SECTION 01 21 00 - ALLOWANCES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements governing allowances.
1. Certain items are specified in the Contract Documents by allowances. Allowances have
been established in lieu of additional requirements and to defer selection of actual
materials and equipment to a later date when direction will be provided to Contractor. If
necessary, additional requirements will be issued by Change Order.
B. Types of allowances include the following:
1. Lump-sum allowances.
C. Related Requirements:
1. Section 01 22 00 "Unit Prices" for procedures for using unit prices.
1.3 SELECTION AND PURCHASE
A. At the earliest practical date after award of the Contract, advise Architect of the date when final
selection and purchase of each product or system described by an allowance must be
completed to avoid delaying the Work.
B. At Architect's request, obtain proposals for each allowance for use in making final selections.
Include recommendations that are relevant to performing the Work.
C. Purchase products and systems selected by Architect from the designated supplier.
1.4 ACTION SUBMITTALS
A. Submit proposals for purchase of products or systems included in allowances, in the form
specified for Change Orders.
1.5 INFORMATIONAL SUBMITTALS
A. Submit invoices or delivery slips to show actual quantities of materials delivered to the site for
use in fulfillment of each allowance.
MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
01 21 00 -
CARMEL CITY CENTER Date 03.26.12 ALLOWANCES
MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
B. Submit time sheets and other documentation to show labor time and cost for installation of
allowance items that include installation as part of the allowance.
C. Coordinate and process submittals for allowance items in same manner as for other portions of
the Work.
1.6 COORDINATION
A. Coordinate allowance items with other portions of the Work. Furnish templates as required to
coordinate installation.
1.7 LUMP-SUM ALLOWANCES
A. Allowance shall include cost to Contractor of specific products and materials ordered by Owner
or selected by Architect under allowance and shall include taxes, freight, and delivery to Project
site.
B. Unless otherwise indicated, Contractor's costs for receiving and handling at Project site, labor,
installation, overhead and profit, and similar costs related to products and materials ordered by
Owner under allowance shall be included as part of the Contract Sum and not part of the
allowance.
C. Unused Materials: Return unused materials purchased under an allowance to manufacturer or
supplier for credit to Owner, after installation has been completed and accepted.
1. If requested by Architect, retain and prepare unused material for storage by Owner.
Deliver unused material to Owner's storage space as directed.
1.8 ADJUSTMENT OF ALLOWANCES
A. Allowance Adjustment: To adjust allowance amounts, prepare a Change Order proposal based
on the difference between purchase amount and the allowance, multiplied by final measurement
of work-in-place where applicable. If applicable, include reasonable allowances for cutting
losses, tolerances, mixing wastes, normal product imperfections, and similar margins.
1. Include installation costs in purchase amount only where indicated as part of the
allowance.
2. If requested, prepare explanation and documentation to substantiate distribution of
overhead costs and other margins claimed.
3. Submit substantiation of a change in scope of work, if any, claimed in Change Orders
related to unit-cost allowances.
4. Owner reserves the right to establish the quantity of work-in-place by independent
quantity survey, measure, or count.
B. Submit claims for increased costs because of a change in scope or nature of the allowance
described in the Contract Documents, whether for the purchase order amount or Contractor's
handling, labor, installation, overhead, and profit.
1. Do not include Contractor's or subcontractor's indirect expense in the Change Order cost
amount unless it is clearly shown that the nature or extent of work has changed from
what could have been foreseen from information in the Contract Documents.
MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
01 21 00 -
CARMEL CITY CENTER Date 03.26.12 ALLOWANCES
MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
2. No change to Contractor's indirect expense is permitted for selection of higher- or lower-
priced materials or systems of the same scope and nature as originally indicated.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine products covered by an allowance promptly on delivery for damage or defects. Return
damaged or defective products to manufacturer for replacement.
3.2 PREPARATION
A. Coordinate materials and their installation for each allowance with related materials and
installations to ensure that each allowance item is completely integrated and interfaced with
related work.
3.3 SCHEDULE OF ALLOWANCES
A. Allowance No. 1: No allowances at this time.
END OF SECTION 01 21 00