Loading...
HomeMy WebLinkAboutCorrespondence to TAC mbrsCurtis C. Huff Vice President, COO Professional Land Surveyor r96a East 1u6thStreet Fishers, Indiana 4souvaoo* David J. Stoeppelwerth President, CEO Professional Professional Land Surveyor R.M. Stoeppelwerth Founder Professional Engineer Professional Land Surveyor mru49:o93s Fax: u1rmaso42 STOEPPELWERTH ASSOCIATES, INC. Carmel Engineering Department One Civic Square, L Fioor Carmel, Indiana 46032 Attention: Gary Duncan Dear Mr. Duncan: CONSULTING ENGINEERS LANO]8l{YB"�[RS April 1O,2012 Re: The Legacy Master nfrastructure, Phase 2 As you are aware, the property previoUsly owned by East Carmel, LLC covered by The Legacy PUD has been transferred to a new owner, Faicon Nest H, LLC. Falcon Nest |i LL[ has retained Platinum Properties, LLC to serve as the local developer [or purposes of compteting the project project. As requested in your emaiI dated March 22, 2012 Stoeppelwerth Stoeppelwerth and Associates in cooperatiofl with WiUiams Creek Consulting have completed revisions to the attached construction plans, drainage calculations artd water quality report for the above referenced project ject in order to secure approval to re-commence constructiOfl. Similar to the previous set of approved plans for this project, the attached revised set is broken into separate projects, and the owner intends to complete Prn)` ct 1 at this time, After you have completed your review, then we will provide a new engineers estimate for Project 1 and the owner will provide new p erh»rnnancebonds\nacco[dancavv i i the noxvevvU|preparerequisite estimate. |nadd0on,Vvhi\eyouarerevevvn� epa paperwork toSecure a Stormwater Management Permit from the City as well as a new |DEK4 Rule 5 Notice of Intent for the new owner. The following is a listing of items that have been revised and/or addressed through the revision process. m The foliowing sheets on the construction pians did not change: C200-C202, C206,C208,[302,C400,C402-C408 C6OU,[7OO-C7O3,C8Ol-805 and [9O1- C905. w The previously presented Project 1 has been separated into two projects requiring the project numbers to change. In general, Project 1 includes CbrnnnunityDriveandearthvvorkondstornosexve/construction related to the detention basin in the south east corner of the overall Legacy project, Carmel Engineering Department April 18, 2012 Page 2 Project 2 includes Cherry Creek Boulevard east pf Communit'/ Drive, Project 3 includes Cherry Creek Boulevard we of Comrnunity Drive ending at the first western intersection, Project 4 indudes Cherry Creek Boulevard west of Project 3 endijig at the second western intersection, and Project 5 ncludes Cherry Creek Boulevard west of Project t4endingatExistingCheny Creek Boulevard to the west m The previousty inciuded temporary grading ptan for and alt references to Baptist Hornes of Indiana and/orthe Prairie Landing project have been removed (southwest of round-a-bout) and replaced with temporary grading and erosion control measures fbr The Meadows at Legacy (adjusted construction lirnits in The Meadows at Legacy area). a The The previously designed wet pond shown in the southeast c:orner of the Legacy developo ent (Lake #6) has been re-designed as a dry detention basin including the installation of a treatment liner as a well-head protection measure in the detention areas and including an open channel to convey drainage for the Tunis Gerard Legal Dram This revision also eliminated the dewatering plan necessary for construction of the wet pond. m The constructed wetland BMP previously shown adjacent to Lake #1 has been removed as it is not necessary for water quality purposes related to the construction described in these plans (was previously included as a 8K4P for the now defunct Prairie Landing project). 0 The constructed wetland BMP previo.uslyshown north of Cherry Creek Boulevard east of Community Drive has been removed as it is not necessary for water quatity purposes related to the construction described in these plans (was previously included as a BMP for the currently on-hold Domain at the Legacy project). Project 1 now includes construction ofthe linear swale in the future median of Cherry Creek Boulevard west terminating at the existing storm sewer trunkline that was installed as part of The Legacy Residential, Section One, Phase One. m Storrn sewer plan and profiles within the Cherry Creek Boulevard right-of- way havebeenrevisedtoaccVrnnnodatetheproposadTheK Legacy. The revised storm structures are as follows: (listed by location n|Ong Cherry Creek Boulevard from West to East) l42,143,45O,458A,384, 453, 377, 448, 400, and 400A. Storm plan and profites have been revised at the south end of proposed Community Drive. Invert elevations, pipesizes and storm structure locations have changed to accommodate the proposed The Meadows at Legacy. w Ernergency Overflow has been slightly revised south of Cherry Creek Bouevard, and west of the round-ahout per the new design in The Meadows at Legacy area. Carmel Engineering Departnnent April D8,20l2 Revsions have heeri made to address the mari soll areas in the proposed The Meadows at Legacy area. o The sanitary sewer road crossing shown previously on sheet C500 (structurenVnnbers744 has been e!ino\nated.This isnolonger necessary as sewer service to the southwest corner of the Legacy developrnent wUl be provided through the new The Meadows at Legacy design. The drainage report has been revised per the new storm sewer design to 2, 10, |o with �enanatiye\ndudin�adjustments e a n�vx eievations for the linear basins. The proposed p jectUnoitshavebaennoodNodind)evvaterqua|hv/eport to reflect project conditions diff ringfrnnnthoseantidpatedduringihe 2009 submittal. The water quality report has been revised to nclude the specifications described in the construction docurnents for the instaflation of the treatment liner for well head protecton. Areas not in the "east" Iegacy drainage basn have been removed from the water quality report and wilt be addressed duringthe pending Master Water Quality Plan submittal. If you have any questions, or comments regarchng these revisions, please feel free to contact me at bhuff@stoeppelwerth.com or (317) 570-4841. Cc: Angie Conn oamnmind,am David Littlejohn Greg Hoye Paul pace Aaron Hoover John Duffy Steve Cook s,eg||ko Respectfully submitted, STOEPPELWERTH ASSOCIATES, INC. Brett A. Huff BAH/meb S:\55115PLA-M2 Blue, Book 'za1zoom David J. Stoeppelwerth President, CEO Professional Engineer Professional Land Surveyor Curtis C. Huff Vice President, COO Professional Land Surveyor x Founder Professional Engineer Professional Land Surveyor 7955 East 106th Stree Fishers, Indiana �o��� �o 317..849s935 Fax: 317.849Z942 www.Stoeppelwerth coin 1 STOEPPELWERTH ASSOCIATES, IN Attention: Greg Hoyes Dear Mr. Hoyes: LAND SURVEYORS CONSUU00GEN(�lNEbK6" Hamilton County Surveyor's Offlce One Hamilton County Square Suite 188 Noblesville, Indiana 46060 April 18, 2012 Re: The Legacy Master Infrastructure, Phase 2 As you are aware, the property previously owned by East Carmel, LLC covered by The Legacy PUD has been transferred to a new owner, Falcon Nest II, LLC. Falcon Nest LLC has retained Platinum Properties, LLC to serve as the local developer for purposes of cornpleting the project. AS requested by the Carmel Engineering Department, Stoeppelwerth and Associates in cooperation with Williams Creek Consulting have completed revisions to the attached construction plans, drainage calculations and water quality report for the above referenced project in order to secure approval to re-commence construction. Simar to the previous set of approved plans for this project, the attached revised set is broken into separate projects, and the owner intends to comptete Project ject 1 at this time. After you have completed your review, then we will provide a new engineers estimate for Project 1 and the owner will provide new performance bonds in accordance with the estimate. The items that have changed specific to your area ofreview are reflected below, and we have attached a copyofthe Ietter addressed to Gary Duncan with the Engineering Department describing the rernainder of the revised items for your reference. 0 The foliowing sheets on the construction plans did not change: C200-C202, C206, C208, C302, C400, C402-C408, C600, C700-C703, C801-806 and C901- C905. m The previously presented Project 1 has been separated into two projects requiring the p ect num ers to change. In general, Pr 'ect1\ndudes Hamilton County Surveyors Office April 18,2Ol2 Page 2 Connnnunhy Drive and earthwork and storm sewer construction related to the detention basin in the south east corner of the overall Legacy project, Project 2indudesCherryCreakBou|evardeasiofConnnou includes west des [hcrp/ Creek Boulevard vv stof[ononounity Drive ending at the 4includes [h y Creek Boulevard west of intersection, Project err of Project 3 ending at the second western intersection, and Project 5 includes Cherry Creek Boulevard west of Pr ject 4 ending at Existing Cherry Creek Boulevard to the west The previously induded ternporary grading plan for and all references to Baptist Homes of Indiana and/orthe Prairie Landing project ject have been removed (southwest of round-a-bout) and replaced with temporary grading and erosion contro measures for The Meadows at Legacy (adjusted construction limits in The Meadows at Legacy area). The previously designed wet pond shown in the southeast corner of the Legacy development (Lake #6) has been re-designed as a dry detention basin including the installation of a treatment liner as a well-head in the detention protection measure i th areasandinc|udinDanopenchanne| to convey drainage for the Tunis Gerarci Legal Dram. This revision also eliminated the dewatering plan necessary for c,onstruction of the wet pond. The constructed wetland BMP previously shown adjacent to Lake #1 has been removed as it is not necessary for water quality purposes related to the construction described in these plans (was previously ncluded as a BK4Phjr the now defunct Prairie Landing project). 0 The constructd wetland BMP previously shown north of Cherry Creek Boulevard ast of Community Drive has heen removed as it 15 not necessary for water quality purposes related to the construction described in these plans (was as previous|y included as a BMP for the currently on-hold Dornain at the Legacy project). Project 1 now includes construction of the linear swale in the future median of Cherry Creek Boulevard west terminating at the existing storm sewer trunkline that was installed as part of' he Legacy Residential, Section One, Phase One. 0 Storm sewer plan and profiles within the Cherry Creek Boulevard right-of- way have been revised to accommodate the propbsed The Meadows at Legacy. The revised storm structures are as foUows: (listed by location along Cherry Creek Boulevard from West to East) l42,143,458,458A,3O4, 453, 377, 448, 400, and 400A. Storm plan and profiles have been revised at the south end of proposed Community Drive. Invert elevations, pipe sizes and storrn structure Iocations have changed to accommodate the proposed The Meadows at Legacy. Hamilton County Surveyor's Office Aph\18,2012 Page 3 Emergency Overflow has been slightly revised south of Cherry Creek Boulevard, and west of the rounda-bout per the new design in The Meadows at Legacy area. has been revised per the new storm sewer design Thedr�)nn�eropor as een e a \ongvViththenarrativeindudingad'ustnnen\stothe 2,10, a nd1U0 y oar elevations for the linear basins w The water quality report has been revised to include the specifications described in the construction documents for the installation of the treatment Iiher for well head protection If you have any questioflS, or comrnents regarding these revisions, please feel free to contact me at bhuff@stoepVe|vverth.comor S Cc: Tim Wafter Angie Conn Respectfully submitted, STOEPPELWERTH ASSOCIATES, INC. Brett A. Huff a«o/meu sA5suspm~w2\o|uc_uvvN«c ncy o.,e,pu^demce\xarnmn^counmSumpyomovao*1a'o.uom David J. Stoeppelworth President, CEO Professional Engineer Professional Land Surveyor Curtis 0. HUff Vice President, COO Professional Land Surveyor RM. Founder Professional Engineer Professional Land Surveyor r96s East /oaoStreet Fishers, Indiana *ema'zaoo 317.849.5935 Fax: 317.849.5942 STOEPPELWERTH ASSOCIATES, INC_ CONSULTING ENGINEERS LAND SURVEYORS [arnne|VVater —VVastevvaterUtUhjes 345O West 13lstStreet Carmel, Indiana 46O74 Attention: Paul Pace Dear Mr. Pace: April 18, 2012 Re: The Legacy Master Infrastructure, Phase 2 As you may be aware, the property previously owned by East Carmel, LLC covered by The Legacy PUD has been transferred to a new owner, Falcon Nest 11, LLC. Falcon Nest LLC has retained Platinum Properties, LLC to serve as the local cleveloper for purposes of completing the project. Per the request of the Engineering Department, Stoeppelwerth and Associates in cooperation with VVilliams Creek Consulting have completed revisions to the attached construction pans, and water quality report for the above referenced project ject in order to secure approval to recornrnence construction. Similar to the previous set of approved plans for this project, the attached revised set is broken into separate projects, and the owner intends to complete Pr ject 1 at this time. The items that have changed specific to your area of review are reflected below, and we have attached a copy of the letter addressed to Gary Duncan with the Engineering Department describing the remainder of the revised items for your reference. The previously presented Project 1 has been separated into two p 'ects requiring the project numbers to change. In genera, Project ject 1 includes Cornrnunity Drive and earthwork and storm sewer construction related to the detention basin in the south east corner of the overall Legacy project, Project 2 includesCherry Creek Bouevard east of Cornmunity Drive, Project 3 indudes Cherry Creek Boulevard west of Community Drive ending at the first western intersection, Pr ject 4 includes Cherry Creek Boulevard west of Project 3 ending at the second western intersection, and Project 5 includes Cherry Creek Boutevard west of Project ject 4 ending at Existing Cherry Creek Boulevard to the west. Carnne|VVater VVastewaterUt|biea April 1O,lOIl Page 2 The previousy designed ed wet pond shown in the southeast corner of the Legacy development (Lake #6) has been re-designed as a dry detention basin including the iristallation of a treatment liner as a weII-head protection measure in the detention areas and induding an open channel t� convey drainage for the Tunis Gerard Legal Dram. This revision also eliminated the dewatering plan necessary for construction of the wet pond. m The sanitary sewer road crossing shown previously on sheet C500 (structure nurnbers 744-745) has been eliminated. This is no Ionger necessary as sewer service to the southwest corner of the Legacy developrnent will be provided through the new The Meadows at Legacy design. The vvater quality report has been revised to include the specifications described in the construction documents for the installation of the treatment liner for well head protection. If you have any questions, or cornments regarding these revisions, please feel free to contact me at bhuffPstoeppelwerth.com or (317) 570-4841. Cc: Tim Walter Angie Conn John Duffy Respectfully subMitted, BAHVrneu SA5szzsp/A'Mz\mve_uook\xu ncy_c ,,e,ponuence\Cannemvmewvastewmte,pace04-1*oumcx David J. Stoeppelwerth President, CEO Professional Engineer Processional Land Surveyor Curtis C. Huff Vice President, COO Professional Land Surveyor R.M. Stoeppelwerth Founder Professional Engineer Professional Land Surveyor 7965 East 106th Street Fishers, Indiana 46038 -2505 317.849.5935 Fax: 317 849 5942 www Stoeppelwerth.com STOEPPELWERTH ASSOCIATES, INC. CONSULTING ENGINEERS LAND SURVEYORS Carmel Sewer 760 3rd SW, Suite 110 Carmel, Indiana 46032 Attention: Aaron Hoover April 18, 2012 Re: The Legacy Master Infrastructure, Phase 2 Dear Mr. Hoover: As you may be aware, the property previously owned by East Carmel, LLC covered by The Legacy PUD has been transferred to a new owner, Falcon Nest II, LLC. Falcon Nest II, LLC has retained Platinum Properties, LLC to serve as the local developer for purposes of completing the project. Per the request of the Engineering Department, Stoeppelwerth and Associates in cooperation with Williams Creek Consulting have completed revisions to the attached construction plans for the above referenced project in order to secure approval to re- commence construction. Similar to the previous set of approved plans for this project, the attached revised set is broken into separate projects, and the owner intends to complete Project 1 at this time. The items that have changed specific to your area of review are reflected below, and we have attached a copy of the letter addressed to Gary Duncan with the Engineering Department describing the remainder of the revised items for your reference. 0 The sanitary sewer road crossing shown previously on sheet C500 (structure numbers 744 -745) has been eliminated. This is no longer necessary as sewer service to the southwest corner of the Legacy development will be provided through the new The Meadows at Legacy design. If you have any questions, or comments regarding these revisions, please feel free to contact me at bhufffPstoeppelwerth.com or (317) 570 -4841. Respectfully submitted, STOEPPELWERTH ASSOCIATES, INC. Brett A. Huff Cc: Tim Walter Angie Conn John Duffy BAH /mete S: \55115 PLA -M2 \Blue_- Book \Agency_ Correspondence \CarmeIDOCS- Conn04- 1 12.docx David J, Stoeppelwerth President, CEO Professional Engineer Professional Land Surveyor Curtis 0. Huff Vice President, COO Professional Land Surveyor n Founder Professional Engineer Professional Land Surveyor 7965 East 106th Street Fishers, Indiana 46038-2505 317.849.5935 Fax: 317.849.5942 STOEPPELWERTH ASSOCIATES, INC. CONSULTING ENGTNEERS LAND SURVEYORS Carrnel Water Utilities 3450 Wes 131st Street Carmel, IN 46074 Attention: Steve Cook Dear Mr, Cook: April 18, 2012 Re: The Legacy Master nfrastructure, phase As you may be aware, the property previously owned by East Carmel, LLC covered by The Legacy PUD has been transferred to a new owner, Falcon Nest H, LLC Falcon Nest U, LL[ has retained Platinum Properties, LLC to serve as the local developer for purposes of completing the project. Per the request of the Engineering Department, Stoeppe|werth and Associates in cooperation with Williams Creek Consulting have completed revisions to the attached construction plans for the above referenced project in order to secure approval to re-commence construction. Similar to the previous set of approved plans for this project, the attached revised set is broken into separate projects, and the owner intends to complete Project 1 at this time. There were no changes made to items specific to your area of review. However, we have attached a copy ofthe letter addressed to Gary Duncan with the Engineering Department describing the revised items for your reference. If you have any questions, or comments regarding these revisions, please feel free to contact meat bhufWstoeppe|xverthzomo/(] 17 57 O -484 l. Respectfully submitted, STOEPPELWERTH ASSOCIATES, INC. Cc: Tim Walter Angie Conn John Duffy axxmeu m�n�\�r m���� s�\ssu5pm'M�\n|",_oonmAxe^�_cone,no David J. Stoeppelwerth President, CEO Professional Engineer Professional Land Surveyor Curtis C. Huff Vice President, COO Professional Land Surveyor n Stoeppelwerth Founder Professional Engineer Professional Land Surveyor 7965 East 106th Street Fishers, Indiana 317 849 Fax: 317 849,5942 www Stoeppelwerth.com STOEPPELWERTH ASSOCIATES, INC. CONSULTING ENGINEERS LAND SURVEYORS Carmel En inear\ngDepartment K8S4Admin\strator 1 Floor nor Carmel, Indiana 46O3l Attention: John Thomas Dear Mr. Thomas: April 18,Z0I2 Re: The Legacy Master Infrastructure, Phase 2 As you are aware, the property previously owned by East Carm&, LLC covered by The Legacy PUD has been transferred to a new owner, Falcon Nest II, LLC. Falcon Nest LLC has retained Platinum Properties, LLC to serve as the local developer tor purposes of comple'ting the project. As requested by the Engineering Department, Stoeppelwerth and Associates in cooperation with Williams Creek Consulting have completed revisions to the attached construction plans, drainage calculations and water quality report for the above referenced projec't in order to secure approvat to recornrnence construction Similar to the previous set of approved plans for this project, theattachedrev\sedsetisbroken into separate projects, and the owner intends to complete Project 1 at this time. After you have completed your review, then we will provide a new engineers estimate for Project 1 and the owner will provide new performance bonds in accordance with the estimate. In addition, while you are reviewing the ptans we will prepare requisite paperwork to secure a Stormwater Management Permit from the City as well as a new IDEM Rule 5 Notice of Intent for the new owner. The following is a listing of items that have been revised and/or addressed through the revision process. a The foltowing sheets on the constructiofl plans did not change: C200-C202, C206, C208, C302, C400 C4U2,C408,C68O,C70O-C703,[8Ol-886 and C9O1- C905. Carmel Engineering Department K0S4Adm|n\strator April 18,2012 Page 2 The previously presented P ject 1 has been separated into two projects ih the project In Pnject1indudes requiring PcU change. general, Community Drive and earthwork'and storm sewer construction related to the detention basin in the south east corner of the overall Legacy project, Project 2 includes Cherry Creek Boulevard east of Community Drive, Project 3 includes Cherry Creek Bouevard west of Community Drive ending at the first western intersection, Project 4 includes Cherry Creek Boulevard west of Project 3 encling at the second western intersectiofl, and Project ject 5 includes Cherry Creek Boutevard west of Project ject 4 ending at Existing Cherry Creek Boulevard to the west. The previously induded temporary grading plan for and all references to Baptist Homes of Indiana and/or the Prairie Landing project have been removed (southwest of round-a-bout) and replaced with temporary grading and erosion control measures for The Meadows at Legacy (adjusted construction Iimits in The Meadows at Legacy area). The prev\oualydesignedvvetpnndshovvnin Legacy development (Lake #6) has been re-designed as a dry detention basin including the installation of a treatment liner as a well-head protection measure in the detention areas and including an open channel to convey drainage fnrthe Tunis Gerard Legal Drain. This revision also eliminated the dewatering plan necessary for construction of the wet pond. The constructed wetland BMP previousy shown adjacent to Lake #J. has been removed as his not necessary for water quality purposes related to the construdion described in theseplans (was previously included as a BMP for the now defunct Prairie Landing pr jectL The constructed wetland BMP previously shown north of Cherry Creek Boutevard east of Community Drive has been removed as it 15 not necessary for water quality purposes related to the construction described in these plans (was previously included as a BMP for the currently on-hold Domain at the Legacy pr ject\. Project 1 now includes construction of the linear svva}e in the future median of Cherry Creek Boulevard west terminating at the existing storm sewer trunkline that was installed as part of The Legacy Residential, Section One, Phase One. O Storm sewer plan and profiles withn the Cherry Creek Boulevard right-of- way have been revised to accommodate the proposed The Meadows at Legacy. The revised storm structures are as follows: (listed by location along Cherry Creek Boulevard from West to East) 142, 143, 458, 458A, 384, 453,377,448,48O, and 4OOA. Storm pan and profiles have heen revised at the south end of proposed Community Drive. Invert elevations, pipe sizes and storm structure Carmel Engineering Department K854Administrztur April 18,l012 Page 3 Iocaflons have changed to accornrnodate the proposed The Meadows at Legacy. Emergenc\/ Overflow has been siightiy revised south of Cherry Creek Boulevard and west of the round-a-bout per the new design in The Meadows at Legacy area. Revisions have been made to address the marl soil areas in the proposed The Meadows at Legacy area O The sanitary sewer road crossing shown previously on sheet C500 /structurenurnbers744-745\ has been e|irninatod.This isnolonger necessary deve!opment wifl be provded through the new The Meadows at Legacy design. has been revised per the nevxstornn sewer design Thed/ain��erepoML as eenr a\ongvvid)thenanativeindudingadjus &evations for the linear basins. m The proposed pr 'ec1|inmitshevebeennondifiedinthevvotarqun\ityreport to reflec:t project conditions differing from those anticipated during the 2009 submittal. The water quaUty report has been revised to include the specifications described in the construction docunnants for the installation ofthe treatment Uner for well head protection. Areas not in the "east" Iegacy drainage basn have ben removed from the water quality report and will he addressed durg the pending Master Water Quality PIan submittal. If you have any questions, or comments regarding these revisions, please feel free 10 contact noeatbhuff@stneppe|vverthzomor 578-484 Cc: Tim Wafter Angie Conn Gary buncnn Respectfully submitted, STOEPPELWERTH ASSOCIATES, INC. Brett A. Huff David J. Stooppelwerth President, CEO Professional Engineer Professional Land Surveyor Curtis C Huff Vice President, COO Professional Land Surveyor Stoeppelwerth Founder Professional Engineer Professional Land Surveyor 7965 East 106th Street Fishers, Indiana 317,849 5935 Faxu17 o4v.5o42 STOEPPELWERTH ASSOCIATES, INC. CONSULTING ENGINEERS LAND SURVEYORS Carmel City Utilities 760 3rd Avenue SW Suite 110 Carmel, Indiana 46O32 Attention: John Duffy Dear Mr. Duffy: April 18, 2012 Re: The Legacy Master Infrastructure, Phase 2 As you are aware, the property previously owned by East Carmel, LLC covered by The Legacy PUD has been transferred to a new owner, Falcon Nestll, LLC. Falcon Nest |i LLC has retained Platinum Properties, LLC to serve as the local developer for purposes of compteting the project. Per the request of the Engineering Department, Stoeppelwerth and Associates in cooperation with Williams Creek Consulting have completed revisions to the attached construction plans, and water quality report for the above referenced project in order to secure approval to recommence construction. Similar to the previous set of approved plans for this project, the attached revised set is broken into separate projects, ancl the owner intends to complete Project 1atthistirno. The items that have changed speCificto your area of review are reflected below, and we have attached a copy of the letter addressed to Gary Duncan with the Engineering Department describing the remainder ofthe revised items for your reference. 0 The previously presented P ject 1 has been separated into two projects requiring the project numbers to change. In general, Project 1 includes st [0nomu Drive and earthvvo/kand sto/nnse vv er con r uction related to the detention basn in the south east corner of the overaU Legacy project, Project 2 includes Cherry Creek Boulevard east of Community Drive, Project 3 includes Cherry Creek Bouevard west of Comrnunity Drive ending at the first western intersection, Project 4 includes Cherry Creek Boulevard west of ending at second and Project 5 P��ect en nOa the Carmel City UtfltieS April 18, 2012 Page 2 inctudes Cherry Creek Boulevard west of Project 4 eiding at Existing Cherry Creek Boulevard to the west. The previously des\Qhed wet pond shown in the southeast corner of the Legacy development (Lake#6\hasbeen re-designed asa dry detention (Lake at basin including the inataU treatment re head in protection measure i the detention areas and including an open channel to convey drainage for the Tunis Gerard Legal Drain. This revision also eliminated the dewatering pian necessary for construction of the wet pond. w The sanitary sewer road crossing shown previously on sheet CS00 (structure numhers 744-745) has been eliminated. This is no Ionger necessary as sewer service to the southwest corner of the Legacy development will be provided idedthroughthenevvTheK design. The water quahty report has heen revised to ncIude the specificationS described in the coristructiofl documents for the installation of the treatment liner for welt head protection. If you have any questions, or cornrnents regarding these revisions, please feel free to contact me at bhuff@stoeppelwerth.corn or (317) 570-4841. Cc: Tim Walter Angie Conn Respectfully submitted, ST0EPPELVVE 'H INC. Brett A. Huff BAH/meb mlites-D««04-13 '12,docx David J. Stoeppetwerth President, CEO Professional Engineer Professional Land Surveyor Curtis C. Huff Vice President, 000 Professional Land Surveyor R. Founder Professional Engineer Professional Land Surveyor 7965 East 106th Street Fishers, Indiana *onno-25n5 317 849.5935 Fax: mr.849 ay42 ���'�����n'� Y� ASSOCIATES, �Z INC. CONSULTING ENGINEERS LAND SURVEYORS Carmel Department of Community Services Transportation Systems Coordinator One Civic Square Carmel, Indiana 46032 Attention: David Littlejohn Dear Mr. Littlejohn: April 18, 2012 Re: The Legacy Master Infrastructure, Phase 2 As you may be aware, the property previously owned by East Carmel, LLC covered by The Legacy PUD has been transferred to a new owner, Falcon Nest LLC. Falcon Nest II, LLC has retained Platinum Properties, LLC to serve as the local developer for purposes of completing the project. Per the request of the Engineering Department, 6tueppeieerth and Associates in cooperation with WitIiams Creek Consulting have completed revisions to the attached construction plans for the above referenced project in order to secure approval tn/e-cummenceconstruction. Similar to the previous set of approved plans for this project, the attached revised set is broken into separate projects, and the owner intends to complete Project 1 at this time. There were no changes made to items specific to your area of review. However, we have attached a copy of the letter addressed to Gary Duncan with the Engineering Department describing the revised items for your reference, If you have any questions, or comments regarding these revisions, please feel free to contact me at bhuff@stoeppelwerth.com or (317) 570-4841. Respectfully submitted, STOEPPELWERTH ASSOCIATES, INC, DmttA.Huff Tim Walter Angie Conn ax*/ne» [c: David J. Stoeppelwerth President, CEO Professional Engineer Professional Land Surveyor Curtis C. Huff Vice President, COO Professional Land Surveyor R.M. Stoeppelwerth Founder Professional Engineer Professional Land Surveyor 7965 East 106th Street Fishers, Indiana 46038 -2505 317 849 5935 Fax: 317,849,5942 www. Stoeppelwerth,eom STOEPPELWERTH ASSOCIATES4 INC. Attention Daren Mindham Dear Mr. Mindham: CONSULTING ENGINEERS LAND SURVEYORS Carmel Department of Community Services Urban Forester One Civic Square Carmel, Indiana 46032 April 18, 2012 Re: The Legacy Master Infrastructure, Phase 2 As you may be aware, the property previously owned by East Carmel, LLC covered by The Legacy PUD has been transferred to a new owner, Falcon Nest II, LLC. Falcon Nest II, LLC has retained Platinum Properties, LLC to serve as the local developer for purposes of completing the project. Per the request of the Engineering Department, Stoeppelwerth and Associates in cooperation with Williams Creek Consulting have completed revisions to the attached construction plans for the above referenced project in order to secure approval to re- commence construction. Similar to the previous set of approved plans for this project, the attached revised set is broken into separate projects, and the owner intends to complete Project 1 at this time. The items that have changed specific to your area of review are reflected below, and we have attached a copy of the letter addressed to Gary Duncan with the Engineering Department describing the remainder of the revised items for your reference. We have reflected changes to the planting details and plant list for this project in accordance with the comments you made in review of The Meadows at Legacy and The Overlook at Legacy. If you have any questions, or comments regarding these revisions, please feel free to contact me at bhuff@stoeppelwerth.com or (317) 570 -4841. Respectfully submitted, ST EPPELWERTH &,AS OCIATES, INC. ✓r/ Cc. Tim Walter Angie Conn BAH /meb S: \55115P LA- IV12 \BI ue_ Book \Agancy_ Correspondence \CarmeIDOCS -M ind ha m04- 13- 12.docx