Loading...
HomeMy WebLinkAboutDrainage Summary & CalculationsPreliminary Drainage Summary And Calculations For: The Lakes at Towne Road III Towne Road and 131 Street Carmel, Indiana Project #W12-0060 Prepared For: Indiana Land Development 12070 Abney Run Drive Zionsville, IN 46077 Prepared By: Andrew T. Miller, E.I. Certified By: James E. Shields, Jr., P.E. Date: 27 February 2012 Revised: 14 May 2012 1. Project Description 2. Post Developed Conditions 3. Back Cover Pocket Existing Conditions Map Developed Conditions Map W N :IHN; ENGINEERS Build rcith i dcrz_. Preliminary Calculations The Lakes at Towne Road III Carmel, Indiana Job No. W12-0014 TABLE OF CONTENTS The Lakes at Towne Road III, Shoopman Weihe Engineers, INC. 5/14/2012 1. PROJECT DESCRIPTION la. EXISTING CONDITIONS The Lakes at Towne Road III, Shoopman 5/14/2012 WFIHH ENGINEERS t'r ,i The Lakes at Towne Road III Preliminary Drainage Calculations The proposed project is located on a 10.102+ acre tract of land located on the West side of Towne Road, just North of Main Street (131 Street) in Carmel, Indiana. The site is generally located in part of Section 29, Township 18 North, Range 3 East in Clay Township, Hamilton County, Indiana with the following UTM coordinates, 86° 12' 18" W and 39° 39' 58" N. The pre developed site has been analyzed as three basins. The north basin drains to a swale along the southern boundary of an existing subdivision known as The Lakes at Towne Road. The south basin drains to a swale along the eastern boundary of an existing subdivision known as The Lakes at Hayden Run. The east basin drains to a road side ditch along Towne Road. All 3 on -site watersheds leave the site at different points but all drain to the J.W. Brendle Drain. There are no off -site drainage basins that will flow across the proposed development. See below for runoff rates for the on -site basins: Weihe Engineers, INC. Basin South 2 -year 2.016 c.f.s. 10 -year 5.239 c.f.s. 100 -year 14.342 c.f.s. 1. PROJECT DESCRIPTION la. EXISTING CONDITIONS The Lakes at Towne Road III, Shoopman 5/14/2012 WFIHH ENGINEERS t'r ,i The Lakes at Towne Road III Preliminary Drainage Calculations The proposed project is located on a 10.102+ acre tract of land located on the West side of Towne Road, just North of Main Street (131 Street) in Carmel, Indiana. The site is generally located in part of Section 29, Township 18 North, Range 3 East in Clay Township, Hamilton County, Indiana with the following UTM coordinates, 86° 12' 18" W and 39° 39' 58" N. The pre developed site has been analyzed as three basins. The north basin drains to a swale along the southern boundary of an existing subdivision known as The Lakes at Towne Road. The south basin drains to a swale along the eastern boundary of an existing subdivision known as The Lakes at Hayden Run. The east basin drains to a road side ditch along Towne Road. All 3 on -site watersheds leave the site at different points but all drain to the J.W. Brendle Drain. There are no off -site drainage basins that will flow across the proposed development. See below for runoff rates for the on -site basins: Weihe Engineers, INC. Basin North 2 -year 1.456 c.f.s. 10 -year 3.252 c.f.s. 100 -year 7.956 c.f.s. 1. PROJECT DESCRIPTION la. EXISTING CONDITIONS The Lakes at Towne Road III, Shoopman 5/14/2012 WFIHH ENGINEERS t'r ,i The Lakes at Towne Road III Preliminary Drainage Calculations The proposed project is located on a 10.102+ acre tract of land located on the West side of Towne Road, just North of Main Street (131 Street) in Carmel, Indiana. The site is generally located in part of Section 29, Township 18 North, Range 3 East in Clay Township, Hamilton County, Indiana with the following UTM coordinates, 86° 12' 18" W and 39° 39' 58" N. The pre developed site has been analyzed as three basins. The north basin drains to a swale along the southern boundary of an existing subdivision known as The Lakes at Towne Road. The south basin drains to a swale along the eastern boundary of an existing subdivision known as The Lakes at Hayden Run. The east basin drains to a road side ditch along Towne Road. All 3 on -site watersheds leave the site at different points but all drain to the J.W. Brendle Drain. There are no off -site drainage basins that will flow across the proposed development. See below for runoff rates for the on -site basins: Weihe Engineers, INC. Basin East 2 -year 1.295 c.f.s 10 -year 3.591 c.f.s 100 -year 10.108 c.f.s. 1. PROJECT DESCRIPTION la. EXISTING CONDITIONS The Lakes at Towne Road III, Shoopman 5/14/2012 WFIHH ENGINEERS t'r ,i The Lakes at Towne Road III Preliminary Drainage Calculations The proposed project is located on a 10.102+ acre tract of land located on the West side of Towne Road, just North of Main Street (131 Street) in Carmel, Indiana. The site is generally located in part of Section 29, Township 18 North, Range 3 East in Clay Township, Hamilton County, Indiana with the following UTM coordinates, 86° 12' 18" W and 39° 39' 58" N. The pre developed site has been analyzed as three basins. The north basin drains to a swale along the southern boundary of an existing subdivision known as The Lakes at Towne Road. The south basin drains to a swale along the eastern boundary of an existing subdivision known as The Lakes at Hayden Run. The east basin drains to a road side ditch along Towne Road. All 3 on -site watersheds leave the site at different points but all drain to the J.W. Brendle Drain. There are no off -site drainage basins that will flow across the proposed development. See below for runoff rates for the on -site basins: Weihe Engineers, INC. Required Detention Release Rate (cfs) Pond Elevation (ft) 2 -year 0.552 903.69 10 -year 0.849 904.24 100 -year 2.107 905.41 Required Detention Allowable Release Rate (cfs) 2 -year 1.10 10 -year 1.10 100 -year 2.42 Required Detention 124,800 cubic feet Provided Detention 209,000 cubic feet The entire site is within of the J.W. Brendle drainage shed thus subject to the following release rate requirements; 0.1 cfs per acre of development for 0 -10 year return interval storms and 0.24 cfs per acre of development for 11 -100 year return interval storms. lb. DEVELOPED CONDITIONS While there are multiple points of discharge for the site, the allowable release rate based on the per acre development is the most restrictive and will be used for this development. The developed site will consist of 12 residential lots, surface streets, sidewalks, and a wet detention basin. All of the site runoff (along with the developed right -of -way per the City of Carmel 20 -year Thoroughfare Plan) will be conveyed to a wet detention basin located near the western boundary line of the proposed development. The proposed discharge point for this development will be to an existing 36" storm pipe located just west of the site. If future calculations show that the 36" stoim pipe does not have capacity; an easement will be obtained to drain south to the J.W. Brendle Drain (to a point where all of the existing drainage sheds flow). Modeling: This analysis was developed to ensure that the proposed drainage system can storm and convey stonnwater runoff based on the allowable release rates established above. In order to meet the release requirement, a 6" orifice was set at 903.00 for the 0 -10 year stoiiir event and a 6" orifice was set at 904.30' for the 100 year storm event. A free flow model with no tailwater was used to determine the peak release rates and elevation levels. The emergency overflow weir will be set at an elevation of 905.50 and set along the westerly bank of the proposed wet pond. The Lakes at Towne Road II1, Shoopman 5/14/2012 Weihe Engineers, INC. ICPR, version 3.02, by Streamline Technologies was used to analyze the post developed site. This program routes and analyzes all components in a storm system on a user defined time interval. Below is a list of the peak discharges and elevations for the site. lc. WATER QUALITY Water Quality for the site will be handled by a wet detention basin located near the western boundary of the development and storm inlet hoods located at the curb inlets. A special control outlet structure will be placed on the upstream end of the outlet pipe. This will hold back the water quality volume allow the sediment to settle and floatables to stay in the pond. The Lakes at Towne Road I11, Shoopman Weihe Engineers, INC. 5/14/2012 Stormwater Management Areas ICPR Calculations (Pre and Post) Supporting Documentation The Lakes at Towne Road III, Shoopman Weihe Engineers, INC. 5/14/2012