HomeMy WebLinkAbout01 60 00.docMATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
01 60 00 -
CARMEL CITY CENTER Date 03.26.12 PRODUCT REQUIREMENTS
MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
SECTION 01 60 00 – PRODUCT REQUIREMENTS
PART 1 – GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for selections of products
for use in Project, and product delivery, storage, and handling.
B. Related Sections:
1. Division 01 "Alternates" for products selected under an alternate.
2. Division 01 "Substitution Procedures" for requests for substitutions.
1.3 DEFINITIONS
A. Products: Items purchased for incorporating into the Work, whether purchased for
Project or taken from previously purchased stock. The term "product" includes the term
"material," "equipment," "system," and terms of similar intent.
1.4 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle products using means and methods that will prevent
damage, deterioration, and loss, including theft. Comply with manufacturer's written
instructions.
B. Delivery and Handling:
1. Schedule delivery to minimize long-term storage at Project site and to prevent
overcrowding of construction spaces.
2. Coordinate delivery with installation time to ensure minimum holding time for
items that are flammable, hazardous, easily damaged, or sensitive to
deterioration, theft, and other losses.
3. Deliver products to Project site in an undamaged condition in manufacturer's
original sealed container or other packing system, complete with labels and
instructions for handling, storing, unpacking, protecting, and installing.
4. Inspect products on delivery to ensure compliance with the Contract documents
and to ensure that products are undamaged and properly protected.
C. Storage:
1. Store products to allow for inspection and measurement of quantity or counting of
units.
2. Store materials in a manner that will not endanger Project structure.
MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
01 60 00 -
CARMEL CITY CENTER Date 03.26.12 PRODUCT REQUIREMENTS
MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
3. Store products that are subject to damage by the elements, under cover in a
weather-tight enclosure above ground, with ventilation adequate to prevent
condensation.
4. Store cementitious products and materials on elevated platforms.
5. Store foam plastic from exposure to sunlight, except to the extent necessary for
period of installation and concealment.
6. Comply with product manufacturer's written instructions for temperature,
humidity, ventilation, and weather-protection requirements for storage.
7. Protect stored products from damage and liquids from freezing.
1.5 PRODUCT WARRANTIES
A. Warranties specified in other Sections shall be in addition to, and run concurrent with,
other warranties required by the Contract Documents. Manufacturer's disclaimers and
limitations on product warranties do not relieve Contractor of obligations under
requirements of the Contract documents.
1. Manufacturer's Warranty: Written warranty furnished by individual manufacturer
for a particular product and specifically endorsed by manufacturer to Owner.
2. Special Warranty: Written warranty required by the Contract documents to
provide specific rights for Owner.
B. Special Warranties: Prepare a written document that contains appropriate terms and
identification, ready for execution.
1. Refer to Divisions 02 through 49. Sections for specific content requirements and
particular requirements for submitting special warranties.
C. Submittal Time: Comply with requirements in Division 01 Section "Closeout
Procedures."
PART 2 - PRODUCTS
2.1 PRODUCT SELECTION PROCEDURES
A. General Product Requirements: Provide products that comply with the Contract
Documents, that are undamaged and, unless otherwise indicated, that are new at time
of installation.
B. Product Selection Procedures:
1. Product: Where Specifications name a single product and manufacturer, provide
the named product that complies with requirements.
2. Manufacturer/Source: Where Specifications name a single manufacturer or
source, provide a product by the named manufacturer or source that complies
with requirements.
3. Products: Where Specifications include a list of names of both products and
manufacturers, provide one of the products listed that complies with
requirements.
4. Manufacturers: Where Specifications include a list of manufacturers' names,
provide a product by one of the manufacturers listed that complies with
requirements.
MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
01 60 00 -
CARMEL CITY CENTER Date 03.26.12 PRODUCT REQUIREMENTS
MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101
5. Available Products: Where Specifications include a list of names of both
products and manufacturers, provide one of the products listed, or an unnamed
product, that complies with requirements.
6. Available Manufacturers: Where Specifications include a list of manufacturers,
provide a product by one of the manufacturers listed, or an unnamed
manufacturer, that complies with requirements.
7. Product Options: Where Specifications indicate that sizes, profiles, and
dimensional requirements on Drawings are based on a specific product or
system, provide the specified product or system.
8. Basis-of-Design Product: Where Specifications name a product and include a list
of manufacturers, provide the specified product or a comparable product by one
of the other named manufacturers. Drawings and Specifications indicate sizes,
profiles, dimensions, and other characteristics that are based on the product
named.
9. Visual Matching Specification: Where Specifications require matching an
established Sample, select a product that complies with requirements and
matches Architect's sample. Architect's decision will be final on whether a
proposed product matches.
10. Visual Selection Specification: Where Specifications include the phrase "as
selected from manufacturer's colors, patterns, and textures" or a similar phrase,
select a product that complies with other specified requirements.
a. Standard Range: Where Specifications include the phrase "standard
range of colors, patterns, textures" or similar phrase, Architect will select
color, pattern, density, or texture from manufacturer's product line that
does not include premium items.
b. Full Range: Where Specifications include the phrase "full range of colors,
patterns, textures" or similar phrase, Architect will select color, pattern,
density, or texture from manufacturer's product line that includes both
standard and premium items.
PART 3 - EXECUTION - Not Applicable To This Section
01 60 00 END OF SECTION