HomeMy WebLinkAbout168593 02/04/2009 CITY OF CARMEL, INDIANA VENDOR: 00351429 Page 1 of 1
ONE CIVIC SQUARE M .K. BETTS ENGINEERING INC CHECK AMOUNT: $124,924.74
CARMEL, INDIANA 46032 ANDERSON IN 46018 CHECK NUMBER: 168593
CHECK DATE: 2/4/2009
DEPARTMENT ACCOUNT P NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
654 R5023990 S10726 14 124,924.74 CONSTRUCTION
I
A PPLICATION AND CERTIFICATE FOR PAYMENT AIA DOC UMENT 6 702 (Instructions on reverse side) RACE ONE OF PAGES
TO (OWNER): City of Carmel PROJECT: Blower /Electrical Modification APPLICATION NO: Fourteen( 1 Pi)stribution to:
One Civic Square Contract 60 E. OWNER
Carmel, IN 46032 PERIOD TO: 12 -31 -08 C ARCHITECT
CONTRACTOR
FROM (CONTRACTOR): VIA (ARCHITECT): ARCHITECT'S C
M. K. Betts Engineering PROJECT NO: C
Contracting, Inc..
CONTRACT FOR: Invoice No. 07 -262. 14 CONTRACT DATE:
is made CONTRACTOR'S APPLICATION FOR PAYMENT Continuation n Sheet, Doc ument G703niss att ched connection with the Contract.
CHANGE ORDER SUMMARY 1. ORIGINAL CONTRACT SUM `6 2, 349 ,000.00
Change Orders approved in I ADDITIONS DEDUCTIONS 2. Net change by Change Orders 295,205.00
previous months by Owner 3. CONTRACT SUM TO DATE (Line 1 2) 2,
TOTAL 4. TOTAL COMPLETED STORED TO DATE 2,
Approved this Month (Column G on G703)
Number Date Approved 5. RETAINAGE:
CO# 1 a. of Completed Work
$302 815.00 7,610.00 (Column D E on G703)
b. of Stored Material
(Column F on G703)
Total Retainage (Line 5a 5b or
TOTALS $302 7,610.00 Total in Column I of G 703) 132,210.25
Net than e by Change Orders $295,205.00
6. TOTAL EARNED LESS RETAINAGE 2 161 218.60
The undersigned Contractor certifies that to the best of the Contractor's knowledge, .(Line 4 less Line 5 Total)
information and belief the Work covered by this Application for Payment has been 7. LESS PREVIOUS CERTIFICATES FOR
completed in accordance with the Contract Documents, that all amounts have been PAYMENT (Line 6 from prior Certificate) 2 036 293 .86
paid by the Contractor for Work for which previous Certificates for Payment were 8. CURRENT PAYMENT DUE S 124
issued and payments received from the Owner, and that current payment shown 9. BALANCE TO FINISH, PLUS RETAINAGE 482,986.40
herein is now due. (Line 3 less Line 6)
CONTRACT M. K. Betts Engineering Contracting, Inc. State or Indiana County of: 1`ladison
Subscribed and sworn to before me this 31st day of Dec. 2008
Notary Pub Ii
Bv- Date: December 31, 2008 My Commission expires: October 28 2015
ARCH ECT'S 4 FOR PAYMENT AMOUNT CERTIFIED...... cer b
(Attach explanation i amount t cer certified d iffers iirers from rom t he amount applied roc)
In accordance with the Contract Documents, based on on -site observations and the ARCHITECT:
data comprising the above application, the Architect certifies to the Owner that to the
best of the Architect's knowledge, information and belief the Work has progressed as Bv: -Date: S
indicated, the quality of the Work is in accordance with the Contract Documents, and This Certificate is not negotiable. The AINIOUNT CERTIFIED is payable only to the
the Contractor is entitled to payment or the AMOUNT CERTIFIED. Contractor named herein. Issuance payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract.
AIA DOCUMENT 6702 .-�PPLICATK-N AND CERTIFICATE. FOR PAY.VE,N'T AWAY NHi EDITION .AIA' c 1981
THE vCTlri:lr r iF :R( HIIF(:T'; t'; l°. aiw �.•F`;I:I .,'.nr:GTi7 U i �iu i,. (,711"3 19ti1
CONTINUATION SHEET AIA D OCU M E NT 0703 Ca rmel Contract 6 0 PAGE OF PAGES
AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Fourteen 14)
Contractor's signed Certification is attached. APPLICATION DATE: December 31 2008
In tabulations below, amounts are stated to the nearest dollar. PERIOD FROM: 12 -01 -08
Use Column I on Contracts where variable retainage for line items may apply. TO: 12 31
ARCHITECT'S PROJECT NO:
A B C D E F G H I
WORK COMPLETED T OTAL COMPLETED
ITE,tiI DESCRIPTION OF WORK SCHEDULED This Application lication AND STORED BALANCE RE7AINAGE
^:o. VALUE TO FINISH
Previous TO DATE (G =C)
Applications Work in Place Stored Materials (D +E+F) (C —G)
(not in D or E)
1. Mobilization, Bond
Insurance 75,000.00 68,000.00 5,000.00 -0- 73,000.00 98 2,000.00
2. Generator Pad Platfori 40,000.00 40,000.00 -0- -0- 40,000.00 100 -0-
3. Generator 272,000.00 272,000.00 -0- -0- 272,000.00 100 -0-
4. Launder Covers 160,000.00 160,000.00 -0- -0- 160,000.00 100 -0-
5. Switch Gear Building 39,000.00 39,000.00 -0- -0- 39,000.00 100 -0-
6. Masonry 78,000.00 61,800.00 16,200.00 -0- 78,000.00 100 -0-
7. Roofing Sheetmetal 14,000.00 14,000.00 -0- -0- 14,000.00 100 -0-
8. Doors, Frames
Hardware 16,000.00 16,000.00 -0- -0- 16,000.00 100 -0-
9. Aeration Tank Work 40,000.00 40,000.00 -0- -0- 40,000.00 100 -0-
10. Valves 1.0,000.00 10,000.00 -0- -0- 10,000.00 100 -0-
11.. Blower Bldg Phase 1 90,000.00 90,000.00 -0- -0- 90,000.00 100 -0-
1.2. Blower Bldg Phase 11 35,000.00 6,128.26 27,871.74 -0- 34,000.00 98 1,000.00
1.3. Pipe Insulation 5,400.00 -0- -0- -0- -0- 00 5,400.00
14. Acoustical Ceilings 21,000.00 -0- -0- -0- -0- 00 21,000.00
1.5. Roll Up Doors 7,100.00 2,367.00 4,733.00 -0- 7,100.00 100 -0-
16. Signs Fire
Extinguishers 1,500.00 70- -0- -0- -0- 00 1,500.00
17. Instrumentation 90,000.00 23,121.30 -0- -0- 23,121.30 26 66,878.70
AIA DOCUMENT G703 CONTINUATION SHEET APRIL 1978 EDITION AIA' U 1978
THE Ati', RICAN INSTITUTE OF ARCH4TECTS, 1735 NE� YORK: AVE., N.W.. WASHINGTON. D.C. 23006 G703 1978
•.r
t'
CONTINUATION SHEET AIA DOCUME 0703 Carmel Contract 60 PAGE OF P AGES
AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Fourteen 14)
Contractor's signed Certification is attached. APPLICATION DATE: December 31, 2008
In tabulations below, amounts are stated to the nearest dollar. PERIOD FROM: 12 -01 -08
Use Column I on Contracts where variable retainage for line items may apply. TO: 12 31 08
ARCHITECT'S PROJECT NO:
A B C D E F G H I
WO COMPLETED TOTAL COMPLETED
ITEM DESCRIPTION OF WORK SCHEDULED This Application AND STORED /o BALANCE RETAINAGE
`:o. VALUE Previous TO DATE (G G C) TO FINISH
Applications Work in Place Stored Materials (D +E +F) C —G)
(not inlD or E)
18, Control Commissioning 56,000.00 -0- 0 0 -0- 00 56,000.00
19. Software Allowance 25,000.00 7,552.58 -0- -0- 7,552.58 31 17,447.42
20. HVAC 92,000.00 80,333.00 -0= -0- 80,333.00 88 11,667.00
21. Electrical 1124,000.00 1022,453.97 38,500.00 -0- ,060,953.97 95 63,046.03
22. Painting 13,000.00 8,684.00 -0- -0- 8,684.00 67 4,316.00
23. Miscellaneous 45,000.00 29,000.00 10,500.00 -0- 39,500.00 88 5,500.00
CO#1 Change Order No. 1
1. Eliminate EUH04,5,6 7,61.0.00 7,610.00 -0- -0- 7 100 -0-
2. Suspended Solids
Meter 110 4,992.00 4,500.00 -0- -0- 4,500.00 91 492.00
3. PMQII Meter Plant
Feed 7,357.00 7,357.00 -0- -0- 7,357.00 100 -0-
4. Addition PMQII
Metering 3,445.00 3,445.00 -0- -0- 3,445.00 100 0
5. Misc. Electrical
Blower Building 508.00 508.00 -0- =0- 508.00 100 -0-
6. Solar Drying
Supplemental Heat 282,955.00 166,500.00 22,120.00 -0- +188,620.00 67 94,335.00
7. Electrical Prat to
Aeartion 1,679.00 1,485.00 -0- -0- 1,485.00 89 194.00
AIA DOCUMENT G703 CONTINUATION SHEET APRIL 3978 EDITION AIA'� CU 1978
THE A,t'.ERIC'.N INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W.. WASHINGTON, D.C. 1 _0006 G703 1978
CONTINUATION SHEET AIA DOCUMENT G7 PAGE OF P AGES
AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: Fourteen (14)
Contractor's signed Certification is attached. APPLICATION DATE: December 31 2008
In tabulations below, amounts are stated to the nearest dollar. PERIOD FROM: 12 -01 -08
Use Column I on Contracts where variable retainage for line items may apply. TO: 12 31 -08
ARCHITECT'S PROJECT NO:
A B C D E F G H I
ITEM DESCRIPTION OF WORK SCHEDULED WORK COMPLETED TOTAL COMPLETED This Application AND STORED ea BALANCE RETAINAGE
o. VALUE Previous TO DATE jG C TO FINISH
Applications Work in Place Stored Materials Ip +E +Fl (C—G)
(not in D or E)
8. Remove Concrete
Lining Aeration
Tank #10 500.00 500.00 -0- -0 500.00 100 -0-
9. Condenser Support
Trenwa 1,185.00 1,185.00 -0- -0- 1,185.00 100 -0-
10. Metal Halide Lights
Fixture "C" 194.00 194.00 -0- -0 194.00 100 -0-
2644,205.00 2168,504.11 124,924.74 -0- 2293,428.85 87 350,776.15 132,210.2
AIA DOCUMENT G703 CONTINUATION SHEET APRIL 1978 EDITION AIA'' U 1978
THE A,.;ERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 2000, G703 1978
Prescribd by (Rev. Fi ACCOUNTS PAYABLE VOUCHER
rm N 301 1995)
TO
ADDRESS
Invoice Date Invoice Number Item Amount
I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and that the materials or services
itemized thereon for which charge is made were ordered and received except
,19
Signature Title
I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance
with IC 5- 11- 10 -1.6.
19
i r Title
J r
Voucher No. Warrant No.
ACCOUNTS PAYABLE DETAILED ACCOUNTS
SANITATION DEPARTMENT ACCT.
CARMEL, INDIANA No.
Favor Of
Total Amount of Voucher
Deducti ns
Amount of Warrant
Month of 19
Acct.
VOUCHER RECORD No.
Collection System
Operation
Plant
Commercial
General
Undistributed Ir
Construction
Depreciation Reserve
Stock Accounts Merchandise
Total
Allowed
Board Members
Filed
ROYCE FORMS •SYSTEMS 1- 800 -382 -8702 325