Loading...
HomeMy WebLinkAboutC1 Site Plan 5-21-12 KEELER WE c .} ASSOCIATES LETTER OF TRANSMITTAL I7 —- Consulting Engineers•Planners-Surveyors H —p — TELEPHONE(317)574-0140 www.keelerwebb_com 486 Gradle Drive ' ^ Carmel,Indiana 46032 DATE JOB NO. 5/21/2012 1112-023 TO City of Carmel ATTENTION Alexia Donahue Wold Dept. of Community Services RE: Starting Line Preschool One Civic Square 110 3rd Avenue NE Carmel, IN 46032 Carmel, Indiana WE ARE SENDING YOU ® Attached ❑ Under separate cover via _ Delivery the following items: ❑ Shop drawings El Prints El Plans El Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION 2 5/18/12 1 Situation Site Plan THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ® For your use ❑ Approved as noted El Submit copies for distribution ® As requested ❑ Returned for corrections El Return corrected prints ® For review and comment ❑ ❑ FOR BIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS This submittal will be heard at the next Carmel B.Z.A. meeting on May 29, 2012. The following items have been revised and directly correlate with the comments received on May 18, 2012: 10. Please submit a landscape plan/tree preservation plan. Daren Mindham,City Forester,will review this plan and provide review comments. (317-571-2417) The landscaping has been revised and resubmitted for review and approval. 11. Please provide the signage location and design details, including size, height,and colors. The signage location and details have been revised. 12. Road right of way(if any)will need to be dedicated to the City, per the Thoroughfare Plan. Please work with Gary Duncan in the Engineering Dept. on how much R/W is required. (317-271-2441.) Per Engineering there - is no need to dedicate any right-of-way for this project. Per Nick Redding a letter from Engineering is forthcoming. 13. Prepare an estimated construction cost to comply with the Thoroughfare Plan &Alternative Transportation Plan;contact the Engineering Dept. for more details. 317-571-2441. Per Engineering there is no construction cost for any work in the right-of-way for this project. 14. Please work with David Littlejohn,Alternative Transportation Systems Coordinator,on any sidewalk or side path requirements(if any); 317-571-2417. Per Mr. Littlejohn there is no need for any additional requirements for the sidewalks which are only a few years old. 15. Please show bike parking location and bike rack details, per section 27.06 of the ordinance. See the new bike rack location next to the garage. 16. Please provide the lot cover percentage. Please include the pavement and building footprints in this calculation. See the site data revision on sheet Cl. 17. Please provide details on the fence design. See the new fence detail on sheet Cl. Please contact me if you have any questions or concerns regarding this project. Starting Line Preschool COPY TO Dave Coots Attorney SIGNED: ADAM DeHART, LS If enclosures are not as noted, kindly notify us at once.