I am almost done satisfying Ca mel Engineering, am t` yen the contractor will be pulling permits for both projects soon.
Thanks b= checking ire.
Roger Ward PE, LEED AP
Roger Ward Engineering. Inc.
7474 Noe Road
Indianapolis, IN 46278
(317) 251 -1738
(Fax) 251 -1923
www.rw- engineerino.com
From: Conn, Angelina V [ma Ito:Aconn@ carmel.in.gov]
Sent: Tuesday, April 10, 2012 12:09 PM
To: Roger Ward
Subject: Tom Wood Jaguar Bldg Addition Tom Wood Collision Center
Hi, Roger
I still have these plans on my desk and was just wondering about the status of these projects. Please let me know.
Thanks,.
Angie Conn, Planning Administrator
City of Carmel Planning Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
0: 317-571-2417 1 F: 317 571 -2426 1
W: www.carmeldocs.com
E:
Please consider the environment before pnnting this e-mail
Roger Ward [RWard@rw -eng neering.co'r
Tuesday, April 10, 2012 12:10 PM
Conn. Angelina V
RE: Tom Wood Jaguar Bldg Addition Tom Wood Co'l&on Center
aconn(acarmel.rn.gov
Conn, An
elina V
From: Roger Ward [RWard @rw- engineering.com]
Sent: Tuesday, November 22, 2011 10:47 AM
To: Conn, Angelina V; Donahue -Wold, Alex:a K; Mindham, Daren; Littlejohn, David W; Akers.
William P; Huffman, David; Thomas, John G; greg.hoyes @hamiltoncounty.in.gov;
gilko @crossroadengineers.com; Duncan, Gary R; Redden, Nick;
david.lucas @hamiltoncounty.in.gov; Hohlt, William G; Blanchard, Jim E; Duffy, John M,
Green, Timothy J; Ellison, Christopher M, Krueskamp, Theresa A; Forward for Westermeier,
Mark; jason.lemaster @hamiltoncounty in.gov; brooke. gajownik @hamiltoncounty.in.gov;
jason .kirkman @mybrighthouse.com; shirley.hunter @duke energy.com;
gary.mcnamee @duke energy.com; jlclark @vectren.com; dan.davenport @aes.com;
dwhiting@citizensenergygroup com; rfarrand @ccs.k12 in. us. Ryan Hartman;
troy.yackle sug.com; doland.w.wise usps.gov; sk4986@att.com
Cc: Michael Belay
Subject: Tom Wood Collision Center Drainage Improvements TAC email
Attachments: Tom Wood Collision Center.pdf
Carmel TAC Members,
Please see the attached construction plans for the Tom Wood Collision Center Drainage Improvements project located
at 9727 Bauer Drive East in Carmel. This is an existing building and site where we are only proposing some drainage
improvements. I do not believe any utilities are being affected, and this project may not need to be reviewed by all of the
TAC members. According to meetings with Angie Conn, we will not be attending a TAC Meeting for this project. We will
be working with the TAC members direc`'y while addressing your comments.
Please let me know if you need paper copies of'hese plans and if you have any questions regarding the plans. I look
forward 'o receiving your comments for our project.
Thank you,
Roger Ward PE, LEED AP
Roger Ward Engineering Inc
7474 Noel Road
Indianapolis, IN 46278
(317) 251 -1738
(Fax) 251 -1923
www.rw engineering.com
been addressed regarding the color of the building, and the drainage. The owners have
also agreed to mow the property on their north side at least once a month, and to maintain
the spruces on the north side of their building.
Members of the public were invited to speak in opposition. None appeared.
The Department recommends favorable consideration of this petition, with conditions
based on the letter from the Soil and Water Conservation office dated April 23, 2001;
namely, (1) that a silt be installed between the proposed project and the storm water
detention basin and (2) the seeding specifications required for erosion sediment control be
submitted to the department for the file. Mr. Price agreed to these conditions on behalf of
the petitioner. Ms. Rice commented she likes to hear when a petitioner has already
worked with residents. She inquired about building materials, and was told they are
looking at metal materials and will choose colors to be sympathetic to the area and site.
Mr. Strayer explained it will not be poured concrete, to which Mr. Miller had objections.
Mr. Miller acknowledged he has not seen the specific materials under consideration. The
trees behind the existing building (approximately 18 ft. in height) will be relocated to a
more advantageous spot.
Mowing and seeding will be done by Designplan on a monthly basis during the growing
season.
Efforts will be made to select materials that are pleasing to the eye, and Mr. Miller will be
glad to work with Designplan at appropriate times. He will also contact Mr. Lillig or
Kelli Hahn in the Department to acknowledge agreement with the approved selection.
Color and texture are the important considerations.
Mr. Mohr made a motion to approve SU -31 -01 with three conditions: 1) that a silt
fence be installed along the south line of the drainage easement; 2) that seeding
specifications be submitted to the Department; and 3) that Mr. Miller be given the
option to work with the petitioner on the color and texture of the exterior metal
building material. Ms. Rice seconded the motion, which was then APPROVED with a
vote of 5 in favor, 0 opposed.
20 -21h. Ahluwalia Office Building (V- 32 -01; V- 33 -01)
These items were tabled by request of the Petitioner.
Petitioner seeks Developmental Standards Variances of Sections 16.4.6; Minimum
Lot Width in order to construct a second general office building on a 90- foot -wide
property and of Section 16.5.1(1) in order to forego including a loading berth. The
site is located at 300 East Main Street. The site is zoned B- 5/business.
Filed by Joseph M. Scimia of Baker Daniels for Charm Ahluwalia..
22h. Lattice Communications (SU- 36 -01)
s:\BoardofZoningAppeals Minutes\bza2001 apr
ID to
fa c
15 7
113 C
r.
t u-
o
E 4 t
C U
e
o• kf
w
%Pa'
44 C.
22 t
J f
44
.12 7 a
i 1 j.
;2 2$
co1C
.2 8
"-E�$
B e e 0
o §oE a
c
�J k}£
A b1- R&
0
E
N
N
m
C Z.
m co
Q
E
c
m
CO
a
cJ
cu
c
c
to O
o v
N O1
C
op 6
tn
L
O1
L
4.
0