HomeMy WebLinkAboutCorrespondence to TAC mbrsCurtis C. Huff
Vice President, COO
Professional Land Surveyor
r96a East 1u6thStreet
Fishers, Indiana
4souvaoo*
David J. Stoeppelwerth
President, CEO
Professional
Professional Land Surveyor
R.M. Stoeppelwerth
Founder
Professional Engineer
Professional Land Surveyor
mru49:o93s
Fax: u1rmaso42
STOEPPELWERTH ASSOCIATES, INC.
Carmel Engineering Department
One Civic Square, L Fioor
Carmel, Indiana 46032
Attention: Gary Duncan
Dear Mr. Duncan:
CONSULTING ENGINEERS LANO]8l{YB"�[RS
April 1O,2012
Re: The Legacy Master nfrastructure,
Phase 2
As you are aware, the property previoUsly owned by East Carmel, LLC covered by
The Legacy PUD has been transferred to a new owner, Faicon Nest H, LLC. Falcon
Nest |i LL[ has retained Platinum Properties, LLC to serve as the local developer
[or purposes of compteting the project project. As requested in your emaiI dated March
22, 2012 Stoeppelwerth Stoeppelwerth and Associates in cooperatiofl with WiUiams Creek
Consulting have completed revisions to the attached construction plans, drainage
calculations artd water quality report for the above referenced project ject in order to
secure approval to re-commence constructiOfl. Similar to the previous set of
approved plans for this project, the attached revised set is broken into separate
projects, and the owner intends to complete Prn)` ct 1 at this time, After you have
completed your review, then we will provide a new engineers estimate for Project
1 and the owner will provide new p erh»rnnancebonds\nacco[dancavv
i i the noxvevvU|preparerequisite
estimate. |nadd0on,Vvhi\eyouarerevevvn� epa
paperwork toSecure a Stormwater Management Permit from the City as well as a
new |DEK4 Rule 5 Notice of Intent for the new owner. The following is a listing of
items that have been revised and/or addressed through the revision process.
m The foliowing sheets on the construction pians did not change: C200-C202,
C206,C208,[302,C400,C402-C408 C6OU,[7OO-C7O3,C8Ol-805 and [9O1-
C905.
w The previously presented Project 1 has been separated into two projects
requiring the project numbers to change. In general, Project 1 includes
CbrnnnunityDriveandearthvvorkondstornosexve/construction related to
the detention basin in the south east corner of the overall Legacy project,
Carmel Engineering Department
April 18, 2012
Page 2
Project 2 includes Cherry Creek Boulevard east pf Communit'/ Drive, Project
3 includes Cherry Creek Boulevard we of Comrnunity Drive ending at the
first western intersection, Project 4 indudes Cherry Creek Boulevard west
of Project 3 endijig at the second western intersection, and Project 5
ncludes Cherry Creek Boulevard west of Project t4endingatExistingCheny
Creek Boulevard to the west
m
The previousty inciuded temporary grading ptan for and alt references to
Baptist Hornes of Indiana and/orthe Prairie Landing project have been
removed (southwest of round-a-bout) and replaced with temporary
grading and erosion control measures fbr The Meadows at Legacy
(adjusted construction lirnits in The Meadows at Legacy area).
a The The previously designed wet pond shown in the southeast c:orner of the
Legacy developo ent (Lake #6) has been re-designed as a dry detention
basin including the installation of a treatment liner as a well-head
protection measure in the detention areas and including an open channel
to convey drainage for the Tunis Gerard Legal Dram This revision also
eliminated the dewatering plan necessary for construction of the wet
pond.
m The constructed wetland BMP previously shown adjacent to Lake #1 has
been removed as it is not necessary for water quality purposes related to
the construction described in these plans (was previously included as a
8K4P for the now defunct Prairie Landing project).
0 The constructed wetland BMP previo.uslyshown north of Cherry Creek
Boulevard east of Community Drive has been removed as it is not
necessary for water quatity purposes related to the construction described
in these plans (was previously included as a BMP for the currently on-hold
Domain at the Legacy project).
Project 1 now includes construction ofthe linear swale in the future
median of Cherry Creek Boulevard west terminating at the existing storm
sewer trunkline that was installed as part of The Legacy Residential, Section
One, Phase One.
m
Storrn sewer plan and profiles within the Cherry Creek Boulevard right-of-
way havebeenrevisedtoaccVrnnnodatetheproposadTheK
Legacy. The revised storm structures are as follows: (listed by location
n|Ong Cherry Creek Boulevard from West to East) l42,143,45O,458A,384,
453, 377, 448, 400, and 400A.
Storm plan and profites have been revised at the south end of proposed
Community Drive. Invert elevations, pipesizes and storm structure
locations have changed to accommodate the proposed The Meadows at
Legacy.
w
Ernergency Overflow has been slightly revised south of Cherry Creek
Bouevard, and west of the round-ahout per the new design in The
Meadows at Legacy area.
Carmel Engineering Departnnent
April D8,20l2
Revsions have heeri made to address the mari soll areas in the proposed
The Meadows at Legacy area.
o The sanitary sewer road crossing shown previously on sheet C500
(structurenVnnbers744 has been e!ino\nated.This isnolonger
necessary as sewer service to the southwest corner of the Legacy
developrnent wUl be provided through the new The Meadows at Legacy
design.
The drainage report has been revised per the new storm sewer design
to 2, 10, |o with �enanatiye\ndudin�adjustments e
a n�vx
eievations for the linear basins.
The proposed p jectUnoitshavebaennoodNodind)evvaterqua|hv/eport
to reflect project conditions diff ringfrnnnthoseantidpatedduringihe
2009 submittal.
The water quality report has been revised to nclude the specifications
described in the construction docurnents for the instaflation of the
treatment liner for well head protecton.
Areas not in the "east" Iegacy drainage basn have been removed from the
water quality report and wilt be addressed duringthe pending Master
Water Quality Plan submittal.
If you have any questions, or comments regarchng these revisions, please
feel free to contact me at bhuff@stoeppelwerth.com or (317) 570-4841.
Cc: Angie Conn
oamnmind,am
David Littlejohn
Greg Hoye
Paul pace
Aaron Hoover
John Duffy
Steve Cook
s,eg||ko
Respectfully submitted,
STOEPPELWERTH ASSOCIATES, INC.
Brett A. Huff
BAH/meb
S:\55115PLA-M2 Blue, Book 'za1zoom
David J. Stoeppelwerth
President, CEO
Professional Engineer
Professional Land Surveyor
Curtis C. Huff
Vice President, COO
Professional Land Surveyor
x
Founder
Professional Engineer
Professional Land Surveyor
7955 East 106th Stree
Fishers, Indiana
�o���
�o
317..849s935
Fax: 317.849Z942
www.Stoeppelwerth coin
1
STOEPPELWERTH ASSOCIATES, IN
Attention: Greg Hoyes
Dear Mr. Hoyes:
LAND SURVEYORS
CONSUU00GEN(�lNEbK6"
Hamilton County Surveyor's Offlce
One Hamilton County Square
Suite 188
Noblesville, Indiana 46060
April 18, 2012
Re: The Legacy Master Infrastructure,
Phase 2
As you are aware, the property previously owned by East Carmel, LLC
covered by The Legacy PUD has been transferred to a new owner, Falcon Nest II,
LLC. Falcon Nest LLC has retained Platinum Properties, LLC to serve as the local
developer for purposes of cornpleting the project. AS requested by the Carmel
Engineering Department, Stoeppelwerth and Associates in cooperation with
Williams Creek Consulting have completed revisions to the attached construction
plans, drainage calculations and water quality report for the above referenced
project in order to secure approval to re-commence construction. Simar to the
previous set of approved plans for this project, the attached revised set is broken
into separate projects, and the owner intends to comptete Project ject 1 at this time.
After you have completed your review, then we will provide a new engineers
estimate for Project 1 and the owner will provide new performance bonds in
accordance with the estimate. The items that have changed specific to your area
ofreview are reflected below, and we have attached a copyofthe Ietter
addressed to Gary Duncan with the Engineering Department describing the
rernainder of the revised items for your reference.
0 The foliowing sheets on the construction plans did not change: C200-C202,
C206, C208, C302, C400, C402-C408, C600, C700-C703, C801-806 and C901-
C905.
m The previously presented Project 1 has been separated into two projects
requiring the p ect num ers to change. In general, Pr 'ect1\ndudes
Hamilton County Surveyors Office
April 18,2Ol2
Page 2
Connnnunhy Drive and earthwork and storm sewer construction related to
the detention basin in the south east corner of the overall Legacy project,
Project 2indudesCherryCreakBou|evardeasiofConnnou
includes west des [hcrp/ Creek Boulevard vv stof[ononounity Drive ending at the
4includes [h y Creek Boulevard west
of intersection, Project err
of Project 3 ending at the second western intersection, and Project 5
includes Cherry Creek Boulevard west of Pr ject 4 ending at Existing Cherry
Creek Boulevard to the west
The previously induded ternporary grading plan for and all references to
Baptist Homes of Indiana and/orthe Prairie Landing project ject have been
removed (southwest of round-a-bout) and replaced with temporary
grading and erosion contro measures for The Meadows at Legacy
(adjusted construction limits in The Meadows at Legacy area).
The previously designed wet pond shown in the southeast corner of the
Legacy development (Lake #6) has been re-designed as a dry detention
basin including the installation of a treatment liner as a well-head in the detention
protection measure i th areasandinc|udinDanopenchanne|
to convey drainage for the Tunis Gerarci Legal Dram. This revision also
eliminated the dewatering plan necessary for c,onstruction of the wet
pond.
The constructed wetland BMP previously shown adjacent to Lake #1 has
been removed as it is not necessary for water quality purposes related to
the construction described in these plans (was previously ncluded as a
BK4Phjr the now defunct Prairie Landing project).
0
The constructd wetland BMP previously shown north of Cherry Creek
Boulevard ast of Community Drive has heen removed as it 15 not
necessary for water quality purposes related to the construction described
in these plans (was as previous|y included as a BMP for the currently on-hold
Dornain at the Legacy project).
Project 1 now includes construction of the linear swale in the future
median of Cherry Creek Boulevard west terminating at the existing storm
sewer trunkline that was installed as part of' he Legacy Residential, Section
One, Phase One.
0 Storm sewer plan and profiles within the Cherry Creek Boulevard right-of-
way have been revised to accommodate the propbsed The Meadows at
Legacy. The revised storm structures are as foUows: (listed by location
along Cherry Creek Boulevard from West to East) l42,143,458,458A,3O4,
453, 377, 448, 400, and 400A.
Storm plan and profiles have been revised at the south end of proposed
Community Drive. Invert elevations, pipe sizes and storrn structure
Iocations have changed to accommodate the proposed The Meadows at
Legacy.
Hamilton County Surveyor's Office
Aph\18,2012
Page 3
Emergency Overflow has been slightly revised south of Cherry Creek
Boulevard, and west of the rounda-bout per the new design in The
Meadows at Legacy area.
has been revised per the new storm sewer design
Thedr�)nn�eropor as een e
a \ongvViththenarrativeindudingad'ustnnen\stothe 2,10, a nd1U0 y oar
elevations for the linear basins
w The water quality report has been revised to include the specifications
described in the construction documents for the installation of the
treatment Iiher for well head protection
If you have any questioflS, or comrnents regarding these revisions, please
feel free to contact me at bhuff@stoepVe|vverth.comor S
Cc: Tim Wafter
Angie Conn
Respectfully submitted,
STOEPPELWERTH ASSOCIATES, INC.
Brett A. Huff
a«o/meu
sA5suspm~w2\o|uc_uvvN«c ncy o.,e,pu^demce\xarnmn^counmSumpyomovao*1a'o.uom
David J. Stoeppelworth
President, CEO
Professional Engineer
Professional Land Surveyor
Curtis 0. HUff
Vice President, COO
Professional Land Surveyor
RM.
Founder
Professional Engineer
Professional Land Surveyor
r96s East /oaoStreet
Fishers, Indiana
*ema'zaoo
317.849.5935
Fax: 317.849.5942
STOEPPELWERTH ASSOCIATES, INC_
CONSULTING ENGINEERS LAND SURVEYORS
[arnne|VVater —VVastevvaterUtUhjes
345O West 13lstStreet
Carmel, Indiana 46O74
Attention: Paul Pace
Dear Mr. Pace:
April 18, 2012
Re: The Legacy Master Infrastructure,
Phase 2
As you may be aware, the property previously owned by East Carmel, LLC
covered by The Legacy PUD has been transferred to a new owner, Falcon Nest 11,
LLC. Falcon Nest LLC has retained Platinum Properties, LLC to serve as the local
cleveloper for purposes of completing the project. Per the request of the
Engineering Department, Stoeppelwerth and Associates in cooperation with
VVilliams Creek Consulting have completed revisions to the attached construction
pans, and water quality report for the above referenced project ject in order to secure
approval to recornrnence construction. Similar to the previous set of approved
plans for this project, the attached revised set is broken into separate projects,
and the owner intends to complete Pr ject 1 at this time. The items that have
changed specific to your area of review are reflected below, and we have attached
a copy of the letter addressed to Gary Duncan with the Engineering Department
describing the remainder of the revised items for your reference.
The previously presented Project 1 has been separated into two p 'ects
requiring the project numbers to change. In genera, Project ject 1 includes
Cornrnunity Drive and earthwork and storm sewer construction related to
the detention basin in the south east corner of the overall Legacy project,
Project 2 includesCherry Creek Bouevard east of Cornmunity Drive, Project
3 indudes Cherry Creek Boulevard west of Community Drive ending at the
first western intersection, Pr ject 4 includes Cherry Creek Boulevard west
of Project 3 ending at the second western intersection, and Project 5
includes Cherry Creek Boutevard west of Project ject 4 ending at Existing Cherry
Creek Boulevard to the west.
Carnne|VVater VVastewaterUt|biea
April 1O,lOIl
Page 2
The previousy designed ed wet pond shown in the southeast corner of the
Legacy development (Lake #6) has been re-designed as a dry detention
basin including the iristallation of a treatment liner as a weII-head
protection measure in the detention areas and induding an open channel
t� convey drainage for the Tunis Gerard Legal Dram. This revision also
eliminated the dewatering plan necessary for construction of the wet
pond.
m The sanitary sewer road crossing shown previously on sheet C500
(structure nurnbers 744-745) has been eliminated. This is no Ionger
necessary as sewer service to the southwest corner of the Legacy
developrnent will be provided through the new The Meadows at Legacy
design.
The vvater quality report has been revised to include the specifications
described in the construction documents for the installation of the
treatment liner for well head protection.
If you have any questions, or cornments regarding these revisions, please
feel free to contact me at bhuffPstoeppelwerth.com or (317) 570-4841.
Cc: Tim Walter
Angie Conn
John Duffy
Respectfully subMitted,
BAHVrneu
SA5szzsp/A'Mz\mve_uook\xu ncy_c ,,e,ponuence\Cannemvmewvastewmte,pace04-1*oumcx
David J. Stoeppelwerth
President, CEO
Professional Engineer
Processional Land Surveyor
Curtis C. Huff
Vice President, COO
Professional Land Surveyor
R.M. Stoeppelwerth
Founder
Professional Engineer
Professional Land Surveyor
7965 East 106th Street
Fishers, Indiana
46038 -2505
317.849.5935
Fax: 317 849 5942
www Stoeppelwerth.com
STOEPPELWERTH ASSOCIATES, INC.
CONSULTING ENGINEERS LAND SURVEYORS
Carmel Sewer
760 3rd SW, Suite 110
Carmel, Indiana 46032
Attention: Aaron Hoover
April 18, 2012
Re: The Legacy Master Infrastructure,
Phase 2
Dear Mr. Hoover:
As you may be aware, the property previously owned by East Carmel, LLC covered
by The Legacy PUD has been transferred to a new owner, Falcon Nest II, LLC. Falcon Nest
II, LLC has retained Platinum Properties, LLC to serve as the local developer for purposes
of completing the project. Per the request of the Engineering Department, Stoeppelwerth
and Associates in cooperation with Williams Creek Consulting have completed revisions to
the attached construction plans for the above referenced project in order to secure
approval to re- commence construction. Similar to the previous set of approved plans for
this project, the attached revised set is broken into separate projects, and the owner
intends to complete Project 1 at this time. The items that have changed specific to your
area of review are reflected below, and we have attached a copy of the letter addressed
to Gary Duncan with the Engineering Department describing the remainder of the revised
items for your reference.
0 The sanitary sewer road crossing shown previously on sheet C500 (structure
numbers 744 -745) has been eliminated. This is no longer necessary as sewer
service to the southwest corner of the Legacy development will be provided
through the new The Meadows at Legacy design.
If you have any questions, or comments regarding these revisions, please feel free
to contact me at bhufffPstoeppelwerth.com or (317) 570 -4841.
Respectfully submitted,
STOEPPELWERTH ASSOCIATES, INC.
Brett A. Huff
Cc: Tim Walter
Angie Conn
John Duffy
BAH /mete
S: \55115 PLA -M2 \Blue_- Book \Agency_ Correspondence \CarmeIDOCS- Conn04- 1 12.docx
David J, Stoeppelwerth
President, CEO
Professional Engineer
Professional Land Surveyor
Curtis 0. Huff
Vice President, COO
Professional Land Surveyor
n
Founder
Professional Engineer
Professional Land Surveyor
7965 East 106th Street
Fishers, Indiana
46038-2505
317.849.5935
Fax: 317.849.5942
STOEPPELWERTH ASSOCIATES, INC.
CONSULTING ENGTNEERS LAND SURVEYORS
Carrnel Water Utilities
3450 Wes 131st Street
Carmel, IN 46074
Attention: Steve Cook
Dear Mr, Cook:
April 18, 2012
Re: The Legacy Master nfrastructure,
phase
As you may be aware, the property previously owned by East Carmel, LLC covered
by The Legacy PUD has been transferred to a new owner, Falcon Nest H, LLC Falcon Nest
U, LL[ has retained Platinum Properties, LLC to serve as the local developer for purposes
of completing the project. Per the request of the Engineering Department, Stoeppe|werth
and Associates in cooperation with Williams Creek Consulting have completed revisions to
the attached construction plans for the above referenced project in order to secure
approval to re-commence construction. Similar to the previous set of approved plans for
this project, the attached revised set is broken into separate projects, and the owner
intends to complete Project 1 at this time. There were no changes made to items specific
to your area of review. However, we have attached a copy ofthe letter addressed to Gary
Duncan with the Engineering Department describing the revised items for your reference.
If you have any questions, or comments regarding these revisions, please feel free
to contact meat bhufWstoeppe|xverthzomo/(] 17 57 O -484 l.
Respectfully submitted,
STOEPPELWERTH ASSOCIATES, INC.
Cc: Tim Walter
Angie Conn
John Duffy
axxmeu
m�n�\�r m����
s�\ssu5pm'M�\n|",_oonmAxe^�_cone,no
David J. Stoeppelwerth
President, CEO
Professional Engineer
Professional Land Surveyor
Curtis C. Huff
Vice President, COO
Professional Land Surveyor
n
Stoeppelwerth
Founder
Professional Engineer
Professional Land Surveyor
7965 East 106th Street
Fishers, Indiana
317 849
Fax: 317 849,5942
www Stoeppelwerth.com
STOEPPELWERTH ASSOCIATES, INC.
CONSULTING ENGINEERS LAND SURVEYORS
Carmel En inear\ngDepartment
K8S4Admin\strator
1 Floor
nor
Carmel, Indiana 46O3l
Attention: John Thomas
Dear Mr. Thomas:
April 18,Z0I2
Re: The Legacy Master Infrastructure,
Phase 2
As you are aware, the property previously owned by East Carm&, LLC
covered by The Legacy PUD has been transferred to a new owner, Falcon Nest II,
LLC. Falcon Nest LLC has retained Platinum Properties, LLC to serve as the local
developer tor purposes of comple'ting the project. As requested by the
Engineering Department, Stoeppelwerth and Associates in cooperation with
Williams Creek Consulting have completed revisions to the attached construction
plans, drainage calculations and water quality report for the above referenced
projec't in order to secure approvat to recornrnence construction Similar to the
previous set of approved plans for this project, theattachedrev\sedsetisbroken
into separate projects, and the owner intends to complete Project 1 at this time.
After you have completed your review, then we will provide a new engineers
estimate for Project 1 and the owner will provide new performance bonds in
accordance with the estimate. In addition, while you are reviewing the ptans we
will prepare requisite paperwork to secure a Stormwater Management Permit
from the City as well as a new IDEM Rule 5 Notice of Intent for the new owner.
The following is a listing of items that have been revised and/or addressed through
the revision process.
a
The foltowing sheets on the constructiofl plans did not change: C200-C202,
C206, C208, C302, C400 C4U2,C408,C68O,C70O-C703,[8Ol-886 and C9O1-
C905.
Carmel Engineering Department
K0S4Adm|n\strator
April 18,2012
Page 2
The previously presented P ject 1 has been separated into two projects
ih the project In Pnject1indudes
requiring PcU change. general,
Community Drive and earthwork'and storm sewer construction related to
the detention basin in the south east corner of the overall Legacy project,
Project 2 includes Cherry Creek Boulevard east of Community Drive, Project
3 includes Cherry Creek Bouevard west of Community Drive ending at the
first western intersection, Project 4 includes Cherry Creek Boulevard west
of Project 3 encling at the second western intersectiofl, and Project ject 5
includes Cherry Creek Boutevard west of Project ject 4 ending at Existing Cherry
Creek Boulevard to the west.
The previously induded temporary grading plan for and all references to
Baptist Homes of Indiana and/or the Prairie Landing project have been
removed (southwest of round-a-bout) and replaced with temporary
grading and erosion control measures for The Meadows at Legacy
(adjusted construction Iimits in The Meadows at Legacy area).
The prev\oualydesignedvvetpnndshovvnin
Legacy development (Lake #6) has been re-designed as a dry detention
basin including the installation of a treatment liner as a well-head
protection measure in the detention areas and including an open channel
to convey drainage fnrthe Tunis Gerard Legal Drain. This revision also
eliminated the dewatering plan necessary for construction of the wet
pond.
The constructed wetland BMP previousy shown adjacent to Lake #J. has
been removed as his not necessary for water quality purposes related to
the construdion described in theseplans (was previously included as a
BMP for the now defunct Prairie Landing pr jectL
The constructed wetland BMP previously shown north of Cherry Creek
Boutevard east of Community Drive has been removed as it 15 not
necessary for water quality purposes related to the construction described
in these plans (was previously included as a BMP for the currently on-hold
Domain at the Legacy pr ject\.
Project 1 now includes construction of the linear svva}e in the future
median of Cherry Creek Boulevard west terminating at the existing storm
sewer trunkline that was installed as part of The Legacy Residential, Section
One, Phase One.
O Storm sewer plan and profiles withn the Cherry Creek Boulevard right-of-
way have been revised to accommodate the proposed The Meadows at
Legacy. The revised storm structures are as follows: (listed by location
along Cherry Creek Boulevard from West to East) 142, 143, 458, 458A, 384,
453,377,448,48O, and 4OOA.
Storm pan and profiles have heen revised at the south end of proposed
Community Drive. Invert elevations, pipe sizes and storm structure
Carmel Engineering Department
K854Administrztur
April 18,l012
Page 3
Iocaflons have changed to accornrnodate the proposed The Meadows at
Legacy.
Emergenc\/ Overflow has been siightiy revised south of Cherry Creek
Boulevard and west of the round-a-bout per the new design in The
Meadows at Legacy area.
Revisions have been made to address the marl soil areas in the proposed
The Meadows at Legacy area
O The sanitary sewer road crossing shown previously on sheet C500
/structurenurnbers744-745\ has been e|irninatod.This isnolonger
necessary
deve!opment wifl be provded through the new The Meadows at Legacy
design.
has been revised per the nevxstornn sewer design
Thed/ain��erepoML as eenr
a\ongvvid)thenanativeindudingadjus
&evations for the linear basins.
m The proposed pr 'ec1|inmitshevebeennondifiedinthevvotarqun\ityreport
to reflec:t project conditions differing from those anticipated during the
2009 submittal.
The water quaUty report has been revised to include the specifications
described in the construction docunnants for the installation ofthe
treatment Uner for well head protection.
Areas not in the "east" Iegacy drainage basn have ben removed from the
water quality report and will he addressed durg the pending Master
Water Quality PIan submittal.
If you have any questions, or comments regarding these revisions, please
feel free 10 contact noeatbhuff@stneppe|vverthzomor 578-484
Cc: Tim Wafter
Angie Conn
Gary buncnn
Respectfully submitted,
STOEPPELWERTH ASSOCIATES, INC.
Brett A. Huff
David J. Stooppelwerth
President, CEO
Professional Engineer
Professional Land Surveyor
Curtis C Huff
Vice President, COO
Professional Land Surveyor
Stoeppelwerth
Founder
Professional Engineer
Professional Land Surveyor
7965 East 106th Street
Fishers, Indiana
317,849 5935
Faxu17 o4v.5o42
STOEPPELWERTH ASSOCIATES, INC.
CONSULTING ENGINEERS LAND SURVEYORS
Carmel City Utilities
760 3rd Avenue SW
Suite 110
Carmel, Indiana 46O32
Attention: John Duffy
Dear Mr. Duffy:
April 18, 2012
Re: The Legacy Master Infrastructure,
Phase 2
As you are aware, the property previously owned by East Carmel, LLC
covered by The Legacy PUD has been transferred to a new owner, Falcon Nestll,
LLC. Falcon Nest |i LLC has retained Platinum Properties, LLC to serve as the local
developer for purposes of compteting the project. Per the request of the
Engineering Department, Stoeppelwerth and Associates in cooperation with
Williams Creek Consulting have completed revisions to the attached construction
plans, and water quality report for the above referenced project in order to secure
approval to recommence construction. Similar to the previous set of approved
plans for this project, the attached revised set is broken into separate projects,
ancl the owner intends to complete Project 1atthistirno. The items that have
changed speCificto your area of review are reflected below, and we have attached
a copy of the letter addressed to Gary Duncan with the Engineering Department
describing the remainder ofthe revised items for your reference.
0 The previously presented P ject 1 has been separated into two projects
requiring the project numbers to change. In general, Project 1 includes
st
[0nomu Drive and earthvvo/kand sto/nnse vv er con r uction related to
the detention basn in the south east corner of the overaU Legacy project,
Project 2 includes Cherry Creek Boulevard east of Community Drive, Project
3 includes Cherry Creek Bouevard west of Comrnunity Drive ending at the
first western intersection, Project 4 includes Cherry Creek Boulevard west
of ending at second and Project 5
P��ect en nOa the
Carmel City UtfltieS
April 18, 2012
Page 2
inctudes Cherry Creek Boulevard west of Project 4 eiding at Existing Cherry
Creek Boulevard to the west.
The previously des\Qhed wet pond shown in the southeast corner of the
Legacy development (Lake#6\hasbeen re-designed asa dry detention
(Lake at
basin including the inataU treatment re head
in protection measure
i the detention areas and including an open channel
to convey drainage for the Tunis Gerard Legal Drain. This revision also
eliminated the dewatering pian necessary for construction of the wet
pond.
w The sanitary sewer road crossing shown previously on sheet CS00
(structure numhers 744-745) has been eliminated. This is no Ionger
necessary as sewer service to the southwest corner of the Legacy
development will be provided idedthroughthenevvTheK
design.
The water quahty report has heen revised to ncIude the specificationS
described in the coristructiofl documents for the installation of the
treatment liner for welt head protection.
If you have any questions, or cornrnents regarding these revisions, please
feel free to contact me at bhuff@stoeppelwerth.corn or (317) 570-4841.
Cc: Tim Walter
Angie Conn
Respectfully submitted,
ST0EPPELVVE 'H INC.
Brett A. Huff
BAH/meb mlites-D««04-13 '12,docx
David J. Stoeppetwerth
President, CEO
Professional Engineer
Professional Land Surveyor
Curtis C. Huff
Vice President, 000
Professional Land Surveyor
R.
Founder
Professional Engineer
Professional Land Surveyor
7965 East 106th Street
Fishers, Indiana
*onno-25n5
317 849.5935
Fax: mr.849 ay42
���'�����n'� Y� ASSOCIATES, �Z INC.
CONSULTING ENGINEERS LAND SURVEYORS
Carmel Department of Community Services
Transportation Systems Coordinator
One Civic Square
Carmel, Indiana 46032
Attention: David Littlejohn
Dear Mr. Littlejohn:
April 18, 2012
Re: The Legacy Master Infrastructure,
Phase 2
As you may be aware, the property previously owned by East Carmel, LLC covered
by The Legacy PUD has been transferred to a new owner, Falcon Nest LLC. Falcon Nest
II, LLC has retained Platinum Properties, LLC to serve as the local developer for purposes
of completing the project. Per the request of the Engineering Department, 6tueppeieerth
and Associates in cooperation with WitIiams Creek Consulting have completed revisions to
the attached construction plans for the above referenced project in order to secure
approval tn/e-cummenceconstruction. Similar to the previous set of approved plans for
this project, the attached revised set is broken into separate projects, and the owner
intends to complete Project 1 at this time. There were no changes made to items specific
to your area of review. However, we have attached a copy of the letter addressed to Gary
Duncan with the Engineering Department describing the revised items for your reference,
If you have any questions, or comments regarding these revisions, please feel free
to contact me at bhuff@stoeppelwerth.com or (317) 570-4841.
Respectfully submitted,
STOEPPELWERTH ASSOCIATES, INC,
DmttA.Huff
Tim Walter
Angie Conn
ax*/ne»
[c:
David J. Stoeppelwerth
President, CEO
Professional Engineer
Professional Land Surveyor
Curtis C. Huff
Vice President, COO
Professional Land Surveyor
R.M. Stoeppelwerth
Founder
Professional Engineer
Professional Land Surveyor
7965 East 106th Street
Fishers, Indiana
46038 -2505
317 849 5935
Fax: 317,849,5942
www. Stoeppelwerth,eom
STOEPPELWERTH ASSOCIATES4 INC.
Attention Daren Mindham
Dear Mr. Mindham:
CONSULTING ENGINEERS LAND SURVEYORS
Carmel Department of Community Services
Urban Forester
One Civic Square
Carmel, Indiana 46032
April 18, 2012
Re: The Legacy Master Infrastructure,
Phase 2
As you may be aware, the property previously owned by East Carmel, LLC covered
by The Legacy PUD has been transferred to a new owner, Falcon Nest II, LLC. Falcon Nest
II, LLC has retained Platinum Properties, LLC to serve as the local developer for purposes
of completing the project. Per the request of the Engineering Department, Stoeppelwerth
and Associates in cooperation with Williams Creek Consulting have completed revisions to
the attached construction plans for the above referenced project in order to secure
approval to re- commence construction. Similar to the previous set of approved plans for
this project, the attached revised set is broken into separate projects, and the owner
intends to complete Project 1 at this time. The items that have changed specific to your
area of review are reflected below, and we have attached a copy of the letter addressed
to Gary Duncan with the Engineering Department describing the remainder of the revised
items for your reference.
We have reflected changes to the planting details and plant list for this project in
accordance with the comments you made in review of The Meadows at Legacy
and The Overlook at Legacy.
If you have any questions, or comments regarding these revisions, please feel free
to contact me at bhuff@stoeppelwerth.com or (317) 570 -4841.
Respectfully submitted,
ST EPPELWERTH &,AS OCIATES, INC.
✓r/
Cc. Tim Walter
Angie Conn
BAH /meb