HomeMy WebLinkAbout105 C2.2 SWPPPEROSION CONTROL SCHEDULE AND SEQUENCING:
SITE DATA TABLE
GENERAL SITE DATA
WATERSHED HYDROLOGIC05120201120080
UNIT CODE05120201090070
CROOKED CREEK
ULTIMATE RECEIVING WATER
ESTIMATE OF PEAK
1.95 CFS (10 YR)
DISCHARGE FOR POST
CONSTRUCTION CONDITIONS
BROOKSTON SILTY CLAY LOAM
EXISTING SOILS
CROSBY SILT LOAM
ZONE X. AREAS DETERMINED TO BE
FLOOD PLAIN INFORMATION
OUTSIDE THE 0.2% ANNUAL CHANCE
FLOODPLAIN
MATERIAL HANDLING, STORAGE, AND SPILL PREVENTION
ABANDONED WELLS &NO ABANDONED WELLS OR SINKHOLES
SINKHOLESLOCATED WITHIN PROPERTY LIMITS
TEMPORARY AND PERMANENT STORM WATER QUALITY MEASURES
–
205 WEST WACKER DRIVE
SUITE 2125
CHICAGO, ILLINOIS
60606-1418
CA 00000696
KHA PROJECT # 168113021
–
No.
PE11011695
–STATE OF
–
LEGEND
–
–
Issue Date:5/21/12
’
REVISION INFORMATION
TEMPORARY EROSION CONTROL NOTES
TEMPORARY AND PERMANENT SURFACE STABILIZATION
SWPPP PROJECT SITE CONTACT:
POTENTIAL POLLUTANT SOURCES
EXISTING SOIL LIMITATIONS AND RECOMMENDATIONS
SITE GENERAL NOTES
Restaurant #:
OLIVE GARDEN
’
10222 N MICHIGAN ROAD
PROTOTYPE P-75L - WD
HSKP 2010.1
’
DD2-04-2012
CARMEL, IN
DRAWING
–
SWPPP FOR
–
CONSTRUCTION
C2.2