Loading...
171929 04/29/2009 CITY OF CARMEL, INDIANA VENDOR: 00351429 Page 1 of 1 ONE CIVIC SQUARE M.K. BETTS ENGINEERING INC CARMEL, INDIANA 46032 PO Box 2633 CHECK AMOUNT: $111,656.19 ANDERSON IN 46018 d CHECK NUMBER: 171929 CHECK DATE: 4/29/2009 D EPARTMENT ACC PO NUMBER INVOICE NUMBE R------ AMO D ESCRI PT ION 659 5023990 96,656.19 OTHER EXPENSES 659 5023990 17 15,000.00 OTHER EXPENSES APPLICATION AND CERTIFICATE FOR PAYMENT AAA DOCUiVIENT G702 onstructions on reverse side) PAGE oNF or P \c[s TO (OWNER): City of Canute]. PROJECT: Blower /Electrical Modification APPLICATION NO:Sixteen(16pistribution to: One Civic Square Contract 60 L OWNER Carmel, IN 46032 PERIOD TO: 02 28 09 L ARCHITECT 0 CONTRACTOR FRONA iCONTRACTOR): VIA (ARCHITECT): ARCHITECT'S C M. K. Betts Engineering PROJECT NO: C Contracting, Inc. CONTRACT FOR: Invoice No. 07- 262.16 CONTRACT DATE: CONTRACTOR'S APPLICATION FOR PAYMENT Continu l Sheet, for AIA Document C703,Tis below, in atttacheClconnection with the Contract. CHANGE O RDER SUMMARY 1. ORIGINAL CONTRACT SUM S 2, 349 ,000-00 I 2. Net change by Change Orders 344,347 Change Orders approved in ADDITIONS DEDUCTIONS previous months by Owner 3. CONTRACT SUM TO DATE (Line 1 2) S 2, 347.00 TOTAL 4. TOTAL COMPLETED STORED TO DATE S 2,660 Approved this Month (Column G on 6703) Number Date Approved S. RETAINAGE: a. of Completed Work S CO# 1 $302,815.00 7,610.00 (Column D E on G703) CO#2 67,282.00 $18,140.00 b. of Stored Material (Column F on 6703) Total Retainage (.Line 5a -I 5b or TOTALS I $370,097.00 $25,750.00 Total in Column I of G703) 132 Net change by Change Orders $344,347 6. TOTAL EARNED LESS RETAINAGE 2,528 The undersigned Contractor certifies that to the best of the Contractor's knowledge, (Line 4 less Line 5 Total) information and belief the Work covered by this Application for Payment has been 7. LESS PREVIOUS CERTIFICATES FOR completed in accordance with the Contract Documents, that all amounts have been PAYMENT (Line 6 from prior Certificate) S 2 ,432,033 .14 paid by the Contractor for Work for which previous Certificates for Payment were 8. CURRENT PAYMENT DUE S 96,656 .1 9__ issued and payments received from the Owner, and that current payment shown 9, BALANCE TO FINISH, PLUS RETAINAGE S 164 herein is now due. (Line 3 less Line 6) CONTRACTOR: M. K. Betts Engineering Contracting, Inc. State or: Indiana County of: Madison Subscribed and sworn to before me this 28th day of Feb. 2009 Notary Public: By: Date: February 28, 20 09 My Commission expires: October 28 201.5 AMOUNT CERTIFIED S ARCHITECT'S CERTIFICATE FOR PAYMENT (Attach explanation if certified differs from the amount applied for.) In accordance with the Contract Documents, based on on -site observations and the ARCHITE data comprising the above application, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as Bv: Date: indicated, the quality of the Work is in accordance with the Contract Documents, and This Certificate is not negotiable. The A1� t lOUN CERTIFIED is payable only to the the Contractor is entitled to payment of the AMOU`JT CERTIFIED. Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. AIA DOCUMrNI C.711? APPI ICAIIr AND C ERTIFIC \R. MR P \l'r.IF.�'T .�1, t'18t CDiTICQre AIA 1975.1 CONTINUATION SHEET AIA D G703 Carmel Contract 60 PAGE OF PP,GES AIA Document G702. APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Sixteen (16) Contractor's signed Certification is attached. APPLICATION DATE: February 28, 2009 In tabulations below, amounts are stated to the nearest dollar. PERIOD FROtA: 02 01 -09 Use Column I on Contracts where variable retainage for line items may apply. TO: 02 28 09 ARCHITECT'S PROJECT NO: A B C D E F G H I ITEM DESCRIPTION OF WORK SCHEDULED W ORK COMPLETED —TOTAL COMPLETED BALANCE RETAIN ?,GE This Application AND STORED `:o. VALUE TO FINISH Previous TO DATE IG =C1 Applications Work in Place Stored Materials tD +E +F) C —C,) (not in D or E) 1. Mobilization, Bond Insurance 75,000.00 74,000.00 500.00 -0- 74,500.00 99 500.00 2. Generator Pad Platforr 40,000.00 40,000.00 -0- -0- 40,000.00 100 -0- 3. Generator. 272,000.00 272,000.00 -0- -0- 272,000.00 100 -0- 4. Launder Covers 1.60,000.00 160,000.00 -0- -0- 160,000.00 100 -0- 5. Switch Gear. Building 39,000.00 39,000.00 -0- -0- 39,000.00 100 -0 6. Masonry 78,000.00 78,000.00 -0- -0- 78,000.00 100 -0- 7. Roo:Eing Sheetmeta.l 14,000.00 14,000.00 -0- -0- 14,000.00 100 -0- 8. Doors, Frames Hardware 1.6,000.00 16,000.00 -0- -0- 16,000.00 100 -0- 9. Aeration Tank Work 40,000.00 40,000.00 -0- -0- 40,000.00 100 -0- 90. Valves 1.0,000.00 10,000.00 -0- -0- 10,000.00 100 -0- 1.I. Blower Bldg Phase T 90,000.00 90,000.00 -0- -0- 90,000.00 100 -0- 1.2. Blower Bldg Phase TT 35,000.00 35,000.00 -0- -0- 35,000.00 100 -0- 1.3. Pipe Tnsulation 5,400.00 5,400.00 -0- -0- 5,400.00 100 -0- 1.4. Acoustical Ceilings 21,000.00 21,000.00 -0- -0- 21,000.00 100 -0- 1.5. Roll Up Doors 7,100.00 7,100.00 -0- -0- 7,100.00 100 -0- 1.6. Signs Fire Extinguishers 1,500.00 1,000.00 500.00 -0- 1,500.00 100 -0- 17. Tnstrumentati_on 90,000.00 90,000.00 -0- -0- 90,000.00 100 -0- ,11A DOCUMENT G703 CONIINL.'ATION SHEET APRIL 1978 EDITION AIA' J 1978 THE A,N'.ERiC'.N INSTITUTE OF ARCHITECTS, 1735 NEW YORK: ,AVE., N.M. WASHINGTON. D.C. 20006 G7113 —'1978 CONTINUATION SHEET AfA DOCUh1ENT 0703 Carmel Contract 60 PAGE OF P :%GES AIA Document G702. APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Sixteen (16) Contractor's signed Certification is attached. APPLICATION DATE: February 28, 2009 In tabulations below, amounts are stated to the nearest dollar. PERIOD FROM: 02 01 09 Use Column I on Contracts where variable retainage for line items may apply. TO: 02 28 09 ARCHITECT'S PROJECT NO: A B C D E F G H I W ORK COM ITEM DESCRIPTION OF WORK SCHEDULED TOTAL COMPLETED LANCE P,ET�JN: \GE VALUE This Application AND STORED TO FINISH Previous TO DATE iG =C Applications Work in Place Stored Materials (D +E +F) (C —G) (not in D or E) 1.8. Control Commissioning 56,000.00 56,000.00 -0- -0- 56,000.00 100 -0- 1.9. Software Allowance 25,000.00 7,552.58 -0- 1 -0- 7,552.58 30 17,447.42 20. HVAC 92,000.00 92,000.00 -0 0- 92,000.00 100 -0- 21., Electrical- 11,24,000.00 1092,454.00 30,546.00 -0- 1123,000.00 99 1,000.00 22. Painting 1- 3,000.00 13,000.00 -0- -0- 13,000.00 100 -0- 23. Miscellaneous 45,000.00 45,000.00 -0- -0- 45,000.00 100 -0- CO#1 Change Order No. 1 1. Eliminate EUH04,5,6 7,61.0.00 7,610.00 -0- -0- 7,610.00 100 -0- 2_. Suspended Solids Meter #10 4,992.00 4,992.00 -0- 0- 4,992.00 100 -0- 3. PMQII Meter Plant Feed 7,357.00 7,357.00 -0- -0- 7,357.00 100 -0- 4. Addition PMQII Metering 3,445.00 3,445.00 0 3,445.00 100 0- 5. Misc. Electrical Blower Building 508.00 508.00 -0- -0- 508.00 100 -0- 6. Solar Drying Supplemental bleat 282,955.00 209,620.00 59,835.00 -0- +269,455.00 95 13,500.00 7. Electrical Prat to Aeartion 1,679.00 1,485.00 194.00 -0- 1,679.00 100 -0- AIA DOCUMENT G703 CONTINUATION SHEET APRIL 1978 EDITION ,�I,A''� U 1978 THE A,ti'.ERiCAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK; AVE— N.W.. \NASHINGTON. D.C. 20006 6703 1978 CONTINUATION SHEET AIA DOCUMENT G70 PAGE OF PAGES AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Sixteen (16 Contractor's signed Certification is attached. APPLICATION DATE: February 28, 2009 In tabulations below, amounts are stated to the nearest dollar. PERIOD FROM: 02 01 09 Use Column I on Contracts where variable retainage for line items may apply. TO: 02 28 09 ARCHITECT'S PROJECT NO: 8 C D E F G I I I 11 E.'.1 DESCRIPTION OF WORK SCHEDULED WOR COMPLETED TOTAL COMPLETED BALANCE RETAINAGE VALUE This Application AND STORED n TO FINISH Previous Stored Materials TO DATE (G =C1 (C —G) Applications Work in Place (riot in D or El (D t E +F) 8. Remove Concrete Lining Aeration Tank #10 500.00 500.00 0 500.00 100 0- 9. Condenser Support Trenwa 1,185.00 1,185.00 -0 -0- 1,185.00 100 -0- 10. Metal Halide Lights Fixture "C" 194.00 194.00 -0- -0- 194.00 100 -0- CO#2 Change Order No. 2 1. Relocate existing conduit in East Digest for boiler flu 375.00 375.00 -0- -0- 375.00 100 -0- 2. Replace existing MCC unit in Return Bldg. 17,623.00 16,623.00 1,000.00 -0- 17,623.00 100 -0- 3. Install new feeds PP AT for new HVAC System. 4,200.00 3,900.00 300.00 4,200.00 100 0- 4. Deduct for Fiber Optic not installed 6,345.00 6,345.00 -0- -0- 6,345.00 100 -0- 5. Deduct for new feeds to Centrifuge Bldg. not installed 5,500.00 5,500.00 -0- -0- 5,500.00 100 -0- AIA DOCUMENT 6;113 CONTINUATION SHEET APRIL 1978 EDITION AIA'= J 1978 T 4J4 .1 n, +:'CII'1.1 I1.Ii TlT1 TC l C \rir'U—C/ TC I-JC �IC%AI V( DL IlrC 11 Inr 1•i11 iii ni r'T r,.i n r nnnr r.;n'z lv�st CONTINUATION SHEET AI DOCU G703 PA GE OF PA GES AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Contractor's signed Certification is attached. APPLICATION DATE: In tabulations below, amounts are stated to the nearest dollar. PERIOD FROM: Use Column I on Contracts where variable retainage for line items may apply. TO ARCHITECT'S PROJECT NO: A B C D E F G H I WO RK COMPLETED TOTgj 1% DESCRIPTION OF WORK SCHEDULED This Application A BALANCE RETAMAGE :o. VALUE Precious (G C) TO FINISH Applications Work in Place Stored Materials (C—G) (not in D or E) 6. Repair air leaks in Aeration Basins 2 3 1,720.00 1,720.00 -0- -0- 1,720.00 100 -0- 7. Repair baffle wall in Clarifier Tank #3 939.00 939.00 -0 -0 939.00 100 -0- 8. Install insulation on hot water piping in Solar Drying Bldg. 220.00 220.00 -0- -0- 220.00 100 -0- 9. Grade soil around generator 1,020.00 1,020.00 -0- -0- 1,020.00 100 -0- 10. Install Rotork modulating valve in Aeration Tank #6 8,825.00 8,825.00 -0- -0- 8,825.00 I00 -0- 11. Relocate 3 SSRVS for new blowers. 7,555.00 7,555.00 -0- -0- 7,555.00 100 -0- 12. Repair existing bloc on blower bI 0 11,070.00 -0- -0- 11,070.00 100 -0- 13. Omit acousti ceiling, ti. blower bldg existing ce0 5,700.00 -0- -0- 5,700.00 100 -0- AIA DOCUMENT G703 CONTINUATION SHEET APRIL 1978 EDITION AIA' 1978 (.711'4 —107R CONTINUATION SHEET AIA D OCUMENT 6703 PAGE of PAGES AIA Document 6702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Sixteen 16 Contractor's signed Certification is attached. APPLICATION DATE: February 28, 2009 In tabulations below, amounts are stated to the nearest dollar. PERIOD FROM: 02 01 09 Use Column I on Contracts where variable retainage for line items may apply. TO: 02 -28 -09 ARCHITECT'S PROJECT NO: A B C D E F G I1 I WOR COMPLETED TOTAL COMPLEI ED ITEhI DESCRIPTION OF WORK SCHEDULED This Application AND STORED BALANCE F.ETA11L1GE VALUE Previous TO DATE (G --C1 IO FINISH Applications Work in Place Stored Materials (D4- E-4-r) lC —G) (not in D or E) 14. Relocate existing filtrate pumps feed from west wall of Blower Building. 2,892.00 2,892.00 -0 0 2,892.00 100 0- 15. Replace existing homestead valves with American ball valves for supple- mental heat. 380.00 380.00 -0- -0- 380.00 100 -0- 16. Repair existing airlines in south aeration tanks. 1,327.00 1,327.00 -0- -0- 1,327.00 100 -0- 17. Omit temporary piping in blower building. 595.00 595.00 -0- -0- 595.00 100 -0- 18. Install conduit feed to Digester Bldg. 2,539.00 2,539.00 -0- -0- 2,539.00 100 -0- 19. Replace additional Digester Valves 6,597.00 2,815.81 2,781.19 -0- 6,597.00 100 0 2,693,347.0 2564,243.39 96,656.19 -0- 2660,889.58 99 32,447.42 132,210.2 AIA DOCUMENT G703 CONTINUATION SHEET APRIL 1978 EDITION AIA'n U 1978 1 978 Prescribed by State Board of Accounts City Form No. 201 (Rev 1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show, kind of service, where performed, dates of service rendered, by whom, rates per day, number of units, price per unit, etc. Payee 351429 I� M.K. BETTS ENGINEERING CONTR Purchase Order No. P.O. Box 2533 Terms Anderson, IN 46018 Due Date 4/23/2009 Invoice Invoice Description Date Number (or note attached invoice(s) or bill(s)) Amount 4/23/2009 16 $96,656.19 hereby certify that the attached invoice(s), or bill(s) is (are) true and orrect and I have audited same in accordance with IC 5- 11- 10 -1.6 Date ffi r VOUCHER 095551 WARRANT ALLOWED 351429 IN SUM OF M.K. BETTS ENGINEERING CONTR P.O. Box 2533 Anderson, IN 46018 Carmel Wastewater Utility Q N ACCOUNT OF APPROPRIATION FOR Board members PO INV ACCT AMOUNT Audit Trail Code 16 07- 1050 -61 $96,656.19 G /0 1 p Voucher Total $96,656.19 Cost distribution ledger classification if claim paid under vehicle highway fund A PPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUh 670 (Instructions on reverse side) P. P ,cEs TO (OWNERI: City of Carmel PROJECT: Blower /El-ectrical Modification. APPLICATION NO:Seventeen Distribution to: One Civic Square Contract 60 17) F. O \,VNER Carmel, IN 46032 PERIOD TO: 03 31 -09 C ARCHITECT C CONTRACTOR FROM ICONTR.ACTOR): VIA (ARCHITECT): ARCHITECT'S C M. K. Betts Engineering PROJECT NO: C Contracting, Inc. CONTRACT FOR: Invoice No. 07 -262. 17 CONTRACT DATE: CONTRACTOR'S APPLICATION FOR PAYMENT Continuatio l a ma h Document G703, is attached connection with the Contract. ed CHAN OR Change DER SUMh1ARY 1. ORIGINAL CONTRACT SUM 2, 349,000.00 Chan Orders approved in ADDITIONS DEDUCTIO I cha y B 2. Net th e b Change Orders 344,347.00 previous rnonths by Owner 3. CONTRACT SUM TO DATE (Lime 1 n 2 693.347 TOTAL 4. TOTAL COMPLETED STORED TO DATE 2 ,675,899.58 Approved this ti4onth (Column G on G703) S. RETAINAGE: Number Date Approved a. `yo of Completed \Mork C0# 1 $302,815.00 7,610.00 (Column D E on 6703) C0#2 67,282.00 $18,140.00 b. 1 of Stored Material (Column F on G703) Total Retainage (Line 5a 5b or 132,210.25 TOTALS $370,097.00 $25,750.00 Total in Column I of G7 03) 2,543,689.33 `Jet change by Change Orders $344,347 6. TOTAL EARNED LESS RETAINAGE The undersigned Contractor certifies that to the best of the Contractor's knowledge, (Line 4 less Line 5 Total) information and belies the Work covered by this Application for Payment has been 7. LESS PREVIOUS CERTIFICATES FOR completed in accordance with the Contract Documents, that all amounts have been PAYMENT (Line 6 from prior Certificate) 2 528 689 .33 paid by the Contractor for Work for which previous Certificates for Payment were 8. CURRENT PAYMENT DUE 5 15,000.00 issued and payments received from the Owner, and that current payment shown 9, BALANCE TO FINISH, PLUS RETAINAGE 149,657.67 herein is now due. (Line 3 less Line 6) CONTRAC OR: hf. K. Betts Engineering Contracting, Inc. State of: Indiana County of: Madison Subscribed and sworn to before me this 31st day of March 2009 Notary Public -<-o^ "7 BY: Date: March 31, 2009 My Commission expires: October 28 2015 AMOUNT CERTIFIED...... ARCHITECT'S CERTIFICATE FOR PAYMENT cer (Attach explanation if amoun d differs ers fr the the he amount applied for) In accordance with the Contract Documents, based on on -site observations and the ARCHIT data comprising the above application, the Architect certifies to the Owner that to the S best of the Architect's knowledge, information and belief the Work has progressed as B Date: indicated, the quality of the Work is in accordance with the Contract Documents, and This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the the Contractor is entitled to payment of the ANAOUNT CERTIFIED. Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract- %I A DOCUNA(NI I C 'I Ii .A ^)D CLRTIF ICAri. FOR P,V1 I MAY EDITION 41A' 1Nto I1it _r'u ''i iii tltl lr s4 itmCI CONTINUATION SHEET A1A DOCUh1ENT 0703 Carmel Contract 60 PAGE OF PAGES ,AIA Document 6702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Seventeen (17 Contractor's signed Certification is attached. APPLICATION DATE: March 31 2009 In tabulations below, amounts are stated to the nearest dollar. PERIOD FROM: 03 01 -09 Use COlumn I on Contracts where variable retainage for line items may apply. TO: 03 -31 -09 -\RCHITECT'S PROJECT NO: B C D E F G H I WORK COMPLETED TOTAL COMPLETED ITE :1 DESCRIPTION OF WORK SCHEDULED This Application AND STORED a BALANCE RETAINAGE VALUE Previous pp TO DATE (G TO FINISH Stored Materials (C G) Applications Work in Place (not in D or E) (D-1-E+ F) 1. Mobilization, Bond Insurance 75,000.00 74,500.00 500.00 0— 75,000.00 100 —0- 2. Generator Pad Platfory 40,000.00 40,000.00 —0— —0— 40,000.00 1 —0- 3. Generator 272,000.00 272,000.00 —0— —0— 272,000.00 100 —0- 4. Launder Covers 160,000.00 160,000.00 —0— —0— 160,000.00 100 —0- 5. Switch Gear Building 39,000.00 39,000.00 -0- -0- 39,000.00 100 -0- 6. Masonry 78,000.00 78,000.00 -0- -0- 78,000.00 100 -0- 7. Roofing Sheetmetal 14,000.00 14,000.00 —0 —0— 14,000.00 100 —0- 8 Doors Frames Hardware 16,000.00 16,000.00 —0— —0— 16,000.00 100 —0- 9. Aeration Tank Work 40,000.00 40,000.00 —0— —0— 40,000.00 100 —0- 10. Valves 1.0,000.00 10,000.00 —0— 70 10,000.00 100 —0- 11. Blower Bldg Phase 1 90,000.00 90,000.00 —0— —0— 90,000.00 100 —0- 12. Blower Bldg Phase 11 35,000,00 35,000.00 —0— —0— 35,000.00 100 —0- 13. Pipe Insulation 5,400.00 5,400.00 —0— —0— 5,400.00 100 —0- 1.4. Acoustical Ceilings 21,000.00 21,000.00 —0— —0— 21,000.00 100 —0- 15. Roll Up Doors 7,1.00.00 7,100.00 —0— —0 7,100.00 100 —0- 1.6. Signs Fire EXtiRguishers 1,500.00 1,500.00 —0— —0— 1,500.00 100 —0- 1.7. Instrumentation 90,000.00 90,000.00 —0— —0— 90,000.00 100 —0— AIA DOCUi \1ENT G703 COiNTIiNL'.�TIUN SHEET P,PRIL 191 EDITION AIA iD 1978 TFiE A.titLRIC. =.ti INSTITUTE OF ARCHITECTS, 1733 1,E\%1 YORK. AVE., N.M. WASHINGTON. D.C. 2000G G703 1978 CONTINUATION SHEET /A DOCUNIENT 0703 Carmel Contract 60 PAGE OF P: \CES Document 0702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Seventeen (17) Contractor's signed Certification is attached. APPLICATION DATE: March 31 2009 In tabulations below, amounts are stated to the nearest dollar, PERIOD FROM: 03 01 -09 Use Column I on Contracts where variable retainage for line items may apply. TO: 03 31 09 ARCHITECT'S PROJECT NO: A B C D E F G H I WORK COMPLETED TOTAL COMPLETED ITE`.1 DESCRIPTION OF WORK SCHEDULED BALANCE RETAIN. -\GE VALUE This Applica AND STORED TO FINISH Previous TO DATE G -C) Applications Work in Place Stored Materials (D +E +F) C —G) (not in D or E) 18. Control Coannissioning 56,000.00 56,000.00 -0- -0- 56,000.00 100 -0- 19. Software Allowance 25,000.00 7,552.58 -0- -0- 7,552.58 30 17,447.42 20. PVAC 92,000.00 92,000.00 0 0 92,000.00 100 0 21.. Electrical 11.24,000.00 1123,000.00 1,000.00 -0- 1124,000.00 100 -0- ?2. Painting 13,000.00 13,000.00 -0- -0- 13,000.00 100 -0- 23. Miscellaneous 45,000.00 45,000.00 -0- -0- 45,000.00 100 -0- CO#1 Change Order No. .1 1. Eliminate EUH04,5,6 7,610.00 1,610.00 -0- -0- 7,610.00 100 -0- 2. Suspended Solids Meter #10 4,992.00 4,992.00 -0- -0- 4,992.00 100 -0- 3. PMQ11 Meter Plant Feed 7,357.00 7,357.00 -0- -0- 7,357.00 100 -0- 4. Addition PMQ11 Metering 3,445.00 3,445.00 -0- -0- 3,445.00 100 -0- 5. Misc. Electrical_ Blower Building 508.00 508.00 -0- -0 508.00 100 -0- 6. Solar Drying Suppleiiiental Heat 282,955.00 +269,455.00 13,500.00 -0- +282,955.00 100 -0- 7. Electrical Prat to Aeartion f 1,679.00 1,679.00 -0- -0- 1,679.00 100 -0- AIA DOCUMENT 6703 CONTINLATIi)N SHEET APRIL 1978 EDITION I AIA'= C '1978 THE AraERIC, =.N INSTITUTE OF �,RCHITECTS, 1735 NEbV YORK AVE., N.W., VNASHINGTON, D.C. 70006 G703 1978 CONTINUATION SHEET A IA DOCUh1E 6703 PAGE OF PACES ,-\IA Document 6702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Seventeen (17 Contractor's signed Certification is attached. APPLICATION DATE: March 31, 2009 In tabulations below, amounts are stated to the nearest dollar. PERIOD FROM: 03 01 09 Use Column I on Contracts where variable retainage for line items may apply. TO: 03 31 -09 ARCHITECT'S PROJECT NO: B C D E F G H I WO RK COMPLETED TE >•I DESCRIPTION OF WORK' SCHEDULED I'OTAL COMPLETED BALANCE RETAINAGE V ALUE This Application AND STORED TO FINISH Previous 70 DATE (G -C) Applications Work in Place Stored Materials (D_K -E +E) (C —G) (not in D or E) 8. Remove Concrete Lining Aeration Tank #10 500.00 500.00 -0- -0- 500.00 100 -0- 9. Condenser Support Trenwa 1,185.00 1,185.00 -0- -0- 1,185.00 100 -0- 10. Metal Halide Lights Fixture "C" 194.00 194.00 -0- -0- 194.00 100 -0- CO#2 Change Order No. 2 1. Relocate existing conduit in East Digest for boiler flu 375.00 375.00 -0- -0- 375.00 100 -0- 2. Replace existing MCC unit in Return Bldg. 17,623.00 17,623.00 -0- -0- 17,623.00 100 -0- 3. Install new feeds PP -AT for new HVAC System. 4,200.00 4,200.00 -0- -0- 4,200.00 100 -0- 4. Deduct for Fiber Optic not installed 6,345.00 6,345.00 -0- -0 6,345.00 100 -0- 5. Deduct for new feeds to Centrifuge Bldg. not installed 5,500.00 5,500.00 -0- -0 5,500.00 100 -0- AIA DOCUMENT G703 CONTINUATION SHEET APRIL 19 -B EDITION AI A'" U 19713 G703 7978 THE'- i�.icRIC' -1 INSTITUTE OF ARCHITECTS, 1735 NE4V YORK AVE., N.W., WASHINGTON:, D.C. 26005 CONTINUATION SHEET ALA DOCUNIENl 0703 PAGE OF PAGES ,-\IA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Seventeen 17 Contractor's signed Certification is attached. APPLICATION DATE: March 31, 2009 In tabulations below, amounts are stated to the nearest dollar. PERIOD FROM: 03 01 -09 Use Column I on Contracts where Variable retainage for line items may apply. TO: 03 31 -09 ARCHITECT'S PROJECT NO: A B C D E F G H I ITE> WO COMPLETED TOTAL COMPLETED •1 DESCRIPTION OF WORK SCHEDULED This Application o, BALANCE RETAINAGE Application AND STORED VALUE TO FINISH Previous TO DATE (G =C) Applications Work in Place Stored Materials (C —G) PI (not in D or E) (D-i- E -1 -P) 6. Repair air leaks in Aeration Basins 2 3 1,720.00 1,720.00 -0- -0- 1,720.00 100 -0- 7. Repair baffle wall in Clarifier Tank #3 939.00 939.00 -0- -0- 939.00 100 -0- 8. Install insulation on hot water piping in Solar Drying Bldg. 220.00 220.00 -0- -0- 220.00 100 -0- 9. Grade soil around generator 1,020.00 1,020.00 -0- -0- 1,020.00 100 -0- 10. Install Rotork modulating valve in Aeration Tank #6 8,825.00 8,825.00 -0- -0- 8,825.00 100 -0- 11. Relocate 3 SSRVS for new blowers. 7,555.00 7,555.00 -0- -0- 7,555.00 100 -0- 12. Repair existing bloc on blower building. 11,070.00 11,070.00 -0- -0- 11,070.00 100 -0- 13. Omit acoustical ceiling, tile in blower bldg. pain existing ceiling. 5,700.00 5,700.00 -0- -0- 5,700.00 100 AIA DOCUMENT 6703 COiNTIi;L', -\ViON SHEET APRIL 19 EDITION AIA'i �J 1978 THE A,%."RICAN INSHTU T E OF ARCHITECTS, 1735 MEW YORK. AVE., N.W.. WASHINGTON, D.C. '0005 6703 —1978 CONTINUATION SHEET A/A D OCUMENT G703 PAGE OF PAGES ,AIA Document 6702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Seventeen 17 Contractor's signed Certification is attached. APPLICATION DATE: March 31, 2009 In tabulations below, amounts are stated to the nearest dollar. PERIOD FROM: 03 01 09 Use Column I on Contracts where variable retainage for line items may apply. TO: 03 09 ARCHITECT'S PROJECT NO: A B C D E F G H I WO RK COMPLETED ITE'.t DESCRIPTION OF WORK SCHEDULED rOTAL COMPLETED B,g LANCE RETAINAGE This Application AND STORED °'o VALUE Previous Stored Materials TO DATE (G =C) TO H Applic Work in Place (D +E +F) (not in D or E) 14. Relocate existing filtrate pumps feed from west wall of Blower Building. 2,892.00 2,892.00 -0- -0- 2,892.00 100 -0- 15. Replace existing homestead valves with American ball valves for supple- mental heat. 380.00 380.00 -0- -0- 380.00 100 -0- 16. Repair existing airlines in south aeration tanks. 1,327.00 1,327.00 -0- -0- 1,327.00 100 -0- 17. Omit temporary piping in blower building. 595.00 595.00 -0- -0- 595.00 100 -0- 18. Install conduit feed to Digester Bldg. 2,539.00 2,539.00 -0- -0- 2,539.00 100 -0- 19. Replace additional Digester Valves 6,597.00 6,597.00 -0- -0 6,597.00 100 -0- 2,693,347.0 2 15,000.00 0 2675,899.58 99 17,447.42 132,210.25 A14 DC)C1},ti1ENT 6703 CUiS Jl.'P,TJpN SHEET APRIL 1978 EDITION 197B THE.,At:RICP,N IPJSrITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W.. WASHINGTON, D.C. 20006 G703— '19711 Prescribed by State Board of Accounts City Form No. 201 (Rev 1995), ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show, kind of service, where performed, dates of service rendered, by whom, rates per day, number of units, price per unit, etc. Payee 351429 M.K. BETTS ENGINEERING CONTR Purchase Order No. P.O. Box 2533 Terms Anderson, IN 46018 Due Date 4/23/2009 Q Invoice Invoice Description Date Number (or note attached invoice(s) or bill(s)) Amount 4/23/2009 17 $15,000.00 hereby certify that the attached invoice(s), or bill(s) is (are) true and orrect and I have audited same in accordance with IC 5- 11- 10 -1.6 �f Date is VOUCHER 095550 WARRANT ALLOWED 351429 IN SUM OF M.K. BETTS ENGINEERING CONTR P.O. Box 2533 Anderson, IN 46018 Carmel Wastewater Utility ON ACCOUNT OF APPROPRIATION FOR Board members PO INV ACCT AMOUNT Audit Trail Code 17 07- 1050 -61 $15,000.00 Voucher Total $15,000.00 1�ost distribution ledger classification if claim paid under vehicle highway fund