Loading...
168251 01/21/2009 CITY OF CARMEL, INDIANA VENDOR: 356231 Page 1 of 1 ONE CIVIC SQUARE YARDBERRY LANDSCAPING EXCAV_ CHECK AMOUNT: $100,608.92 e CARMEL, INDIANA 46032 9940 SOUTH 100 WEST ANDERSON IN 46017 CHECK NUMBER: 168251 CHECK DATE: 1/21/2009 DEPARTMENT ACCOUNT PO NUMBER INV OICE NUMBER AMOUNT DESCRIPTION 2200 R4462200 19775 100,608.92 MAIN STREET SIDE PATH r CONSTRUCTION PROJECT INVOICE DATE: January 13, 2009 COMPANY NAME: Yarberry Landscape Excavating Company AND ADDRESS 9940 South 1000 West Anderson, IN 46017 TELEPHONE NO.: (765)- 620 -0981 FAX NO.: (765)- 378 -0376 PROJECT NAME: Main Street Sidepath Phase 1 Guilford Rd. to 4 Ave. SW INVOICE NO.: 3 Construction pay items as per Progress Pay Estimates No. 3 as shown on the attached invoice for work completed between the dates of December 1, 2008 to December 31, 2008. TOTAL PAY THIS ESTIMATE: $111,787.69 DEDUCT 10% RETAINAGE: $11,178.77 TOTAL NOW DUE: $100,608.92 Submitted by CrossRoad Engineers, PC I 4�5Agg 1 .3 laoq Project Represents e signed name Date Lance Stahley Project Representative printed name 1 of 2 CITY OF CARMEL Main Street Sidepath PROGRESS PAY ESTIMATE NO. 03 For work done during the period of: 12/1/08 through 12/31/08 yantlt _ytti p suma gn I Mobilization /Demobilization 0.25 LSUM 1.00 LSUM $12,500.00 $3,125.00 $12,500.00 2 Construction Engineering 0.25 LSUM 1.00 LSUM $8,000.00 $2,000.00 $8,000.00 1 3 lClearino 0.25 LSUM, 1.00 LSUM, $20,000.00 $5,000.00 $20,000.00 4 Trees, 6", Remove EA 4.00 EA 1 $500.00 $2,000.001 5 Headwalls and Partial Stone Wall, Remove LSUM 1.00 LSUM $2,500.00 $2,500.00 6 Valve Covers, Adjust to Grade EA 2.00 EA $500.00 $1,000.001 7 B-Borrow for Structure Backfill CYD 235.60 CYD $22.00 $5,183.20 8 Flowable BackFill for Pipes CYD CYD $115.00 9 Storm Sewer Pipe, 12" 40.00 LFT 461.00 LFT $45.00 $1,800.00 $20,745.00 10 -Storm Sewer Pipe, 18" LFT 450.00 LFT $50.00 $22,500.00 11 Draintile, PVC, 4' 18.00 LFT 18.00 LFT $25.00 $450.00 $450.00 1 12 Arch CMP, 95x67 16.00 LFT 16.00 LFT $237.00 $3,792.00 $3,792.00 13 Inlet E-7 EA 6.00 EA $1,450.00 $8,700.00 14 Inlet J-10 EA 7.00 EA $1,450.00 $10,150.00 15 Manhole C-4 EA 3.60 EA $1,800.00 $6,480.00 16 Cored Holes in Structures EA 2.00 EA $800.00 $1,600.00 17 Class A Concrete for Structures 20.00 CYD 20.50 CYD $975.00 $19,500.00 $19,987.50 18 Geotextile 45.28 SYD 45.28 SYD $5.00 $226.40 $226.40 19 Class 11 Riprap 16.45 TON 16.45 TON $60.00 $987.00 $987.00 20 Curb Ramps incl. truncated domes 5.17 syb 103.24 SYD $130.00 $672.10 $13,421.20 21 4" Concrete Sidewalk 383.66 SYD 1552.36 SYD $49.00 $118,799.34 $76,065.64 22 Concrete Sidewalk Removal SYD 109.56 SYD $10.00 $1,095.60 23 Concrete Curb Gutter 99.00 LFT 889.50 LFT $20.00 $1,980.00 $17,790.00 24 l Concrete Curb LFT 307.00 LFT $24.00 $7.368.00 25 Concrete Curb or C&G Removal LFT 212.00 LFT $5.00 $1,060.00 26 Concrete Pavement for Drive, 6" 36.08 SYD 229.49 SYD $52.00 $1,876.16 $11,933.48 27 Modular Block Retaining Wall 70.00 LFT 70.00 LFT $125.00 $8,750.00 $8,750.00 28 Rebuilt Stone Wall 23.00 LFT 23.00 LFT $130.00 $2,99-0.0-0- $2,990.00 29 Pedestrian Railing 36.00 LFT 36.00 LFT $193.00 $6,948.00 $6,948.00 30 Flowable Backfill for Roadway Patching 19.74 CYD 47.24 CYD $115.00 $2,270. 0 $5,432.60 31 -Linear Grading 875.00 LFT 2375.00 LFT $10.00 $8,750.00 $23,750.00 32 IUnsuitable Materials Remove/Replace (undistrib 35.00 CYD 35.00 CYO $35.00 $1,225.00 $1,225.00 33 Compacted A g. For Base, 53 131.74 TON 599.78 TON $24.00 $3,1161.76 $14,394.72 34 HMA Surface for Road Patching 20.97 TON 20.97 TON $115.00 $2,411.55 $2,411.55 35 Maintenance of Traffic 0.34 LSUM I 1.00 LSUM $10,000.00 $3,400.00 $10.000.00 36 Construction Signs, A EA 16.00 EA $200.00 $3,200.00 37 Barricade, Type III (undistributed) EA EA $125.00 38 Silt Fencina LFT 930.00 LIFT $4.00 $3,720.00 39 Construction Fencing LFT LFT $7.00 1 40 IDitch Inlet Protection EA EA $125.00 41 Curb Inlet Protection EA EA $125.00 42 Tree Protection Trimming 0.25 LSUM 1.00 LSUM $4,800.00, $11,200.00 $4,800.00 43 Topsoil (undistributed) 14.00 CY 70.00 CY $40.00 $560.00 $2,800.00 44 Sod, Nursery 1703.32 SYD 2903.32 SYD $4.00 $6,813.28 $11,613.28 45 Water LSUM LSUM $1,000.00 46 Signs, Relocate 2.001 EA 1 7.00 EA $200.00 $400.00 $1,400.00 47 Mailbox, Relocate 1 8.001 EA 1 10.00 EA $150.00 $1,200.00 $1,500.00 1 48 jQC Testing /Videotaping I 0.50 LSUM 1.00 LSUM $3,000.00 $1,500.00 $3,000.00 $111,787.69 1 $383,470.17 2of2 CITY OF CARMEL Main Street Sidepath PROGRESS PAY ESTIMATE NO. 03 For work done during the period of: 12/1108 through 12/31108 TOTALS AND PAY ESTIMATE CALCULATIONS TOTAL PAY THIS ESTIMATE $111,787.69 TOTAL PAY TO DATE $383,470.17 DEDUCT 10% RETAINAGE $38,347.02 DEDUCT PREVIOUS NET PAY ESTIMATES $244,514.23 NET PAY ESTIMATE NO. 03 $100,608.92 CrossRoad Engineers, PC f Zd�v Inspecting Firm By Date Yarberry Landscape Excavating Company Gam— 5 Contractor By 'Date yAa- BCau,�/ Prescribed by State Board of Accounts ACCOUNTS PAYABLE VOUCHER City Form No. 201 (Rev. 1995) CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee 'Xardberry Landscape Excavating Purchase Order No. 9940 South 1000 West Terms Anderson, IN 46017 Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) 01/05/09 Pay App #3 Main Street Sidepath Phase 1 Gford to 4th Ave SW $100,608.92 Total I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer VOUCHER NO. WARRANT NO. ALLOWED 20 IN SUM OF 9940 South 1000 West Anderson, IN 46017 $100,608.92 ON ACCOUNT OF APPROPRIATION FOR Department of Engineering Board Members PO# or INVOICE NO. ACCT #/TITLE AMOUNT DEPT. I hereby certify that the attached invoice(s), or bill(s) is (are) true and correct and that the ay App 2200-R4462200 2 materials or services itemized thereon for which charge is made were ordered and received except 20 Signature Cost distribution ledger classification if Title claim paid motor vehicle highway fund