180552 12/16/2009 CITY OF CARMEL, INDIANA VENDOR: 362171 Page 1 of 1
ONE CIVIC SQUARE WALSH CONSTRUCTION CO
CHECK AMOUNT: $686,055.00
CARMEL, INDIANA 46032 2749 N STATE ROAD 39
*+iir LA PORTE IN 46350
CHECK NUMBER: 180552
CHECK DATE: 12/16/2009
DEPARTMENT ACCOUNT PO NUMBER IN NUM AMOUNT DESCRIPTION
920 R4470604 19786 11 43,390.22 136 /KEYSTONE CONSTRN
920 R4470604 19786 12/08/2009 642,664.78 136 /KEYSTONE CONSTRN
AMER!CAN 7260 Shadeland Station, Indianapolis, Indiana 46256
TEL 317.547.5530 FAX 3 7.543.0270
i N C. wwa.sh ucturepoint.com
W
M E M® R A N D U M
DATE December 8, 2009
TO: Mike McBride, City Engineer for City of Carmel
FROM: David Machala
RE: Retainage Release for Contract 07 -08F
CC: Jeremy Kashman, Skip Tennancour, Project File
Mike,
American Structurepoint, Inc. has received a letter from Walsh Construction dated
December 4, 2009 requesting the release of the full amount of withheld retainage for the
work completed on the above mentioned contract. The total amount of retainage being
withheld is $714,071.98. The City of Carmel Engineering Department has authorized
90% of the withheld retainage to be released to Walsh Construction. The reason for
withholding the remaining 10% is due to concerns with the lighting that was installed by
Midwestern Electric. American Structurepoint, Inc. agrees that the project has met the
requirements of substantial c 1 nand supports the release of 90% of the withheld
retainage in the amount of $642,664.78. The remaining 10% of the withheld retainage
($71,407.20) will be reques e with t e final pay estimate after all of the lighting
concerns have been rectified between the City of Carmel and Midwestern Electric.
Thanks,
David Machala, RPR
American Structurepoint, Inc.
>9 7'�,
I
VOUCHER NO. WARRANT NO.
Walsh Construction Company ALLOWED 20
2749 North State Road 39 IN THE SUM OF
LaPorte IN 46350
642,664.78
ON ACCOUNT OF APPROPRIATION FOR
Walsh Construction Company
PO# or INVOICE NO. ACCT /TITLE AMOUNT Board Members
DEPT.#
19786 12/8/2009 4470604 $642,664.78
I hereby certify that the attched invoice(s), or
bill(s) is (are) true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
December 14, 20 09
Total $642,664 Signature
Cost distribution ledger classification if City En
claim paid motor vehicle highway fund Title
CITY OF CARMEL
PROJECT NO. 07 -08F
Keystone Parkway 136th Street Interchange
Progress Estimate Summary Sheet St Signature Page
Progress Estimate No 11
Partial x
Final
Earned to date 14,081,896.58
Previous payments 14,038,506.36
Earnings this estimate 43,390.22
Retainage
Amount due Contractor 43,390.
CONTRACTOR: 9 DATE: g Zoo 4
alsh Construction Company Phone: (219) 324 -4320
2749 North State Road 39 Fax: (219) 324 -4719
LaPorte, IN 46350
CONSULTANT: DATE:
AME AN STRUCTUREPOINT, INC. Phone: (317) 547 -5580
7260 Shadeland Station Fax: (317) 543 -0270
Indianapolis, Indiana 46256 -3957
APPROVED BY: 2 DATE:
CITY OF CARMEL
Construction Pay Estimate Report
12/712009 2:12 PM
City of Carmel
FieldManager 4.5a
Contract: _07 -08F, Keystone Parkway at 136th Street
Estimate Estimate Entered Estimate Managing
No. Date By Type Office
11 12/4/2009 Melissa L Walker MONTHLY American Structurepoint, Inc
All Contract Construction Prime Contractor
Work Completed Started Date Walsh Construction Company
2749 North State Road 39
Laporte IN 46350
Comments
Item Usage Summary
Project: 07 -08F, Keystone Parkway at 136th Street
Category: 1, Contract Items
Prop. Project Item Mod.
Item Description Unit Item Code Ln. Line No. Type No. Quantity Item Price Dollar Amount
Excavation, Common CYD _0012 0009 0045 00 000 253.000 13.50 3,415.50
,f Excavation, Unclassified CYD _0013 0010 0050 00 000 476.180 10.00 $4,761.80
Mailbox Assembly, Single EACH _0085 0071 0355 00 000 1.000 150.00 $150.00
Seal Coat, Graffiti Resistant SFT _0364 0092 1435 00 000 5,310.190 0.52 $2,761.30
Surface Seal SFT _0106 0093 0460 00 000 5,310.190 0.39 $2,070.97
Pipe, Underdrain Outlet, 6 in. LFT 0115 0099 0490 00 000 22.800 15.15 $345.42
Masonry Coating SFT _0169 0124 0615 00 000 1,442.810 1.25 1,803.51
Luminaire, Roadway, Metal EACH _0226 0174 0865 00 000 13.000 1,563.04 $20,319.52
Halide, 250 Wa
Switch Decorative Lighting from LS _0657 0322 1528 CO 002 1.000 18,200.22 $18,200.22
Holophane to LED
Subtotal for Category 1: $43,390.22
Subtotal for Project 07 -08F: $43,390.22
Total Estimated Item Payment: $43,390.22
Time Charges
Site Site Description Site Method Days Charged Liq. Damages
00 Overall Contract Site Completion Date N/A $0
Total Liquidated Damages: $0
Contract ID: _07 -08F Estimate: 11 Page 1 of 2
f 'tt
Construction Pay Estimate Report
12/7/2009 2:12 PM
City of Carmel
FieldManager 4.5a
Pre- Voucher Summary
Stockpile
Project Voucher No. Item Payment Adjustment Dollar Amount
07 -08F, Keystone Parkway at 136th Street 0011 $43,390.22 $0.00 $43,390.22
Voucher Total: $43,390.22
Summary
Current Voucher Total: $43,390.22 Earnings to date: $14,081,896.58
Current Retainage: $0.00 Retainage to date: $714,071.97
Current Liquidated Damages: $0.00 Liquidated Damages to date: $0.00
Current Adjustments: $0.00 Adjustments to date: $0.00
Total Estimated Payment: $43,390.22 Net Earnings to date: $13,367,824.61
Payments to date: $13,32
Net Earnings this period: $43,390.22
c
Estimate Certifi a ion
RPR American Structurepoint, Inc. (Date)
Walsh Construction Company (Date)
City of Carmel (D e)
Contract ID: _07 -08F Estimate: 11 Page 2 of 2
z
CITY OF CARMEL
PROJECT NO. 07 -08F
Keystone Parkway 136th Street Interchange
Progress Estimate Summary Sheet £t Signature Page
Progress Estimate No
Partial X
Final
Earned to date 14,081,896.58
Previous payments 14,038,506.36
Earnings this estimate 43,390.22
Retainage
Amount due Contractor 43,390.22
CONTRACTOR: DATE: Z o() q
W alsh Construction Company Phone: (219) 324 -4320
2749 North State Road 39 Fax: (219) 324 -4719
LaPorte, IN 46350
CONSULTANT: DATE:
4AMEPAN TRUCTUREPOINT, INC. Phone: (317) 547 -5580
7260 Shadeland Station Fax: (317) 543 -0270
Indianapolis, Indiana 46256 -3957
APPROVED BY: DATE:
CITY OF CARMEL
l qV
VOUCHER N0, WARRANT N0.
Walsh Construction Company ALLOWED 20
274 North State Road 39 IN THE SUM OF
LaPorte IN 46350
43,390.22
ON ACCOUNT OF APPROPRIATION FOR
Walsh Construction Company
INVOICE NO. ACCT /TITLE AMOUNT Board Members
DEPT
9 7 86 Pay Ap 11 4470604 $43,390.22
I hereby certify that the attched invoice(s), or
bill(s) is (are) true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
December 14, 20 09
Tota $43 ,390.22 Signature
Cost distribution ledger classification if Clt Engineer
claim paid motor vehicle highway fund Title