA
turnover inspection
item response sheet
347/19/11All Bldgs - service wiring not bundled, cable tied, 7/18 Total = 15Quality Issue1125
Cracks exceeding 1/4"
in width will be
repaired per the
Cracked Concrete Drives - Bldg1=3 Bldg 9=2 Bldg 2=1Bldg 11=1
Warranty during the
first 2 years from the
original closing date.
357/19/11Quality issue60,000
Bldg 3=1 Bldg 5=1 Bldg 6=2 Bldg 8=1 Bldg 15=1 Total = 12
Performance Standard
per the Warranty is
50% of the surface
area affected within 2
years of the original
closing date. These
buildings are past the
Warranty period and
severity of the issue
does not warrant a
repair according to the
performance standard.
367/25/11Bldgs 18, 19 - Concrete drives have surface flaking Quality Issue2000
Site Drainage is
warranted by the
builder for a period of 2
years. The 2 year
warranty period for
these buildings is
expired.
377/20/11Bldgs 4,5,6 - Standing water sidewalks and mulch bedsCode Violation9386
Agreed upon work
completed
387/20/11Bldgs 21,22,23 Standing water, mold, ice on sidewalksCode Violation11268
397/25/11All Bldgs - Roof fasia boards have "unpainted" bare endsQuality IssueComplete900
Not Pulte responsibility
408/8/11Relocate 11 satelite Dishes from balconies to Roof Quality Issue1650
New item - Pulte will
review and if trim is
missing Pulte will
install
418/18/11Bldg13,14 - Missing wood Molding Trim on Bay windowsQuality Issue500
TOTAL170931