Loading...
HomeMy WebLinkAboutMinutes TAC 04-18-12CARMEL 'TECHNICAL ADVISORY COMMITTEE MEETING AGENDA Date: Wednesday, April 18, 2012 Place: Dept. of Community Services Conference Room, 3 Floor, Carmel City Hall. Time: 9:00 a.m. 9:00a.m. Docket No. 12030010 DP Amend/ADLS: The Centre. The applicant seeks site plan and design approvals for a partial redevelopment of the site. The applicant also seeks the following zoning waiver request: Docket No. 12030012 ZW ZO Chptrs 23F.15 23F.02.04: Required of parking spaces. The site is located at 1342 -1430 S. Range Line Road. It is zoned B -3 /Business, within the Carmel Dr. Range Line Rd. Overlay Zone. Filed by Paul Reis of Krieg Devault, for Kite Realty Co. Rich Kelly of A &F Engineering presented on behalf of the petitioner. The initial phase of this redevelopment will be the replacement of the former CVS anchor in the center of the strip building with a new grocery store which will serve as the anchor business. The plan also calls for the removal of a portion of the existing strip building to be replaced by a relocated bank and pharmacy building at the corner of 116 St. Range Line Rd. The plan will also relocate parking. At the north end of the site will be free standing outlot multi- tenant building. The far north end of the building would also contain a restaurant with a drive through. There would also be two additional tenants on the spaces to the south of the restaurant. Two driveways would be relocated but the total number of driveways would not increase. On the north end of the site, the current curb cut would be moved north to allow for development of the free standing building. The curb cut on the south end off Range Line Rd. would also be moved north to accommodate for the pharmacy at the hard corner. There will be a lot of utilities which will need to be moved. Petitioner also noted the access that aligns with Medical Dr. will be maintained Greg Hoyes Hamilton County Surveyor's Office Sent letter. No further comments Joanie Clark Vectren Energy Thinks gas main is located behind property. Advised petitioner to contact Vectren when construction drawings are created to make sure these will be accounted for. Nick Redden Camel Engineering Sent Letter. No further comments. Dan Davenport Indianapolis Power Light Project is outside of IPL' s service area. No comments. Shirley Hunter Duke Energy Asked if by relocating utilities, if petitioner was referring only to transformers. Petitioner indicated that they wish to maintain current transformers. Further, there is a transformer located on the north end of the building which they will create a bump -out island in order to maintain However, petitioner stated they will need to dig into the back edge of the property in order to really understand what is there. The stores which are coming down will all need to be taken out. Page 1 of 5 ONE CIVIC SQ. CARMEL, IN 46032 (317) 571 -2417 WWW.CARMEL.IN.GOV Also, they will need to re -feed the grocery store. Petitioner will work with Duke Energy to make sure Duke has the information they will need. Amanda Foley Carmel Engineering Carmel Engineering has had several meetings with petitioner and everything presented so far has been consistent with what has already been discussed. No further comments. Ryan Hartman Clay Twp. Regional Waste Project is outside CTRWD's territory. No further comments Daren Mindham DOCS -Urban Forestry Will re- review plans for the trees on the back of the property to make sure they match what has been approved. No further comments. Angie Conn DOCS- Planning and Zoning Review comments have been sent. DOCS is waiting for an official response. Most comments were in regards to architecture. 9:15 a.m. Docket No. 12030011 TAC: Meridian Main, Phase 1, Parcel 2. The applicant seeks TAC approval to modify the storm water detention and water quality basin, a result of the INDOT' s US 31 road improvement project. The site is located the northwest corner of Pennsylvania St. and Main St. It is zoned B -6 /Business within the Meridian Street/US 31 Overlay. Filed by Jamie Browning for Meridian 131, LLC. David Lach with Cripe Architects Engineers presented on behalf of the petitioner. He explained that the project at this time is a modification to the existing drainage system which was installed with the infrastructure for the Meridian Main Phase I project. INDOT has proposed right -of -way taking along the west and south sides of the property. This project is to modify the drainage structure and coordinate what future drainage needs will be for the area. No building will be planned at this time. The building shown on the original plans was merely for reference for future planning Greg Hoyes Hamilton County Surveyor's Office Sent letter. Will have additional comments as project moves forward. Joanie Clark Vectren Energy No comments. Nick Redden Camel Engineering Sent letter. No further comments at this time. Dan Davenport Indianapolis Power Light Project is outside of IPL' service area. No comments. Shirley Hunter Duke Energy Explained that she will not be working directly on this project because Duke Energy has a Major Projects Group. She was involved in original infrastructure. The original plan called for a round -about there. The state of Indiana has planned to take the right -of -way and has granted Duke Energy an easement. Duke currently has cable in the ground on the west side of the road. The overhead poles on the west side of this area are cable TV only. All of Duke's WWW.CARMEL.IN.GOV Page 2 of 5 ONE CIVIC SQ. CARMEL, IN 46032 (317) 571 -2417 9:25 a.m. cables are underground. Amanda Foley Carmel Engineering Engineering is waiting for new plans to be submitted based on the discussion during the last meeting. No further comments. Ryan Hartman Clay Twp. Regional Waste Project is outside CTRWD's territory. No further comments Daren Mindham DOCS -Urban Forestry No comments, Angie Conn DOCS- Planning and Zoning No comments. (Tabled) (Withdrawn) Overlay Zone. Filed by Brad Walker of H H Restaurant Management. 9:35 a.m. Docket No. 12030017 PP: The Overlook at Legacy (Legacy PUD). The applicant seeks primary plat approval for 31 lots on 25.23 acres. The site is located at the southeast corner of Community Dr. and future Cherry Creek Blvd. It is zoned PUD /Planned Unit Development. Filed by Tim Walter of Platinum Properties, LLC. Docket No. 12030018 SP: The Overlook at Legacy, Section 1 (Legacy PUD). The applicant seeks secondary plat approval for 13 lots on 19.95 acres. The site is located at the southeast corner of Community Dr. and future Cherry Creek Blvd. It is zoned PUD /Planned Unit Development. Filed by Tim Walter of Platinum Properties, LLC. Docket No. 12030019 PP: The Meadows at Legacy (Legacy PUD). The applicant seeks primary plat approval for 148 lots on 59.89 acres. The site is located at the southwest corner of Community Dr. and future Cherry Creek Blvd. It is zoned PUD /Planned Unit Development. Filed by Tim Walter of Platinum Properties, LLC. Docket No. 12030020 SP: The Meadows at Legacy, Section 1 (Legacy PUD). The applicant seeks secondary plat approval for 32 lots on 13.38 acres. The site is located at the southwest corner of Community Dr. and future Cherry Creek Blvd. It is zoned PUD /Planned Unit Development. Filed by Tim Walter of Platinum Properties, LLC. Brett Huff of Stoeppelworth and Associate, Jon Dobosiewicz of Nelson Frankenberger, and Tim Walter of Platinum Properties presented on behalf of the petitioner. Mr. Huff explained that the Meadows project is 148 lots, and 125 of the lots will be 65 -feet wide and will be built by Ryland Homes. The remaining lots will be 90 -feet wide and a builder has not yet been selected for these. The Overlook project lots will be 65 -feet wide and the builder will most likely be Wedgewood WWW.CARMEL.IN.GOV Page 3 of 5 ONE CIVIC SQ. CARMEL, IN 46032 (317) 571 -2417 Homes. Greg Hoyes Hamilton County Surveyor's Office Letters sent on both projects. Actual projects look fine, but the Master plan for the project will still need to be finalized Joanie Clark Vectren Energy Asked when projects would start. Mr. Huff indicated they would like to begin this summer. They hope to have primary plat approved on the June 19 Plan Commission meeting and start construction shortly after that. No further comments. Nick Redden Camel Engineering Comments have been mailed No further comments at this time. Shirley Hunter Duke Energy -Asked Mr. Hull to call in to make service requests for this area when needed. Ms. Hunter said it is her understanding that the developers of the Meadows project will essentially order where Duke Energy' s easement will be located, and she needs to make sure Duke has grade. Ms. Hunter will respond at a later time with further comments. Amanda Foley Carmel Engineering Stormwater plans will need to be approved before Engineering will have further comments. Mr. Dobosiewicz asked if there were comments to be made to DOCS prior to the May 15 Plan Commission meeting. Ms. Foley said Engineering has delivered comments to DOCS but will still need to review and approve the stormwater plans before commenting further because so much of the project relies on the drainage plans. Ms. Foley asked Mr. Huff if there would be an amended stormwater plans submitted this week, per the Engineering department's request. Mr. Huff indicated that they have issued a master plan for stormwater for the entire Legacy project and he is aware this will need to be approved before construction. He said in regards to the primary plat being approved by the Plan Commission, he would appreciate any general technical comments that can be offered from Engineering prior to presenting to Plan Commission, since every time it is not approved would be an extra 30 days. Mr. Huff said if Engineering has sent comments to DOCS on this project, he has not seen them. Ms. Foley indicated that if the plans weren't due until May 10 then the Engineering department has not seen them. Mr. Dobosiewicz said typically when they file a primary plat prior to TAC, they will receive comments from individual TAC members so they can make the necessary changes prior to presenting to Plan Commission. Ms. Foley said Engineering will provide comments in a staff report to be issued to DOCS prior to Plan Commission meeting. Daren Mindham DOCS -Urban Forestry Comments have been sent. He is waiting for revised plans. No further comments. Angie Conn DOCS- Planning and Zoning DOCS has sent review comments and is waiting for an official response. Mr. Huff said he received a comment from Ms. Conn that the entry column "might" be OK. He asked if DOCS has established that this is OK. Ms. Conn said she will review again today and if it is substantially the same, should be acceptable. WWW.CARMEL.IN.GOV Page 4 of 5 ONE CIVIC SQ. CARMEL, IN 46032 (317) 571 -2417 9:55 a.m. (Tabled to May 16) 10:05 a.m. Docket No. 11120010 UV ZO Chptr. 5.01 23C.03 Pcrmittcd Uscs in S 1 district. Docket No. 11120011 V ZO Chptr. 27.03 No parking lot curbing. The site is located at 9799 N. Michigan Rd. It is zoned S 1 /Residence, located within the US '121 /Michigan Rd. Overlay Zone. Filed by Christine Jones, owner. (Tabled Indefinitely) The applicant seeks the following use variance approval for an auto leasing business: Docket No. 11100006 UV ZO Ch. 19.01: Pcrmittcd Uscs. The site is located at 2350 E. 116 St. It is zoned B 8 /Business. Filed by Jeff Gowdy of Enterprise 1 I WWW.CARMEL.IN.GOV File: TAC2012 0321.doc Page 5 of 5 ONE CIVIC SQ. CARMEL, IN 46032 (317) 571 -2417