Loading...
HomeMy WebLinkAboutCorrespondence: Revisions 5-18-12COPIES DATE NO. DESCRIPTION 2 5/18/12 1 Situation Site Plan DATE 5/21/2012 JOB NO. 1112 023 ATTENTION Alexia Donahue Wold RE: Starting Line Preschool 110 3 Avenue NE Carmel, Indiana KEELER -WEBB ASSOCIATES LETTER OF TRANSMITTAL Consulting Engineers Planners Surveyors TELEPHONE (317) 574 -0140 www.keelerwebb.com 486 Grade Drive Carmel, Indiana 46032 TO City of Carmel Dept. of Community Services One Civic Square Carmel, IN 46032 WE ARE SENDING YOU Z Attached Under separate cover via Delivery the following items: Shop drawings Prints Plans Samples Specifications Copy of letter Change order THESE ARE TRANSMITTED as checked below: For approval Approved as submitted Resubmit copies for approval Z For your use Approved as noted Submit copies for distribution Z As requested Returned for corrections Return corrected prints Z For review and comment FOR BIDS DUE PRINTS RETURNED AFTER LOAN TO US REMARKS This submittal will be heard at the next Carmel B.Z.A. meeting on May 29, 2012. The following items have been revised and directly correlate with the comments received on May 18, 2012: 10. Please submit a landscape plan /tree preservation plan. Daren Mindham, City Forester, will review this plan and provide review comments. (317- 571 -2417) The landscaping has been revised and resubmitted for review and approval. 11. Please provide the signage location and design details, including size, height, and colors. The signage location and details have been revised. 12. Road right of way (if any) will need to be dedicated to the City, per the Thoroughfare Plan. Please work with Gary Duncan in the Engineering Dept. on how much R/W is required. (317- 271 2441.) Per Engineering there is no need to dedicate any right -of -way for this project. Per Nick Redding a letter from Engineering is forthcoming. 13. Prepare an estimated construction cost to comply with the Thoroughfare Plan Alternative Transportation Plan; contact the Engineering Dept. for more details. 317 571 -2441. Per Engineering there is no construction cost for any work in the right -of -way for this project. 14. Please work with David Littlejohn, Alternative Transportation Systems Coordinator, on any sidewalk or side path requirements (if any); 317 571 -2417. Per Mr. Littlejohn there is no need for any additional requirements for the sidewalks which are only a few years old. 15. Please show bike parking location and bike rack details, per section 27.06 of the ordinance. See the new bike rack location next to the garage. 16. Please provide the lot cover percentage. Please include the pavement and building footprints in this calculation. See the site data revision on sheet Cl. 17. Please provide details on the fence design. See the new fence detail on sheet Cl. Please contact me if you have any questions or concerns regarding this project. Starting Line Preschool COPY TO Dave Coots Attorney SIGNED: ADAM DeHART, LS If enclosures are not as noted, kindly notify us at once.