SECTION 01 23 00 - ALTERNATES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for alternates.
1.3 DEFINITIONS
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined
in the Bidding Requirements that may be added to or deducted from the base bid amount if
Owner decides to accept a corresponding change either in the amount of construction to be
completed or in the products, materials, equipment, systems, or installation methods described
in the Contract Documents.
1. Alternates described in this Section are part of the Work only if enumerated in the
Agreement.
2. The cost or credit for each alternate is the net addition to or deduction from the Contract
Sum to incorporate alternate into the Work. No other adjustments are made to the
Contract Sum.
1.4 PROCEDURES
A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate
work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar
items incidental to or required for a complete installation whether or not indicated as part
of alternate.
B. Notification: Immediately following award of the Contract, notify each party involved, in writing,
of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred
for later consideration. Include a complete description of negotiated modifications to alternates.
C. Execute accepted alternates under the same conditions as other work of the Contract.
D. Schedule: A schedule of alternates is included at the end of this Section. Specification
Sections referenced in schedule contain requirements for materials necessary to achieve the
work described under each alternate.
MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
01 23 00 -
CARMEL CITY CENTER Issue Date 03.26.12 ALTERNATES
MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
A. List of Alternates:
1. Add Alternate No.1 – Change Style of Metal Railing: Replace railing shown in base
bid with railing as shown in Drawings as Alternate.
2. Add Alternate No.2 – Provide Tinted Black Mylar Film: Add black tinted mylar film on
windows, at locations indicated on Drawings.
3. Add Alternate No.3 – Provide Exterior Wood Shutters: Add exterior wood shutters at
windows, at locations indicated on Drawings.
END OF SECTION 01 23 00