Loading...
HomeMy WebLinkAbout208391 04/25/2012 CITY OF CARMEL, INDIANA VENDOR: 00351732 Page 1 of 1 ONE CIVIC SQUARE MORPHEY CONSTRUCTION INC CHECK AMOUNT: $25,829.10 CARMEL, INDIANA 46032 1499 N SHERMAN DRIVE INDIANAPOLIS IN 46201 -1 51 5 CHECK NUMBER: 208391 CHECK DATE: 4/25/2012 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 2201 R4350080 25838 1 25,829.10 STREET LIGHTING /INTER CONSTRUCTION PROJECT INVOICE DATE: April 13, 2012 COMPANY NAME: Morphey Construction, Inc. AND ADDRESS 1499 N. Sherman Indianapolis, Indiana 46201 TELEPHONE NO.: (317)- 356 -9250 FAX NO.: (317)- 356 -9253 PROJECT NAME: Street Lighting and Signage Improvements Project PROJECT NO.: 11 -10 INVOICE NO.: 1 Construction pay items as per Progress Pay Estimates No. 1 as shown on the attached invoice for work completed between the dates of January 1, 2012 to April 12, 2012 TOTAL PAY THIS ESTIMATE: $28,699.00 MINUS 10% RETAINAGE: 2,869.90 TOTAL NOW DUE: $25,829.10 Submitted by CrossRoad Engineers, PC "a4- 3 /7pl v Project epresentative signed name bate Lance Stahley Project Representative printed name 1 of 2 CITY OF CARMEL INTERSECTION STREET LIGHTING AND SIGNAGE IMPROVEMENTS Project BASE and ALTERNATE BID PROJECT NO. 11 -10 PROGRESS PAY ESTIMATE NO. 01 For work done during the period of: 111112 through 4/12112 Item g Descnption T, 3 Quanhty this Total +Quanbty Umt Total Pays Total Pay No v Estimate to Date Pnce this Estimate to Date 1 Mobilization Demobilization 1.00 u LS 1.00 LS $119.00 $119.00 $119.00 2 Street Sign and Post, Remove 4.00 EA 4.00 EA $40.00 $160.00 $160.00 3 Li ht Pole Assembly and Foundation, Remove an EA EA $250.00 4 IDecorative Street Sign Assembly 4.00 EA 4.00 EA $1,200.00 $4,800.00 $4,800.00 5 Concrete Foundation with Grounding, 30 in. Diam 8.00 EA 8.00 EA $875.00 $7,000.00 $7,000.00 6 Light Pole Assembl Street EA EA $8,000.00 7 Cable Duct Marker NEA EA $100.00 1.00 EA $550.00 $550.00 $550.00 8 Handhole 1.00 9 Electric Rece tacle EA $250.00 10 Conduit, Steel, Galvanized, 2 in. LFT $18.50 11 Wire, No. 4, Co er, In 2 in. Galvanized Steel Con LFT $8.00 12 Conduit, PVC, 4" LFT 13 Wire, No. 4, Co er, In Plastic Duct, In Trench, 4 LFT $8.00 14 Controller Cabinet, P1, Modified 2.00 EA 2.00 EA $3,850.00 $7,700.00 $7,700.00 15 Controller Cabinet Foundation, P1, Modified 2.00 EA 2.00 EA $950.00 $1,900.00 $1,900.00 16 Mulched Seeding SYS SYS $1.50 17 Conduit, PVC, 314 IN LFT LFT $5.00 A -1 Mobilization Demobilization 1.00 LS 1.00 LS $119.00 $119.00 $119.00 A -2 Street Si n and Post, Remove 3.00 EA 3.00 EA $42.00 $126.00 $126.00 A -3 Light Pole Assembly and Foundation, Remove an EA EA $250.00 A-4 Decorative Street Sign Assembly 3.00 EA 3.00 EA $1,200.00 $3,600.00 $3,600.00 A -5 Concrete Foundation with Grounding, 30 in. Diam 3.00 EA 3.00 EA $875.00 $2,625.00 $2,625.00 A -6 Light Pole Assembly, Street EA EA $8,00010 A -7 Cable Duct Marker EA EA $100.00 A -8 Handhole EA EA $575.00 A -9 Conduit, Steel, Galvanized, 2 in. LFT LFT $18.50 A -10 Wire, No. 4, Copper, In 2 in. Galvanized Steel Con LFT LFT $8.00 A -11 Conduit, PVC, 4" LFT LFT A -12 Wire, No. 4, Copper, In Plastic Duct, In Trench, 4 1 LFT LFT $8.00 A -13 Existing Controller Cabinet, Modify EA EA $500.00 A -14 Mulched Seeding SYS SYS $1.50 A -15 Conduit, PVC, 3/4 IN LFT LFT $5.00 $28,699.00 $28,699.00 2of2 CITY OF CARMEL INTERSECTION STREET LIGHTING AND SIGNAGE IMPROVEMENTS Project BASE and ALTERNATE BID PROJECT NO. 11 -10 PROGRESS PAY ESTIMATE NO. 01 For work done during the period of: 11W2 through 4112/12 Lt m Dascn(Stron Quantity tins Fnral3Duanh Wni r 7atalMPa o!al Pay iio Esttmatc a to DatePn; this Estimate to Dste z TOTALS AND PAY ESTIMATE CALCULATIONS TOTAL PAY THIS ESTIMATE $28,699.00 TOTAL PAY TO DATE 828,699.00 DEDUCT 10% RETAINAGE 82,869.90 3 DEDUCT PREVIOUS NET PAY ESTIMATES NET PAY ESTIMATE NO. 01 $25,829.10 CrossRoad Engineers, PC Inspecting Firm 8 Date Morphey Construction inc CBY 9AW J I Convaetcir g Pr.SEC l 1AA NA C A ate Prescribed by State Board of Accounts ACCOUNTS PAYABLE VOUCHER City Form No. 201 (Rev. 1995) CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Purchase Order No. 1�1g9 Qv�(V/1 Terms ��Y17�S,. 3 g�p2c�1 Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) Total I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer VOUCHER NO. WARRANT NO. p ALLOWED 20 IN SUM OF 5--- 1 2 Z9,Q ON ACCOUNT OF APPROPRIATION FOR Board Members PO# or INVOICE NO. ACCT #!TITLE AMOUNT DEPT. I hereby certify that the attached invoice(s), or 2S 220 2 ,IQ bill(s) is (are) true and correct and that the SD�gv materials or services itemized thereon for which charge is made were ordered and received except 2�T? 20 Signature C��I ��Ct y�9,`✓ Cost distribution ledger classification if Title claim paid motor vehicle highway fund