HomeMy WebLinkAboutCorrespondenceConn, Angelina V From: Sent: To: Subject: I am almost done satisfying Ca mel Engineering, am t` yen the contractor will be pulling permits for both projects soon. Thanks b= checking ire. Roger Ward PE, LEED AP Roger Ward Engineering. Inc. 7474 Noe Road Indianapolis, IN 46278 (317) 251 -1738 (Fax) 251 -1923 www.rw- engineerino.com From: Conn, Angelina V [ma Ito:Aconn@ carmel.in.gov] Sent: Tuesday, April 10, 2012 12:09 PM To: Roger Ward Subject: Tom Wood Jaguar Bldg Addition Tom Wood Collision Center Hi, Roger I still have these plans on my desk and was just wondering about the status of these projects. Please let me know. Thanks,. Angie Conn, Planning Administrator City of Carmel Planning Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr. Carmel, IN 46032 0: 317-571-2417 1 F: 317 571 -2426 1 W: www.carmeldocs.com E: Please consider the environment before pnnting this e-mail Roger Ward [RWard@rw -eng neering.co'r Tuesday, April 10, 2012 12:10 PM Conn. Angelina V RE: Tom Wood Jaguar Bldg Addition Tom Wood Co'l&on Center aconn(acarmel.rn.gov Conn, An elina V From: Roger Ward [RWard @rw- engineering.com] Sent: Tuesday, November 22, 2011 10:47 AM To: Conn, Angelina V; Donahue -Wold, Alex:a K; Mindham, Daren; Littlejohn, David W; Akers. William P; Huffman, David; Thomas, John G; greg.hoyes @hamiltoncounty.in.gov; gilko @crossroadengineers.com; Duncan, Gary R; Redden, Nick; david.lucas @hamiltoncounty.in.gov; Hohlt, William G; Blanchard, Jim E; Duffy, John M, Green, Timothy J; Ellison, Christopher M, Krueskamp, Theresa A; Forward for Westermeier, Mark; jason.lemaster @hamiltoncounty in.gov; brooke. gajownik @hamiltoncounty.in.gov; jason .kirkman @mybrighthouse.com; shirley.hunter @duke energy.com; gary.mcnamee @duke energy.com; jlclark @vectren.com; dan.davenport @aes.com; dwhiting@citizensenergygroup com; rfarrand @ccs.k12 in. us. Ryan Hartman; troy.yackle sug.com; doland.w.wise usps.gov; sk4986@att.com Cc: Michael Belay Subject: Tom Wood Collision Center Drainage Improvements TAC email Attachments: Tom Wood Collision Center.pdf Carmel TAC Members, Please see the attached construction plans for the Tom Wood Collision Center Drainage Improvements project located at 9727 Bauer Drive East in Carmel. This is an existing building and site where we are only proposing some drainage improvements. I do not believe any utilities are being affected, and this project may not need to be reviewed by all of the TAC members. According to meetings with Angie Conn, we will not be attending a TAC Meeting for this project. We will be working with the TAC members direc`'y while addressing your comments. Please let me know if you need paper copies of'hese plans and if you have any questions regarding the plans. I look forward 'o receiving your comments for our project. Thank you, Roger Ward PE, LEED AP Roger Ward Engineering Inc 7474 Noel Road Indianapolis, IN 46278 (317) 251 -1738 (Fax) 251 -1923 www.rw engineering.com been addressed regarding the color of the building, and the drainage. The owners have also agreed to mow the property on their north side at least once a month, and to maintain the spruces on the north side of their building. Members of the public were invited to speak in opposition. None appeared. The Department recommends favorable consideration of this petition, with conditions based on the letter from the Soil and Water Conservation office dated April 23, 2001; namely, (1) that a silt be installed between the proposed project and the storm water detention basin and (2) the seeding specifications required for erosion sediment control be submitted to the department for the file. Mr. Price agreed to these conditions on behalf of the petitioner. Ms. Rice commented she likes to hear when a petitioner has already worked with residents. She inquired about building materials, and was told they are looking at metal materials and will choose colors to be sympathetic to the area and site. Mr. Strayer explained it will not be poured concrete, to which Mr. Miller had objections. Mr. Miller acknowledged he has not seen the specific materials under consideration. The trees behind the existing building (approximately 18 ft. in height) will be relocated to a more advantageous spot. Mowing and seeding will be done by Designplan on a monthly basis during the growing season. Efforts will be made to select materials that are pleasing to the eye, and Mr. Miller will be glad to work with Designplan at appropriate times. He will also contact Mr. Lillig or Kelli Hahn in the Department to acknowledge agreement with the approved selection. Color and texture are the important considerations. Mr. Mohr made a motion to approve SU -31 -01 with three conditions: 1) that a silt fence be installed along the south line of the drainage easement; 2) that seeding specifications be submitted to the Department; and 3) that Mr. Miller be given the option to work with the petitioner on the color and texture of the exterior metal building material. Ms. Rice seconded the motion, which was then APPROVED with a vote of 5 in favor, 0 opposed. 20 -21h. Ahluwalia Office Building (V- 32 -01; V- 33 -01) These items were tabled by request of the Petitioner. Petitioner seeks Developmental Standards Variances of Sections 16.4.6; Minimum Lot Width in order to construct a second general office building on a 90- foot -wide property and of Section 16.5.1(1) in order to forego including a loading berth. The site is located at 300 East Main Street. The site is zoned B- 5/business. Filed by Joseph M. Scimia of Baker Daniels for Charm Ahluwalia.. 22h. Lattice Communications (SU- 36 -01) s:\BoardofZoningAppeals Minutes\bza2001 apr ID to fa c 15 7 113 C r. t u- o E 4 t C U e o• kf w %Pa' 44 C. 22 t J f 44 .12 7 a i 1 j. ;2 2$ co1C .2 8 "-E�$ B e e 0 o §oE a c �J k}£ A b1- R& 0 E N N m C Z. m co Q E c m CO a cJ cu c c to O o v N O1 C op 6 tn L O1 L 4. 0