SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Project identification:
MATT THE MILLER’S TAVERN RESTAURANT
Suite 101
11 W. City Center Drive
Carmel, Indiana 46032
B. Building Owner:
PEDCOR INVESTMENTS, L.L.C.
770 Third Avenue, SWCarmel, Indiana 46032
Telephone: 317.587.0320
C. Architect PEDCOR DESIGN GROUP LLC 355 City Center
Drive Carmel, Indiana 46032 Telephone: 317.705.7979
Certifying Architect: James Robert Stutzman, AIA jrs@pedcor.net
D. Project summary (MATT THE MILLER’S RESTAURANT Suite 101):
1. Abbreviated Summary: This project is a new tenant improvement project
known as Matt the Miller’s Tavern.
E. Building Data Summary:
1. Matt the Miller’s tenant space Gross Area 5,517 s.f.
F. Codes: Comply with all applicable codes and regulations of authorities having
jurisdiction, including, but not limited to the following listing of codes and regulations:
1. Indiana Building Code (IBC 2006) 2008
2. Indiana Accessibility Code (ANSI A117.1-2003) 2008
3. Indiana Plumbing Code (UPC 1997) 1999
4. Indiana Mechanical Code (IMC 2006) 2008
5. Indiana Electrical Code (NFPA 70-2008) 2009
6. Indiana Fuel Gas Code (IFGC 2006) 2008
7. Indiana Fire Code (IFC 2006) 2008
8. NFPA 13-1999 Installation of Fire Sprinkler Systems 2002
9. NFPA 72-2002 Automatic Fire Detection Systems 2006
10. NFPA 90A- Installation of Air Conditioning & Ventilating
Systems 1999
11. NFPA 90B-Installatiob of Warm Air Heating & Air Conditioning
Systems 1999
12. Americans with Disabilities Act (ADA-ABA Accessibility 1991
Guidelines 2004) 2004
13. Americans with Disabilities Act (ADAAG 2992-2002) 1991
14. Minimum Design Loads for Buildings (ASCE 7-2005) 2008
15. Indiana Energy Conservation Code (ASHRAE 90.1 2007) 2010
G. Permits: The General Contractor (GC) shall apply for, obtain, and pay for the primary
building permits required to perform the Work. Special permits and specific bonds,
and fees are the responsibility of each applicable Subcontractor, including but not
limited to; utility tap fees; special bonding or fees; bonding for work in public right-of-
MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
01 11 00 -
CARMEL CITY CENTER Date 03.26.12 SUMMARY OF WORK
MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
way; licenses, and other related permits, fees, and approvals required by building
authorities Submit copies of all permits to Architect.
H. Codes: Comply with all applicable codes and regulations of authorities having
jurisdiction. Submit copies of all inspection reports, notices and similar
communications from authorities to Architect within 5 days of receipt.
I. Dimensions: Verify dimensions indicated on Drawings with field dimensions before
fabrication or ordering of materials. Do not scale dimensions from Drawings. Report
all discrepancies to the Architect.
J. Discrepancies: Notify Architect of conditions differing from those indicated on the
drawings or discrepancies within the drawings, or discrepancies between Drawings
and Specifications. Do not proceed without fully resolving such conditions or
discrepancies by notification to the Architect, and receiving a written decision of the
Architect. Actions taken without such resolution will be at the contractor or
subcontractors own risk and expense.
K. Definitions for terms used in the specifications:
1. Provide: Subcontractor is to Furnish and install, complete with all necessary
accessories, ready for intended use. Pay for all related costs.
2. Approved: Acceptance of item submitted for approval. Not a limitation or release
for compliance with the Contract Documents or regulatory requirements. Refer
to limitations of ‘Approved’ in General Conditions.
3. Match Existing: Match existing as acceptable to the Architect.
L. Intent: Drawings and specifications are intended to provide the basis for proper
completion of the Work suitable for the intended use by the Owner. Anything not
expressly set forth but which is reasonable, implied, or necessary for proper
performance of the Project shall be included in the Work at no additional cost to the
Owner, and within the Project time limits.
M. Writing style: Specifications are written in the imperative mode. Except where
specifically intended otherwise, the subject of all imperative statements is the
Subcontractor. For example, ‘Provide tile’ means ‘Subcontractor is required to
provide the tile.’
N. Wherever these Specifications use the term “Vendor” this will be interpreted to be the
same as, and interchangeable with, “Supplier”, “Manufacturer”, “Fabricator” or
“Manufacturer’s Representative”.
O. General: Cooperate fully with separate contractors so work on those contracts may
be carried out smoothly, without interfering with or delaying work under this Contract.
Coordinate the Work of this Contract with work performed under separate contracts.
PART 2 - PRODUCTS - Not Applicable To This Section
PART 3 - EXECUTION - Not Applicable To This Section
END OF SECTION 01 11 00