HomeMy WebLinkAbout2012 Annual Report letter 03-01-12Martin Marietta Materials
Indiana District
11405 North Pennsylvania
Suite 250
Carmel, IN 46032
Telephone (317) 573 -4460
Fax (317) 573 -5975
March 1, 2012
Mr. Mike Hollibaugh
Director, Department of Community Services
City of Carmel, City Hall
One Civic Square
Carmel, Indiana 46032
RE: Annual Report Letter
Dear Mr. Hollibaugh:
The following items are included with the submission of our annual report:
An updated aerial photograph to serve as a mining progress report map.
Mueller Property South 04040024SU, 05090003SU, 08030032SU, 05090003SU
LIAR 1 2012
Mining activity on Mueller South consisted of processing raw material into a back -fill type
product used primarily in the Keystone upgrade and the 1465 projects. The amount
produced on -site was 218,719 tons.
The Blue Woods Creek relocation is working as designed and is being monitored by State
and local agencies.
The North Indianapolis site continues to employ a contractor to provide street sweeping
twice daily, in and around the entrance area of the 96 Street site. The plant purchased a
rotary broom sweeper to maintain in -plant roadways.
The caution signals installed along 106 street to provide additional safety during times of
transporting material from the Mueller South property are functioning and inspected once a
month.
The blasting program at North Indianapolis has been continuously refined through a
cooperative effort with Vibra -Tech, Austin Powder, and Martin Marietta. Changes in Blast
sequencing, increased burden on the front row holes, and smaller shot sizes are all part of
the effort to minimize blasting noise and neighbor disturbance.
A meeting between Martin Marietta and Bernard Lally, a Kingswood Neighborhood
Association representative, took place in 2011. The meeting discussed the construction of
a berm along the new fence location.
March 1, 2012
Page 2
Water quality and water elevation monitoring have been ongoing on the Mueller properties
since 2003 based on the monitoring plan prepared by AquaFusion. Quarterly reports
summarizing water elevations and annual reports summarizing quality sampling results are
submitted to the Mr. John Duffy. Currently 13 wells, four groundwater sources (three lakes
and Blue Woods Creek) are monitored.
Updates to the Spill Prevention Control and Countermeasures Plans for the North
Indianapolis and Carmel Sand operations were submitted to the agencies designated in
the Commitments on February 24.
A gate and landscaping was installed on the Mueller South property during April 2010. The
gate was installed on the 106 St entrance to prevent motorist from accessing Blue Woods
Creek. Trees and boulders were installed to improve the aesthetics of the entrance and to
prevent the public from driving around the newly installed gate.
Mueller Property North 05010021SU
The Carmel Sand Plant primarily operated five 10 hour production shifts Monday
through Saturday during 2011. Seasonal shutdown occurred 12/02/11.
Customer service hours were 7am to 4:30pm Monday through Friday and 8am to 12pm
on Saturday during the loading season. The only exception was to supply the
Keystone and 1 465 projects. Notification was sent to the D.O.C.S. for all operations
outside of the agreed upon hours
Mine progression on Mueller Property North was not as significant as in past years.
The focus of the mining occurred on Martin Marietta property where the `old" plant was
located.
If you require additional information feel free to contact me at 317 573 -4460.
Sincerely,
if 44
Ed Gehr
VP -Gen Mgr IN District