HomeMy WebLinkAboutDrainage ReportDrainage Design Report
for
Meridian Main Phase 1, Lot 2 INDOT Revisions
Carmel, Indiana
Prepared for:
Meridian 131, LLC
6100 West 96th Street
Indianapolis, IN 46278
March 15, 2012
Cent' -d by:
5
David A. Lach, PE
INDIANA PE 10000126
PE 10000126
9'• STATE OF
�''`jJ SfONAtE
JJJJ JJIIII iitN�
Crape
Architects Engineers
Solutions by Design Since 1937
3939 Priority Way South Drive, Suite 400 Indianapolis, Indiana 46240 Telephone 317 844 6777 Facsimile 317 706 6464
www.crine.biz
RC: 060384 -20320
DRAINAGE DESIGN REPORT FOR
LOT 2 INDOT REVISIONS
MERIDIAN MAIN PHASE I
TABLE OF CONTENTS
1.0 Introduction 2
1.1 Project Description 2
1.2 Scope of Report 2
1.3 Existing Conditions 2
2.0 Pre developed Conditions 3
2.1 Pre developed Site Conditions Allowable Release Rates 3
3.0 Post Developed Drainage Analysis 3
3.1 Post developed Basin Onsite Pond 1 3
4.0 Comparison of Post Developed Peak Discharge and Allowable Release
Rates 4
5.0 Water Quality Analysis 4
5.1 Post Construction Stormwater Quality Measures 4
6.0 Conclusions 5
APPENDICIES
Appendix A Drainage Analysis
Appendix B Water Quality Analysis
Appendix C Approved Drainage Design Report for
131st Street and US 31 Infrastructure
1.0 Introduction
This drainage report outlines the impacts and modifications to the storm water
management system to serve Meridian Main, Phase 1, Lot 2 due to the
proposed intersection improvement at Main Street and US 31. The proposed
intersection improvement will require additional right of way including land from
the southeast corner of Meridian Main, Phase 1, Lot 2.
The proposed additional right of way impacts the existing detention design for
Meridian Main, Phase 1. The detention was developed as part of the master
plan and was governed by the Hamilton County Stormwater Ordinance. The City
of Carmel Stormwater Technical Standards Manual was used for the storm
sewer hydraulic calculations and the water quality design.
1.1 Project Description
The proposed project will consist of modifications to the stormwater infiltration/
detention storage at Pond 1 of Meridian Main Phase 1, including providing
additional storage, modifying grading, provision of new outlet structure at the
pond.
1.2 Scope of Report
This report summarizes the stormwater management system as a result of the
INDOT project at US31 and Main Street for the proposed development and the
impacts to the proposed master plan.
1.3 Existing Conditions
The proposed site is located within the Meridian Main Office Park, Phase 1, Lot
2. The site is located in B6/ US31 Corridor Overlay and part of the Meridian
Main master plan and drains to the stormwater infiltration /detention basins
located to the west.
The adjoining properties zoning consist of the following:
East: Pennsylvania Way (Private Drive) and Proposed Lot 1
South: Main Street
West: US 31 and US31 Corridor Overlay
North: B6/ US 31 Corridor Overlay
The soils maps from the US Department of Agriculture, Soil Conservation
Service identifies the proposed site to consist of Crosby Silt loam (CrA).
O: \2006 \060384 \20320 \d ocs\ Eng r \R eports \dra in ag e\ Report_Dra in a ge_2012- 03 -16. d oc
2
The Firm map panel number 18057CO207F dated February 19, 2003, indicate
that the site lies in Flood Zone "X These areas are considered to be outside of
the 500 year floodplain.
2.0 Pre developed Conditions
2.1 Pre developed Site Conditions Allowable Release Rates
The allowable release rates have been determined as part of the master plan for
the Meridian Main development. The infiltration /detention basins were set
using the Hamilton County Stormwater Ordinance guidelines and the surveyor's
office request via comment letter of 0.1 cfs /acre for 10 year and 0.3 cfs /acre for
100 year stormwater release rate. The area used to establish the allowable
release rate was the watershed area associated with the J.R. Collins Regulated
Drain. The outlet for this watershed is an existing culvert under US 31. Based
on the 16.11 acres draining to this point, the allowable release rates were
calculated to be 1.61 cfs and 4.83 cfs for the 10 -year and 100 -year respectively.
See Appendix C for additional information.
PondPack was used to analyze the multiple detention /infiltration basins on this
site. The master planned network consists of three basins. These ponds were
modeled as an inter connected pond network model that accounted for the head
and tail water conditions. The watershed areas for each of the basins can be
found in Appendix B of the approved Drainage Design Report for 131 Street and
US 31 Infrastructure (Appendix C). The proposed construction of the intersection
improvement 1 is part of Onsite Pond1 basin. The master planned onsite pondl
basin is approximately 10.86 acres with a curve number of 90.1.
3.0 Post Developed Drainage Analysis
The post developed drainage analysis for the proposed construction consists of
an enclosed storm sewer network and the impact on the existing
detention /infiltration basins.
3.1 Post developed Basin Onsite Pond1
The proposed intersection improvement at US 31 and Main Street requires
additional right of way that cuts into Pond 1 of the stormwater management
system. The post developed onsite pondl basin resulting from Lot1 and Lot 2
modifications is approximately 10.82 acres with a curve number of 90.7. Note
the minor decrease in size of Onsite Pond1 basin is due to previous construction
of Lot 4. See Appendix A for additional information.
The site was analyzed under the condition that the reduced pond volume would
be replaced and provided as underground detention at Lot 2. Under this
O:\ 2006\ 060384 \20320 \docs \Engr \Reports \dra inage \Report_Dra inage_2012- 03 -16. doc
3
condition, the onsite pondl basin remains at 10.82 acres with a curve number of
90.7. Under this alternative, Pond 1 has a maximum pond volume of 3.23 ac -ft at
the 100 -yr elevation.
See Appendix A for additional information.
4.0 Comparison of Post Developed Peak Discharge and
Allowable Release Rates
The following summary compares the total stormwater discharge from the
detention /infiltration basins from the post developed site to the allowable release
rates determined by the pre developed conditions.
This table shows that the total release from the site is less than the allowable
release rate as dictated by the Hamilton County Drainage Ordinance as well as
exceeds the previous approved stormwater master plan of overall area prepared
by Schneider, which the allowable release rates were higher than current
ordinance. (Refer to Appendix H of the approved Drainage Design Report for
131 Street and US 31 Infrastructure located in Appendix C).
5.0 Water Quality Analysis
5.1 Post Construction Stormwater Quality Measures
The Stormwater quality treatment system for this project consists a treatment
train of a mechanical BMP or other stormwater quality treatment for each lot as it
is developed and the detention /infiltration basins which have been sized for the
entire development. The detention /infiltration basins shall provide both water
quality treatment and quantity performance (detention) based on the entire
developments contributing watershed. This system complies with the design
criteria presented in the City of Carmel Stormwater Technical Standards Manual
and the Hamilton County Drainage Ordinance.
See Appendix B for additional information as related to water quality.
O: \2006 \060384 \20320 \d ocs\ Eng r \R eports \dra in ag e\ Report_Dra in a ge_2012- 03 -16. d oc
4
Allowable Release
Rate
From Master Plan
Proposed Release
Rate
(cfs)
Site 10 -year
1.61
1.47
Site 100 -year
4.83
4.67
condition, the onsite pondl basin remains at 10.82 acres with a curve number of
90.7. Under this alternative, Pond 1 has a maximum pond volume of 3.23 ac -ft at
the 100 -yr elevation.
See Appendix A for additional information.
4.0 Comparison of Post Developed Peak Discharge and
Allowable Release Rates
The following summary compares the total stormwater discharge from the
detention /infiltration basins from the post developed site to the allowable release
rates determined by the pre developed conditions.
This table shows that the total release from the site is less than the allowable
release rate as dictated by the Hamilton County Drainage Ordinance as well as
exceeds the previous approved stormwater master plan of overall area prepared
by Schneider, which the allowable release rates were higher than current
ordinance. (Refer to Appendix H of the approved Drainage Design Report for
131 Street and US 31 Infrastructure located in Appendix C).
5.0 Water Quality Analysis
5.1 Post Construction Stormwater Quality Measures
The Stormwater quality treatment system for this project consists a treatment
train of a mechanical BMP or other stormwater quality treatment for each lot as it
is developed and the detention /infiltration basins which have been sized for the
entire development. The detention /infiltration basins shall provide both water
quality treatment and quantity performance (detention) based on the entire
developments contributing watershed. This system complies with the design
criteria presented in the City of Carmel Stormwater Technical Standards Manual
and the Hamilton County Drainage Ordinance.
See Appendix B for additional information as related to water quality.
O: \2006 \060384 \20320 \d ocs\ Eng r \R eports \dra in ag e\ Report_Dra in a ge_2012- 03 -16. d oc
4
6.0 Conclusions
The proposed storm drainage system complies with the criteria stated in the City
of Carmel Stormwater Technical Standards Manual and the Hamilton County
Drainage Ordinance for detention and water quality.
O:\ 2006\ 060384\ 20320 \d ocs\ Engr \R eports \dra in ag e\ Report_Dra in a ge_2012- 03 -16. doc
5
Appendix A
Post Developed Drainage
ZONING
BASINSLOT 1, BUILDING 1 STORM
BASINSLOT 1, BUILDING 1 STORM
Job File: O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
Rain Dir: O:\2006\060384\20320\calcs\Engr\Detention\Prelim\
==========================
JOB TITLE
==========================
Project Date: 3/15/2012
Project Engineer: S. Farny Updated J. Lasch
Project Title: Meridian and Main INDOT Revisions
Project Comments:
06038420320
Masterplan Revised for INDOT Revision (and Lot 1)
ALT 2 - Additional storage provided on Lot2
Additional Storage in
Underground Detention
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Table of Contents i
Table of Contents
********************** MASTER SUMMARY **********************
Watershed....... Master Network Summary ............. 1.01
*************** NETWORK SUMMARIES (DETAILED) ***************
Watershed....... Dev 10
Executive Summary (Nodes) .......... 2.01
Watershed....... Dev100
Executive Summary (Nodes) .......... 2.02
****************** DESIGN STORMS SUMMARY *******************
Hamilton County Design Storms ...................... 3.01
********************** TC CALCULATIONS *********************
OFFSITE CHURCH.. Tc Calcs ........................... 4.01
OFFSITE R/W..... Tc Calcs ........................... 4.03
ONSITE_POND2.... Tc Calcs ........................... 4.05
ONSITE_POND3.... Tc Calcs ........................... 4.07
ONSITE_POND_1... Tc Calcs ........................... 4.09
********************** CN CALCULATIONS *********************
OFFSITE CHURCH.. Runoff CN-Area ..................... 5.01
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Table of Contents ii
Table of Contents (continued)
OFFSITE R/W..... Runoff CN-Area ..................... 5.02
ONSITE_POND2.... Runoff CN-Area ..................... 5.03
ONSITE_POND3.... Runoff CN-Area ..................... 5.04
ONSITE_POND_1... Runoff CN-Area ..................... 5.05
*********************** POND VOLUMES ***********************
POND_NO. 2...... Vol: Elev-Area ..................... 6.01
POND_NO.1....... Vol: Elev-Volume ................... 6.02
POND_NO.3....... Vol: Elev-Area ..................... 6.03
******************** OUTLET STRUCTURES *********************
CENTSOUTHCONNECT E-Q-TW Series ...................... 7.01
NorthCentConnect Outlet Input Data .................. 7.05
Pondout......... Outlet Input Data .................. 7.08
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Master Network Summary Page 1.01
Name.... Watershed
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
MASTER DESIGN STORM SUMMARY
Network Storm Collection: Hamilton County
Total
Depth Rainfall
Return Event in Type RNF ID
------------ ------ ---------------- ----------------
Dev 10 3.8300 Synthetic Curve Hamilton County
Dev100 6.4600 Synthetic Curve Hamilton County
-------------------------------
ICPM CALCULATION TOLERANCES
-------------------------------
Target Convergence= .000 cfs +/-
Max. Iterations = 35 loops
ICPM Time Step = .0500 hrs
Output Time Step = .0500 hrs
ICPM Ending Time = 25.6000 hrs
-------------------------------
MASTER NETWORK SUMMARY
SCS Unit Hydrograph Method
(*Node=Outfall; +Node=Diversion;)
(Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt)
Max
Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage
Node ID Type Event ac-ft Trun hrs cfs ft ac-ft
----------------- ---- ------ ---------- -- --------- -------- -------- ------------
*HAMILTON XING JCT 10 1.198 14.5000 1.47
*HAMILTON XING JCT 100 3.996 14.4500 4.67
OFFSITE CHURCH AREA 10 .100 12.2000 .42
OFFSITE CHURCH AREA 100 .202 12.2000 .85
OFFSITE R/W AREA 10 .339 12.0000 1.65
OFFSITE R/W AREA 100 .618 11.9500 2.87
ONSITE_POND2 AREA 10 .704 12.0000 3.53
ONSITE_POND2 AREA 100 1.316 12.0000 6.27
Peak Release Rate for Pond No.1
10-yr = 1.47 cfs < 1.61 cfs allowable
100-yr = 4.67 cfs < 4.83 cfs allowable
Max. 100-yr wsel = 870.98 = Master Plan 870.98'
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Master Network Summary Page 1.02
Name.... Watershed
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
-------------------------------
ICPM CALCULATION TOLERANCES
-------------------------------
Target Convergence= .000 cfs +/-
Max. Iterations = 35 loops
ICPM Time Step = .0500 hrs
Output Time Step = .0500 hrs
ICPM Ending Time = 25.6000 hrs
-------------------------------
MASTER NETWORK SUMMARY
SCS Unit Hydrograph Method
(*Node=Outfall; +Node=Diversion;)
(Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt)
Max
Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage
Node ID Type Event ac-ft Trun hrs cfs ft ac-ft
----------------- ---- ------ ---------- -- --------- -------- -------- ------------
ONSITE_POND3 AREA 10 1.684 12.0000 8.44
ONSITE_POND3 AREA 100 3.148 12.0000 15.01
ONSITE_POND_1 AREA 10 2.574 12.0000 13.09
ONSITE_POND_1 AREA 100 4.877 12.0000 23.52
POND_NO. 2 POND 10 1.124 12.0000 3.92
POND_NO. 2 POND 100 2.632 12.0000 7.51
POND_NO. 2 OUT POND 10 .604 12.1500 2.17 869.33 .298
POND_NO. 2 OUT POND 10 .000 .0000 .00 (-Q)
POND_NO. 2 OUT POND 100 1.727 11.6500 4.06 871.01 .769
POND_NO. 2 OUT POND 100 -.007 12.2000 -.66 (-Q)
POND_NO.1 POND 10 3.617 12.0000 16.96
POND_NO.1 POND 100 7.417 11.6500 30.51
POND_NO.1 OUT POND 10 1.198 14.5000 1.47 869.25 1.899
POND_NO.1 OUT POND 100 3.996 14.4500 4.67 870.98 3.323
POND_NO.3 IN POND 10 1.684 12.0000 8.44
POND_NO.3 IN POND 100 3.148 12.0000 15.01
POND_NO.3 OUT POND 10 .420 13.4000 .82 875.02 .956
POND_NO.3 OUT POND 100 1.353 13.4000 1.46 876.66 1.850
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Executive Summary (Nodes) Page 2.01
Name.... Watershed Event: 10 yr
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
Storm... Hamilton County Tag: Dev 10
NETWORK SUMMARY -- NODES
(Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt)
DEFAULT Design Storm File,ID = Hamilton County
Storm Tag Name = Dev 10
--------------------------------------------------------------------
Data Type, File, ID = Synthetic Storm Hamilton County
Storm Frequency = 10 yr
Total Rainfall Depth= 3.8300 in
Duration Multiplier = 1
Resulting Duration = 24.0000 hrs
Resulting Start Time= .0000 hrs Step= 1.2000 hrs End= 24.0000 hrs
-------------------------------
ICPM CALCULATION TOLERANCES
-------------------------------
Target Convergence= .000 cfs +/-
Max. Iterations = 35 loops
ICPM Time Step = .0500 hrs
Output Time Step = .0500 hrs
ICPM Ending Time = 25.6000 hrs
-------------------------------
HYG Vol Qpeak Qpeak Max WSEL
Node ID Type ac-ft Trun. hrs cfs ft
----------------- ---- ---------- -- --------- -------- ---------
Outfall HAMILTON XING JCT 1.198 14.5000 1.47
OFFSITE CHURCH AREA .100 12.2000 .42
OFFSITE R/W AREA .339 12.0000 1.65
ONSITE_POND2 AREA .704 12.0000 3.53
ONSITE_POND3 AREA 1.684 12.0000 8.44
ONSITE_POND_1 AREA 2.574 12.0000 13.09
POND_NO. 2 POND 1.124 12.0000 3.92
POND_NO. 2 OUT POND .604 12.1500 2.17 869.33
POND_NO.1 POND 3.617 12.0000 16.96
POND_NO.1 OUT POND 1.198 14.5000 1.47 869.25
POND_NO.3 IN POND 1.684 12.0000 8.44
POND_NO.3 OUT POND .420 13.4000 .82 875.02
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Executive Summary (Nodes) Page 2.02
Name.... Watershed Event: 100 yr
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
Storm... Hamilton County Tag: Dev100
NETWORK SUMMARY -- NODES
(Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt)
DEFAULT Design Storm File,ID = Hamilton County
Storm Tag Name = Dev100
--------------------------------------------------------------------
Data Type, File, ID = Synthetic Storm Hamilton County
Storm Frequency = 100 yr
Total Rainfall Depth= 6.4600 in
Duration Multiplier = 1
Resulting Duration = 24.0000 hrs
Resulting Start Time= .0000 hrs Step= 1.2000 hrs End= 24.0000 hrs
-------------------------------
ICPM CALCULATION TOLERANCES
-------------------------------
Target Convergence= .000 cfs +/-
Max. Iterations = 35 loops
ICPM Time Step = .0500 hrs
Output Time Step = .0500 hrs
ICPM Ending Time = 25.6000 hrs
-------------------------------
HYG Vol Qpeak Qpeak Max WSEL
Node ID Type ac-ft Trun. hrs cfs ft
----------------- ---- ---------- -- --------- -------- ---------
Outfall HAMILTON XING JCT 3.996 14.4500 4.67
OFFSITE CHURCH AREA .202 12.2000 .85
OFFSITE R/W AREA .618 11.9500 2.87
ONSITE_POND2 AREA 1.316 12.0000 6.27
ONSITE_POND3 AREA 3.148 12.0000 15.01
ONSITE_POND_1 AREA 4.877 12.0000 23.52
POND_NO. 2 POND 2.632 12.0000 7.51
POND_NO. 2 OUT POND 1.727 11.6500 4.06 871.01
POND_NO. 2 OUT POND -.007 12.2000 -.66 (-Q)
POND_NO.1 POND 7.417 11.6500 30.51
POND_NO.1 OUT POND 3.996 14.4500 4.67 870.98
POND_NO.3 IN POND 3.148 12.0000 15.01
POND_NO.3 OUT POND 1.353 13.4000 1.46 876.66
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Design Storms Page 3.01
Name.... Hamilton County
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\
Title... Project Date: 3/15/2012
Project Engineer: S. Farny Updated J. Lasch
Project Title: Meridian and Main INDOT Revisions
Project Comments:
06038420320
Masterplan Revised for INDOT Revision (and Lot 1)
ALT 2 - Additional storage provided on Lot2
DESIGN STORMS SUMMARY
Design Storm File,ID = Hamilton County
Storm Tag Name = Dev 10
----------------------------------------------------------------------
Data Type, File, ID = Synthetic Storm Hamilton County
Storm Frequency = 10 yr
Total Rainfall Depth= 3.8300 in
Duration Multiplier = 1
Resulting Duration = 24.0000 hrs
Resulting Start Time= .0000 hrs Step= 1.2000 hrs End= 24.0000 hrs
Storm Tag Name = Dev100
----------------------------------------------------------------------
Data Type, File, ID = Synthetic Storm Hamilton County
Storm Frequency = 100 yr
Total Rainfall Depth= 6.4600 in
Duration Multiplier = 1
Resulting Duration = 24.0000 hrs
Resulting Start Time= .0000 hrs Step= 1.2000 hrs End= 24.0000 hrs
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Tc Calcs Page 4.01
Name.... OFFSITE CHURCH
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
TIME OF CONCENTRATION CALCULATOR
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
------------------------------------------------------------------------
Segment #1: Tc: User Defined
Segment #1 Time: .1670 hrs
------------------------------------------------------------------------
Segment #2: Tc: TR-55 Sheet
Mannings n .2400
Hydraulic Length 300.00 ft
2yr, 24hr P 2.6600 in
Slope .010000 ft/ft
Avg.Velocity .10 ft/sec
Segment #2 Time: .8289 hrs
------------------------------------------------------------------------
=========================
Total Tc: .9959 hrs
=========================
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Tc Calcs Page 4.02
Name.... OFFSITE CHURCH
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
------------------------------------------------------------------------
Tc Equations used...
------------------------------------------------------------------------
==== User Defined ======================================================
Tc = Value entered by user
Where: Tc = Time of concentration
==== SCS TR-55 Sheet Flow ==============================================
Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4))
Where: Tc = Time of concentration, hrs
n = Mannings n
Lf = Flow length, ft
P = 2yr, 24hr Rain depth, inches
Sf = Slope, %
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Tc Calcs Page 4.03
Name.... OFFSITE R/W
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
TIME OF CONCENTRATION CALCULATOR
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
------------------------------------------------------------------------
Segment #1: Tc: User Defined
Segment #1 Time: .1670 hrs
------------------------------------------------------------------------
=========================
Total Tc: .1670 hrs
=========================
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Tc Calcs Page 4.04
Name.... OFFSITE R/W
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
------------------------------------------------------------------------
Tc Equations used...
------------------------------------------------------------------------
==== User Defined ======================================================
Tc = Value entered by user
Where: Tc = Time of concentration
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Tc Calcs Page 4.05
Name.... ONSITE_POND2
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
TIME OF CONCENTRATION CALCULATOR
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
------------------------------------------------------------------------
Segment #1: Tc: User Defined
Segment #1 Time: .1670 hrs
------------------------------------------------------------------------
=========================
Total Tc: .1670 hrs
=========================
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Tc Calcs Page 4.06
Name.... ONSITE_POND2
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
------------------------------------------------------------------------
Tc Equations used...
------------------------------------------------------------------------
==== User Defined ======================================================
Tc = Value entered by user
Where: Tc = Time of concentration
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Tc Calcs Page 4.07
Name.... ONSITE_POND3
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
TIME OF CONCENTRATION CALCULATOR
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
------------------------------------------------------------------------
Segment #1: Tc: User Defined
Segment #1 Time: .1670 hrs
------------------------------------------------------------------------
=========================
Total Tc: .1670 hrs
=========================
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Tc Calcs Page 4.08
Name.... ONSITE_POND3
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
------------------------------------------------------------------------
Tc Equations used...
------------------------------------------------------------------------
==== User Defined ======================================================
Tc = Value entered by user
Where: Tc = Time of concentration
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Tc Calcs Page 4.09
Name.... ONSITE_POND_1
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
TIME OF CONCENTRATION CALCULATOR
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
------------------------------------------------------------------------
Segment #1: Tc: User Defined
Segment #1 Time: .1670 hrs
------------------------------------------------------------------------
=========================
Total Tc: .1670 hrs
=========================
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Tc Calcs Page 4.10
Name.... ONSITE_POND_1
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
------------------------------------------------------------------------
Tc Equations used...
------------------------------------------------------------------------
==== User Defined ======================================================
Tc = Value entered by user
Where: Tc = Time of concentration
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Runoff CN-Area Page 5.01
Name.... OFFSITE CHURCH
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
RUNOFF CURVE NUMBER DATA
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
--------------------------------------------------------------------------
Impervious
Area Adjustment Adjusted
Soil/Surface Description CN acres %C %UC CN
-------------------------------- ---- --------- ----- ----- ------
impervious 98 .180 98.00
grass 80 .320 80.00
COMPOSITE AREA & WEIGHTED CN ---> .500 86.48 (86)
:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Runoff CN-Area Page 5.02
Name.... OFFSITE R/W
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
RUNOFF CURVE NUMBER DATA
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
--------------------------------------------------------------------------
Impervious
Area Adjustment Adjusted
Soil/Surface Description CN acres %C %UC CN
-------------------------------- ---- --------- ----- ----- ------
Impervious 98 .970 98.00
Grass 80 .320 80.00
COMPOSITE AREA & WEIGHTED CN ---> 1.290 93.53 (94)
:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Runoff CN-Area Page 5.03
Name.... ONSITE_POND2
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
RUNOFF CURVE NUMBER DATA
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
--------------------------------------------------------------------------
Impervious
Area Adjustment Adjusted
Soil/Surface Description CN acres %C %UC CN
-------------------------------- ---- --------- ----- ----- ------
IMPERVIOUS 98 1.860 98.00
GRASS 80 1.000 80.00
COMPOSITE AREA & WEIGHTED CN ---> 2.860 91.71 (92)
:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Runoff CN-Area Page 5.04
Name.... ONSITE_POND3
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
RUNOFF CURVE NUMBER DATA
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
--------------------------------------------------------------------------
Impervious
Area Adjustment Adjusted
Soil/Surface Description CN acres %C %UC CN
-------------------------------- ---- --------- ----- ----- ------
impervious 98 4.450 98.00
grass 80 2.390 80.00
COMPOSITE AREA & WEIGHTED CN ---> 6.840 91.71 (92)
:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Runoff CN-Area Page 5.05
Name.... ONSITE_POND_1
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
RUNOFF CURVE NUMBER DATA
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
--------------------------------------------------------------------------
Impervious
Area Adjustment Adjusted
Soil/Surface Description CN acres %C %UC CN
-------------------------------- ---- --------- ----- ----- ------
additional lot 80 1.520 80.00
impervious 98 6.440 98.00
grass 80 2.860 80.00
COMPOSITE AREA & WEIGHTED CN ---> 10.820 90.71 (91)
:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
Use Onsite-Pond1 as proposed for future build out (master planned)
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Vol: Elev-Area Page 6.01
Name.... POND_NO. 2
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
Elevation Planimeter Area A1+A2+sqr(A1*A2) Volume Volume Sum
(ft) (sq.in) (acres) (acres) (ac-ft) (ac-ft)
------------------------------------------------------------------------
867.50 ----- .0000 .0000 .000 .000
867.75 ----- .0835 .0835 .007 .007
868.00 ----- .1524 .3487 .029 .036
868.50 ----- .1822 .5012 .084 .120
869.00 ----- .2124 .5913 .099 .218
870.00 ----- .2736 .7271 .242 .460
871.00 ----- .3360 .9128 .304 .765
872.00 ----- .4000 1.1026 .368 1.132
POND VOLUME EQUATIONS
* Incremental volume computed by the Conic Method for Reservoir Volumes.
Volume = (1/3) * (EL2-EL1) * (Area1 + Area2 + sq.rt.(Area1*Area2))
where: EL1, EL2 = Lower and upper elevations of the increment
Area1,Area2 = Areas computed for EL1, EL2, respectively
Volume = Incremental volume between EL1 and EL2
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Vol: Elev-Volume Page 6.02
Name.... POND_NO.1
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
USER DEFINED VOLUME RATING TABLE
Elevation Volume
(ft) (ac-ft)
---------------------
866.00 .000
866.50 .092
867.55 .662
868.50 1.282
870.50 2.918
871.00 3.339
871.40 3.693
872.00 4.274
873.00 5.339
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Vol: Elev-Area Page 6.03
Name.... POND_NO.3
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
Elevation Planimeter Area A1+A2+sqr(A1*A2) Volume Volume Sum
(ft) (sq.in) (acres) (acres) (ac-ft) (ac-ft)
------------------------------------------------------------------------
871.28 ----- .0000 .0000 .000 .000
872.00 ----- .1617 .1617 .039 .039
873.00 ----- .2500 .6128 .204 .243
874.00 ----- .3540 .9015 .300 .544
875.00 ----- .4575 1.2139 .405 .948
876.00 ----- .5624 1.5271 .509 1.457
877.00 ----- .6686 1.8442 .615 2.072
878.00 ----- .7636 2.1467 .716 2.788
879.00 ----- .8848 2.4704 .823 3.611
POND VOLUME EQUATIONS
* Incremental volume computed by the Conic Method for Reservoir Volumes.
Volume = (1/3) * (EL2-EL1) * (Area1 + Area2 + sq.rt.(Area1*Area2))
where: EL1, EL2 = Lower and upper elevations of the increment
Area1,Area2 = Areas computed for EL1, EL2, respectively
Volume = Incremental volume between EL1 and EL2
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... E-Q-TW Series Page 7.01
Name.... CENTSOUTHCONNECT
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
Elevation - Outflow - Tailwater (ICPR Rating Table)
TW Elevs. ---> TW,ft TW,ft TW,ft TW,ft TW,ft
866.00 866.50 867.00 867.10 867.50
HW Elev,ft Flow, cfs Flow, cfs Flow, cfs Flow, cfs Flow, cfs
--------- --------- --------- --------- --------- ---------
867.50 .00 .00 .00 .00 .00
868.00 .00 .00 .00 .00 .00
868.50 .00 .00 .00 .00 .00
869.00 1.31 1.31 1.31 1.31 1.31
869.50 5.03 5.03 5.03 5.03 5.03
870.00 10.81 10.81 10.81 10.81 10.81
870.50 18.28 18.28 18.28 18.28 18.28
871.00 26.99 26.99 26.99 26.99 26.99
871.50 36.56 36.56 36.56 36.56 36.56
872.00 46.48 46.48 46.48 46.48 46.48
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... E-Q-TW Series Page 7.02
Name.... CENTSOUTHCONNECT
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
Elevation - Outflow - Tailwater (ICPR Rating Table)
TW Elevs. ---> TW,ft TW,ft TW,ft TW,ft TW,ft
868.00 868.50 869.00 869.50 870.00
HW Elev,ft Flow, cfs Flow, cfs Flow, cfs Flow, cfs Flow, cfs
--------- --------- --------- --------- --------- ---------
867.50 -.00 -.00 -1.34 -5.08 -10.75
868.00 .00 -.00 -1.34 -5.08 -10.75
868.50 .00 .00 -1.34 -5.08 -10.75
869.00 1.31 1.31 .00 -5.08 -10.75
869.50 5.03 5.03 5.03 .00 -10.75
870.00 10.81 10.81 10.81 10.81 .00
870.50 18.28 18.28 18.28 18.28 18.28
871.00 26.99 26.99 26.99 26.99 26.99
871.50 36.56 36.56 36.56 36.56 36.56
872.00 46.48 46.48 46.48 46.48 46.48
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... E-Q-TW Series Page 7.03
Name.... CENTSOUTHCONNECT
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
Elevation - Outflow - Tailwater (ICPR Rating Table)
TW Elevs. ---> TW,ft TW,ft TW,ft TW,ft TW,ft
870.50 871.00 871.50 872.00 872.50
HW Elev,ft Flow, cfs Flow, cfs Flow, cfs Flow, cfs Flow, cfs
--------- --------- --------- --------- --------- ---------
867.50 -17.55 -24.70 -31.81 -38.58 -44.97
868.00 -17.55 -24.70 -31.81 -38.58 -44.97
868.50 -17.55 -24.70 -31.81 -38.58 -44.97
869.00 -17.55 -24.70 -31.81 -38.58 -44.97
869.50 -17.55 -24.70 -31.81 -38.58 -44.97
870.00 -17.12 -24.70 -31.81 -38.58 -44.97
870.50 .00 -22.17 -31.45 -38.58 -44.97
871.00 26.76 .00 -25.42 -35.91 -43.92
871.50 36.56 28.63 .00 -26.70 -37.79
872.00 46.48 40.59 28.72 .00 -26.70
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... E-Q-TW Series Page 7.04
Name.... CENTSOUTHCONNECT
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
Elevation - Outflow - Tailwater (ICPR Rating Table)
TW Elevs. ---> TW,ft TW,ft TW,ft TW,ft TW,ft
873.00 .00 .00 .00
HW Elev,ft Flow, cfs Flow, cfs Flow, cfs Flow, cfs Flow, cfs
--------- --------- --------- --------- --------- ---------
867.50 -50.97 .00 .00 .00
868.00 -50.97 .00 .00 .00
868.50 -50.97 .00 .00 .00
869.00 -50.97 .00 .00 .00
869.50 -50.97 .00 .00 .00
870.00 -50.97 .00 .00 .00
870.50 -50.97 .00 .00 .00
871.00 -50.69 .00 .00 .00
871.50 -46.28 .00 .00 .00
872.00 -37.79 .00 .00 .00
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Outlet Input Data Page 7.05
Name.... NorthCentConnect
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
REQUESTED POND WS ELEVATIONS:
Min. Elev.= 871.28 ft
Increment = .50 ft
Max. Elev.= 879.00 ft
Spot Elevations, ft
879.00
**********************************************
OUTLET CONNECTIVITY
**********************************************
---> Forward Flow Only (UpStream to DnStream)
<--- Reverse Flow Only (DnStream to UpStream)
<---> Forward and Reverse Both Allowed
Structure No. Outfall E1, ft E2, ft
----------------- ---- ------- --------- ---------
Orifice-Circular 2 ---> 1 874.000 879.000
Culvert-Circular 1 ---> TW 869.250 879.000
TW SETUP, DS Channel
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Outlet Input Data Page 7.06
Name.... NorthCentConnect
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
OUTLET STRUCTURE INPUT DATA
Structure ID = 2
Structure Type = Orifice-Circular
------------------------------------
# of Openings = 1
Invert Elev. = 874.00 ft
Diameter = .5000 ft
Orifice Coeff. = .600
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Outlet Input Data Page 7.07
Name.... NorthCentConnect
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
OUTLET STRUCTURE INPUT DATA
Structure ID = 1
Structure Type = Culvert-Circular
------------------------------------
No. Barrels = 1
Barrel Diameter = 1.0000 ft
Upstream Invert = 869.25 ft
Dnstream Invert = 868.50 ft
Horiz. Length = 65.00 ft
Barrel Length = 65.00 ft
Barrel Slope = .01154 ft/ft
OUTLET CONTROL DATA...
Mannings n = .0120
Ke = .2000 (forward entrance loss)
Kb = .026647 (per ft of full flow)
Kr = .5000 (reverse entrance loss)
HW Convergence = .001 +/- ft
INLET CONTROL DATA...
Equation form = 1
Inlet Control K = .0045
Inlet Control M = 2.0000
Inlet Control c = .03170
Inlet Control Y = .6900
T1 ratio (HW/D) = 1.089
T2 ratio (HW/D) = 1.191
Slope Factor = -.500
Use unsubmerged inlet control Form 1 equ. below T1 elev.
Use submerged inlet control Form 1 equ. above T2 elev.
In transition zone between unsubmerged and submerged inlet control,
interpolate between flows at T1 & T2...
At T1 Elev = 870.34 ft ---> Flow = 2.75 cfs
At T2 Elev = 870.44 ft ---> Flow = 3.14 cfs
Structure ID = TW
Structure Type = TW SETUP, DS Channel
------------------------------------
FREE OUTFALL CONDITIONS SPECIFIED
CONVERGENCE TOLERANCES...
Maximum Iterations= 30
Min. TW tolerance = .01 ft
Max. TW tolerance = .01 ft
Min. HW tolerance = .01 ft
Max. HW tolerance = .01 ft
Min. Q tolerance = .10 cfs
Max. Q tolerance = .10 cfs
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Outlet Input Data Page 7.08
Name.... Pondout
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
REQUESTED POND WS ELEVATIONS:
Min. Elev.= 866.00 ft
Increment = .50 ft
Max. Elev.= 873.00 ft
Spot Elevations, ft
866.50
873.00
**********************************************
OUTLET CONNECTIVITY
**********************************************
---> Forward Flow Only (UpStream to DnStream)
<--- Reverse Flow Only (DnStream to UpStream)
<---> Forward and Reverse Both Allowed
Structure No. Outfall E1, ft E2, ft
----------------- ---- ------- --------- ---------
Orifice-Circular 2 ---> 3 869.000 873.000
Orifice-Circular 1 ---> 3 867.550 873.000
Culvert-Circular 3 ---> TW 864.250 873.000
TW SETUP, DS Channel
)PIZEXMSRJSV;EXIV
5YEPMX]:SPYQI
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Outlet Input Data Page 7.09
Name.... Pondout
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
OUTLET STRUCTURE INPUT DATA
Structure ID = 2
Structure Type = Orifice-Circular
------------------------------------
# of Openings = 1
Invert Elev. = 869.00 ft
Diameter = .7917 ft
Orifice Coeff. = .600
Structure ID = 1
Structure Type = Orifice-Circular
------------------------------------
# of Openings = 1
Invert Elev. = 867.55 ft
Diameter = .5000 ft
Orifice Coeff. = .600
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Type.... Outlet Input Data Page 7.10
Name.... Pondout
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-16.PPW
OUTLET STRUCTURE INPUT DATA
Structure ID = 3
Structure Type = Culvert-Circular
------------------------------------
No. Barrels = 1
Barrel Diameter = 1.5000 ft
Upstream Invert = 864.25 ft
Dnstream Invert = 864.19 ft
Horiz. Length = 30.00 ft
Barrel Length = 30.00 ft
Barrel Slope = .00200 ft/ft
OUTLET CONTROL DATA...
Mannings n = .0120
Ke = .2000 (forward entrance loss)
Kb = .015519 (per ft of full flow)
Kr = .5000 (reverse entrance loss)
HW Convergence = .001 +/- ft
INLET CONTROL DATA...
Equation form = 1
Inlet Control K = .0045
Inlet Control M = 2.0000
Inlet Control c = .03170
Inlet Control Y = .6900
T1 ratio (HW/D) = 1.094
T2 ratio (HW/D) = 1.196
Slope Factor = -.500
Use unsubmerged inlet control Form 1 equ. below T1 elev.
Use submerged inlet control Form 1 equ. above T2 elev.
In transition zone between unsubmerged and submerged inlet control,
interpolate between flows at T1 & T2...
At T1 Elev = 865.89 ft ---> Flow = 7.58 cfs
At T2 Elev = 866.04 ft ---> Flow = 8.66 cfs
Structure ID = TW
Structure Type = TW SETUP, DS Channel
------------------------------------
FREE OUTFALL CONDITIONS SPECIFIED
CONVERGENCE TOLERANCES...
Maximum Iterations= 30
Min. TW tolerance = .01 ft
Max. TW tolerance = .01 ft
Min. HW tolerance = .01 ft
Max. HW tolerance = .01 ft
Min. Q tolerance = .10 cfs
Max. Q tolerance = .10 cfs
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Appendix A A-1
Index of Starting Page Numbers for ID Names
----- C -----
CENTSOUTHCONNECT... 7.01
----- H -----
Hamilton County... 3.01
----- N -----
NorthCentConnect... 7.05
----- O -----
OFFSITE CHURCH... 4.01, 5.01
OFFSITE R/W... 4.03, 5.02
ONSITE_POND2... 4.05, 5.03
ONSITE_POND3... 4.07, 5.04
ONSITE_POND_1... 4.09, 5.05
----- P -----
Pondout... 7.08
POND_NO. 2... 6.01
POND_NO.1... 6.02
POND_NO.3... 6.03
----- W -----
Watershed... 1.01, 2.01, 2.02
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:47 AM Date: 3/16/2012
Detention/InfiltrationBasinAlt2
Infiltration/Volume
DetentionPipe/Stone,Total
Elev.Area(sf)Elev.Area(ac)Basinacft48"acftVolume
86608660008660
866.514597.42866.50.33510.05600.0359866.50.0919
86718473.998670.42410.2450867
867.5521250867.550.48780.49600.1663867.550.6623
86823495.658680.53940.7270868
868.50.58831.00900.273868.51.282
86927752.928690.63711.3150869
87033227.18700.76282.0140870
870.5870.50.81482.40800.51870.52.918
87137754.88710.86672.82900.518713.339
871.439530.7871.40.90753.18300.51871.43.693
8728721.02953.76400.518724.274
8738731.10004.82900.518735.339
PondVolumeModelInput
8660
WaterQualityVolume:866.50.0919
0.50acftstorageinpond867.550.6623
Elevation867.55'andbelow868.51.2820
forrequiredvolume.870.52.9180
8713.3390
871.43.6930
8724.2740
8735.3390
Type.... Vol: Elev-Area Page 1.01
Name.... POND 40
File.... O:\2006\060384\20320\calcs\Engr\Detention\Prelim\DEV_MMLOT2_ALT2_2012-03-15.PPW
Elevation Planimeter Area A1+A2+sqr(A1*A2) Volume Volume Sum
(ft) (sq.in) (acres) (acres) (ac-ft) (ac-ft)
------------------------------------------------------------------------
866.00 ----- .0000 .0000 .000 .000
866.50 ----- .3351 .3351 .056 .056
867.00 ----- .4241 1.1362 .189 .245
867.55 ----- .4878 1.3667 .251 .496
868.00 ----- .5394 1.5402 .231 .727
868.50 ----- .5883 1.6910 .282 1.009
869.00 ----- .6371 1.8376 .306 1.315
870.00 ----- .7628 2.0970 .699 2.014
870.50 ----- .8148 2.3660 .394 2.408
871.00 ----- .8667 2.5219 .420 2.829
871.40 ----- .9075 2.6611 .355 3.183
872.00 ----- 1.0295 2.9036 .581 3.764
873.00 ----- 1.1000 3.1937 1.065 4.829
POND VOLUME EQUATIONS
* Incremental volume computed by the Conic Method for Reservoir Volumes.
Volume = (1/3) * (EL2-EL1) * (Area1 + Area2 + sq.rt.(Area1*Area2))
where: EL1, EL2 = Lower and upper elevations of the increment
Area1,Area2 = Areas computed for EL1, EL2, respectively
Volume = Incremental volume between EL1 and EL2
Infiltration/Detention Basin Volumes
S/N: F21B05A2E1C9 Paul I. Cripe Inc
PondPack Ver. 9.0046 Time: 9:42 AM Date: 3/16/2012
48" CMP PIPE STORAGE - UNDERGROUND DETENTION
Appendix B
Water Quality Analysis
Appendix C
Approved Drainage Design Report
for 131st Street and US 31 Infrastructure
3;2)676)46)7)28%8-32
+-7
)1EMPGVMTI$GVMTIFM^
0%2(796:)=-2+
6
*%<
0%2(40%22-2+
-2(-%2%430-7-2(-%2%
'-:-086%274368%8-32)2+-2))67
-28)6-36()7-+2
46-36-8=;%=7398,(6-:)79-8)
)59-41)2840%2-2+
%6',-8)'896)%6',-8)'896)
4EYP-'VMTI-RG
'
3;2)676)46)7)28%8-32
+-7
)1EMPGVMTI$GVMTIFM^
0%2(796:)=-2+
6
*%<
0%2(40%22-2+
-2(-%2%430-7-2(-%2%
'-:-086%274368%8-32)2+-2))67
-28)6-36()7-+2
46-36-8=;%=7398,(6-:)79-8)
)59-41)2840%2-2+
%6',-8)'896)%6',-8)'896)
4EYP-'VMTI-RG
'
3;2)676)46)7)28%8-32
+-7
)1EMPGVMTI$GVMTIFM^
0%2(796:)=-2+
6
*%<
0%2(40%22-2+
-2(-%2%430-7-2(-%2%
'-:-086%274368%8-32)2+-2))67
-28)6-36()7-+2
46-36-8=;%=7398,(6-:)79-8)
)59-41)2840%2-2+
%6',-8)'896)%6',-8)'896)
4EYP-'VMTI-RG
'
3;2)676)46)7)28%8-32
+-7
)1EMPGVMTI$GVMTIFM^
0%2(796:)=-2+
6
*%<
0%2(40%22-2+
-2(-%2%430-7-2(-%2%
'-:-086%274368%8-32)2+-2))67
-28)6-36()7-+2
46-36-8=;%=7398,(6-:)79-8)
)59-41)2840%2-2+
%6',-8)'896)%6',-8)'896)
4EYP-'VMTI-RG
'
3;2)676)46)7)28%8-32
+-7
)1EMPGVMTI$GVMTIFM^
0%2(796:)=-2+
6
*%<
0%2(40%22-2+
-2(-%2%430-7-2(-%2%
'-:-086%274368%8-32)2+-2))67
-28)6-36()7-+2
46-36-8=;%=7398,(6-:)79-8)
)59-41)2840%2-2+
%6',-8)'896)%6',-8)'896)
4EYP-'VMTI-RG
'
3;2)676)46)7)28%8-32
+-7
)1EMPGVMTI$GVMTIFM^
0%2(796:)=-2+
6
*%<
0%2(40%22-2+
-2(-%2%430-7-2(-%2%
'-:-086%274368%8-32)2+-2))67
-28)6-36()7-+2
46-36-8=;%=7398,(6-:)79-8)
)59-41)2840%2-2+
%6',-8)'896)%6',-8)'896)
4EYP-'VMTI-RG
'