Loading...
HomeMy WebLinkAboutB12211197.pdf GR01 T01 J01 GR02 J02 GR02 CG01 CG02 J04 J03 GE01 GR03 GR04 GE02 GE03 T07 GR05 T08GE04 V01 V02 V03 V04 V05 V06 GR06 GE05 T12 GR07 GE01 GE06 GE07 GE07 J05 GR08 T17 CG03 J06 J03 V07 V08 V09 V10 V11 V12 V13 V14 V15 V16 V17 V18 V19 V20 GE08 V21 V22 V23 V24 V25 V26 10-01-02 TOB 10-01-02 TOB HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HGUS26-2 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 PBE01 PBE02 PBE02 PBE03 PB03 M01(16) T03(2) T04(2) T11(3) T13(2) T14(3) T15(11) T16(7) M02(6) M03(10) M04(14) PB01(4) PB02(17) T06(7) T09(7) T01A(3) Preliminary 7-00-00 11-11-00 13-01-00 11-11-00 10-04-00 4-05-00 12-07-00 23-08-00 6-00-00 42-07-00 4-00-00 18-07-00 18-04-00 21-09-00 12-07-00 76-03-00 2-00-00 34-04-00 39-11-00 71-03-00 4-00-00 8-11-00 8-00-00 6-00-00 12-07-00 1-01-12 11-09-00 1-08-02 7-06 7-06 4-06-00 4-06-00 5-06-00 IRC 2006 TPI 2002 20TLL -10TDL -10BDL Wedgewood D70 Hassell Grandin Hall 3/16"=1' --May 1, 2012 PH 17 B12211197 NOTES: A) B) C) D) DO NOT CUT OR MODIFY TRUSSES. TRUSSES ARE SPACED 24" ON CENTER UNLESS OTHERWISE NOTED. REFER TO THE INDIVIDUAL TRUSS DESIGN DRAWINGS FOR THE LOCATION OF MEMBER BRACING, UPLIFT AND TRUSS END REACTIONS. INSTALLATION OF ALL TEMPORARY AND PERMANENT BRACING IS ESSENTIAL. SEE TRUSS DRAWINGS, BCSI-B2 SUMMARY SHEET AND BUILDING DESIGNER REQUIREMENTS. THIS LAYOUT IS INTENDED FOR THE PURPOSE OF TRUSS LOCATION AND PLACEMENT ONLY. REFER TO THE BUILDING PLANS FOR ACTUAL BUILDING CONSTRUCTION. TRUSS PLACEMENT GUIDE NOTE: ALL DIMENSIONS SHOWN 0-00-00 ARE IN FEET-INCHES-SIXTEENTHS DESIGNED BY: DATE: SCALE: COMMUNITY: MODEL: CUSTOMER: SHIP DATE: BUILDING CODE: DESIGN LOADS: LOT #: JOB #: 9028 Old SR 67 South Mooresville, IN 46158 Phone: 317-834-5380 Fax: 317-834-5390