HomeMy WebLinkAboutGibraltar/CO1/ENG/PAC streetscape/inc. 11,395 CITY OF CARMEL TO: Bob Olson CONTRACT CHANGE ORDER NO.: 2 CSO Architects, Inc. DATE: 6/20/2011 8831 Keystone Crossing PROJECT NAME: Parcel 7A City Center Streetscape Indianapolis, IN 46240 I. You are directed to make the following changes in this Contract: SCHEDULED ADJUSTMENT ITEM AMOUNT OR DAYS COP #2 11,395.00 15 di 17 6re H. The following referenced Documents further describe the changes outlines in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to the Change Order 211,018.00 Contract Price will be increased /decreased by this Change Order 11,395.00 New Contract Price including this Change Order 222,413.00 Contract Time Prior to this Change Order Days Completion Date Net increased resulting from this Change Order 15 Days Current Contract Time including this Change Order Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended Accepted: Gi t 7F --GT'7 cx.lc. Gibraltar Construction Corp 1 p 4 ENGINEER CONTRACTOR ames Brainard Mayer a3� o cy a _I i t a u 2932 Webster Avenue I/ Address Address '64' ael ri. e, ty En neer IQ 0. 740 Indianapolis, Indiana 46219 1s-! .,,...r.4 City /Stat- ip City /State /Zip Ma B 1 e, Member By: -cf„. /11 Lori atson, Member 'ike Smith Phone: W1 -8 o Phone: 317-375-1588 Date: 6 3 4 11 Date: 6 ?'ol it ATTEST _,`i.. AO 1 Diana C% dray, Cle l Treasurer Date: •1-IL GIBRALTAR P Job roj Cermet ProJece Carmel Parcel 7A Strootscape Y CONSTRUCTION CORD`r L' COP Date: 6/20/2011 Rework of Limestone Retaining wall per CSO request. CHANGE REQUEST SUMMARY: Direct Job Cost Subtotal: 10,206 Overhead end Profit at 10% 1,021 Subtotal: 11,227 Bond Premium at 1.5% 168 TOTAL: Il i EL uR I i5 Li Total Time Required to Implement Change Request: 7 days Total Time Extension Requested for this Change Request 7 days Deadline for Acceptance Prior to Negative Impact To Schedule: 6/27/2011 Authorization to Proceed with Worlc: Bob Oison, CSO Architects, Inc. DIRECT JOB COST SUMMARY: �*YA1M v W5 *'r'.'sl':Y u::M�.+l�.15'k 3 'a3SHF�.`vf X1'.4.1'.. .i. A MIL LBR SUB C Unit Unit Unit DESCRIPTION QTY Price MIL Price LABOR Arica SUB Broady Campbell Proposal (attached) Is 1 9070 9,070 Additional Supervision mh 16 71 1,136 MIL LABOR SUB 1,136 9,070 DIRECT JOB COST SUBTOTAL: 10,206 i BROADY- CAMPBELL, INC. Masonry Contractors 2115 ANDREW BROWN AVENUE INDIANAPOLIS, INDIANA 46202 PHONE 925 -4261 FAX 925 -4263 PROPOSAL Gibratter Construction June 16, 2011 2932 Webster. Ave. Atten: Joe C..4%.• Indianapolis, IN We hereby propose to furnish all material and perform the necessary labor to. complete the to permorm the rework to landscape limestone blocks as requested by CSO pictures and Matt G.'s instructlon. We have included removing 14 blocks recutting 4pieces to fit the new design, purchase one new i stone for length required and reset 12 stones. We also Include necessary patching of dowels pin holes that will now become exposed. I Labor S 4,170.00 ins Payroll Taxes 959.00 Material Equipment 3,116.00 0/11 &Profit 1825.00 59,070.00 If two small stones could be used in luc of new stone required deduct S900.00 for building located at Package P -11 in Carmel, IN and owned by Camel Redevelopment Commission all in accordance with the plans and specifications prepared byCSO for the sum of Nine Thousand Seventy 00/100— DOLLARS (5 9,070.00 This proposal is good for thirty (30) days from the date, and acceptance is subject to further conditions set forth herein. The details must conform to the scale drawings on which this proposal is based. All agreements are contingent upon strike's, lockouts., accidents, or delays beyond our control. We also agree to comply wit the oity-ordinances, remove all surplus material and,clean up all debris caused by the work, included in this proposal. No work included other than clearly defined herein: Monthly estimates (invoices) are due by the 12th of month following the month the work is performed. Payments not paid within twenty (20) days following the initial estimates (invoices) will bear interest of the rate of 12 percent 1 per month in addition to the costs ofcollection and attorney fees. Respectfully submitted, Accepted: Broady- Campbell, Inc. Title: Firm: Signed:. Date of Acceptance: Title: President N 1 Broady- CatnpbeI11Propotal