HomeMy WebLinkAbout07 21 00.docMATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 07 21 00 - CARMEL CITY CENTER Date 03.26.12 THERMAL INSULATION MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 SECTION 07 21 00 - THERMAL INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Foam plastic board insulation. 2. Glass-fiber blanket insulation 3. Foam plastic board insulation. 4. Mineral-wool blanket insulation. 5. Vapor retarders. B. Related Sections: 1. Section 07 13 53 "Elastomeric Sheet Waterproofing" for insulated drainage panels installed with waterproofing. 2. Section 07 24 19 "Water-Drainage Exterior Insulation and Finish System (EIFS)" for insulation specified as part of these systems. 3. Section 07 84 46 "Fire-Resistive Joint Systems" for insulation installed as part of a perimeter fire-resistive joint system. 1.3 ACTION SUBMITTALS A. Product Data: For each type of product indicated. 1.4 INFORMATIONAL SUBMITTALS A. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for each product. B. Research/Evaluation Reports: For foam-plastic insulation, from ICC-ES. 1.5 QUALITY ASSURANCE A. Surface-Burning Characteristics: As determined by testing identical products according to ASTM E 84 by a qualified testing agency. Identify products with appropriate markings of applicable testing agency. MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 07 21 00 - CARMEL CITY CENTER Date 03.26.12 THERMAL INSULATION MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 1.6 DELIVERY, STORAGE, AND HANDLING A. Protect insulation materials from physical damage and from deterioration due to moisture, soiling, and other sources. Store inside and in a dry location. Comply with manufacturer's written instructions for handling, storing, and protecting during installation. B. Protect foam-plastic board insulation as follows: 1. Do not expose to sunlight except to necessary extent for period of installation and concealment. 2. Protect against ignition at all times. Do not deliver foam-plastic board materials to Project site before installation time. 3. Quickly complete installation and concealment of foam-plastic board insulation in each area of construction. PART 2 - PRODUCTS 2.1 FOAM-PLASTIC BOARD INSULATION A. Molded-Polystyrene Board Insulation: ASTM C 578, of type and minimum compressive strength indicated below, with maximum flame-spread and smoke-developed indexes of 75 and 450, respectively, per ASTM E 84. 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Plymouth Foam. b. Dow Chemical Company (The). c. Owens Corning. d. Knauf USA. 2. Type I, 10 psi. 2.2 GLASS-FIBER BLANKET INSULATION A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. CertainTeed Corporation. 2. Guardian Building Products, Inc. 3. Johns Manville. 4. Knauf Insulation. 5. Owens Corning. B. Recycled Content: Postconsumer recycled content plus one-half of pre-consumer recycled content not less than 25 percent. C. Unfaced, Glass-Fiber Blanket Insulation: ASTM C 665, Type I; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively, per ASTM E 84; passing ASTM E 136 for combustion characteristics. D. Kraft-Faced, Glass-Fiber Blanket Insulation: ASTM C 665, Type II (non-reflective faced), Class C (faced surface not rated for flame propagation); Category 1 (membrane is a vapor barrier). MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 07 21 00 - CARMEL CITY CENTER Date 03.26.12 THERMAL INSULATION MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 E. Sustainability Requirements: Provide glass-fiber blanket insulation as follows: 1. Low Emitting: Insulation tested according to ASTM D 5116 and shown to emit less than 0.05-ppm formaldehyde. 2.3 MINERAL-WOOL BLANKET INSULATION A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Fibrex Insulations Inc. 2. Owens Corning. 3. Roxul Inc. 4. Thermafiber. B. Recycled Content: Postconsumer recycled content plus one-half of pre-consumer recycled content not less than 25 percent. C. Unfaced, Mineral-Wool Blanket Insulation: ASTM C 665, Type I (blankets without membrane facing); consisting of fibers; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively, per ASTM E 84; passing ASTM E 136 for combustion characteristics. D. Reinforced-Foil-Faced, Mineral-Wool Blanket Insulation: ASTM C 665, Type III (reflective faced), Class A (faced surface with a flame-spread index of 25 or less per ASTM E 84); Category 1 (membrane is a vapor barrier), faced with foil scrim, foil-scrim kraft, or foil-scrim polyethylene. 2.4 VAPOR RETARDERS A. Reinforced-Polyethylene Vapor Retarders: Two outer layers of polyethylene film laminated to an inner reinforcing layer consisting of either nylon cord or polyester scrim and weighing not less than 25 lb/1000 sq. ft., with maximum permeance rating of 0.0507 perm. 1. Products: Subject to compliance with requirements, provide one of the following: a. Raven Industries Inc.; DURA-SKRIM 6WW. b. Reef Industries, Inc.; Griffolyn T-65. B. Vapor-Retarder Tape: Pressure-sensitive tape of type recommended by vapor-retarder manufacturer for sealing joints and penetrations in vapor retarder. C. Vapor-Retarder Fasteners: Pancake-head, self-tapping steel drill screws; with fender washers. D. Single-Component Non-sag Urethane Sealant: ASTM C 920, Type I, Grade NS, Class 25, Use NT related to exposure, and Use O related to vapor-barrier-related substrates. E. Adhesive for Vapor Retarders: Product recommended by vapor-retarder manufacturer and has demonstrated capability to bond vapor retarders securely to substrates indicated. 2.5 INSULATION FASTENERS A. Adhesively Attached, Spindle-Type Anchors: Plate welded to projecting spindle; capable of holding insulation of specified thickness securely in position indicated with self-locking washer in place. MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 07 21 00 - CARMEL CITY CENTER Date 03.26.12 THERMAL INSULATION MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 1. Products: Subject to compliance with requirements, provide one of the following: a. AGM Industries, Inc.; Series T TACTOO Insul-Hangers. b. Gemco; Spindle Type. 2. Plate: Perforated, galvanized carbon-steel sheet, 0.030 inch thick by 2 inches square. 3. Spindle: Copper-coated, low-carbon steel; fully annealed; 0.105 inch in diameter; length to suit depth of insulation indicated. B. Insulation-Retaining Washers: Self-locking washers formed from 0.016-inch- thick galvanized- steel sheet, with beveled edge for increased stiffness, sized as required to hold insulation securely in place, but not less than 1-1/2 inches square or in diameter. 1. Products: Subject to compliance with requirements, provide one of the following: a. AGM Industries, Inc.; RC150. b. Gemco; R-150. C. Insulation Standoff: Spacer fabricated from galvanized mild-steel sheet for fitting over spindle of insulation anchor to maintain air space of 1 inch between face of insulation and substrate to which anchor is attached. 1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following: a. Gemco; Clutch Clip. D. Anchor Adhesive: Product with demonstrated capability to bond insulation anchors securely to substrates indicated without damaging insulation, fasteners, and substrates. 1. Products: Subject to compliance with requirements, provide one of the following: a. AGM Industries, Inc.; TACTOO Adhesive. b. Gemco; Tuff Bond Hanger Adhesive. PART 3 - EXECUTION 3.1 PREPARATION A. Clean substrates of substances that are harmful to insulation or vapor retarders, including removing projections capable of puncturing vapor retarders, or that interfere with insulation attachment. 3.2 INSTALLATION, GENERAL A. Comply with insulation manufacturer's written instructions applicable to products and applications indicated. B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time. C. Extend insulation to envelop entire area to be insulated. Cut and fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement. D. Provide sizes to fit applications indicated and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units to produce thickness indicated unless multiple layers are otherwise shown or required to make up total thickness. MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 07 21 00 - CARMEL CITY CENTER Date 03.26.12 THERMAL INSULATION MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 3.3 INSTALLATION OF BELOW-GRADE INSULATION A. On vertical surfaces, set insulation units using manufacturer's recommended adhesive according to manufacturer's written instructions. B. On horizontal surfaces, loosely lay insulation units according to manufacturer's written instructions. Stagger end joints and tightly abut insulation units. 3.4 INSTALLATION OF CAVITY-WALL INSULATION A. Foam-Plastic Board Insulation: Install pads of adhesive spaced approximately 24 inches o.c. both ways on inside face, and as recommended by manufacturer. Fit courses of insulation between wall ties and other obstructions, with edges butted tightly in both directions. Press units firmly against inside substrates. 3.5 INSTALLATION OF INSULATION FOR FRAMED CONSTRUCTION A. Apply insulation units to substrates by method indicated, complying with manufacturer's written instructions. If no specific method is indicated, bond units to substrate with adhesive or use mechanical anchorage to provide permanent placement and support of units. B. Foam-Plastic Board Insulation: Seal joints between units by applying adhesive, mastic, or sealant to edges of each unit to form a tight seal as units are shoved into place. Fill voids in completed installation with adhesive, mastic, or sealant as recommended by insulation manufacturer. C. Glass-Fiber or Mineral-Wool Blanket Insulation: Install in cavities formed by framing members according to the following requirements: 1. Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill the cavities, provide lengths that will produce a snug fit between ends. 2. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members. 3. Maintain 3-inch clearance of insulation around recessed lighting fixtures not rated for or protected from contact with insulation. 4. For metal-framed wall cavities where cavity heights exceed 96 inches, support unfaced blankets mechanically and support faced blankets by taping flanges of insulation to flanges of metal studs. 5. Vapor-Retarder-Faced Blankets: Tape joints and ruptures in vapor-retarder facings, and seal each continuous area of insulation to ensure airtight installation. a. Exterior Walls: Set units with facing placed toward as indicated on Drawings. 3.6 INSTALLATION OF INSULATION IN CEILINGS FOR SOUND ATTENUATION A. Where glass-fiber blankets are indicated for sound attenuation above ceilings, install blanket insulation over entire ceiling area in thicknesses indicated. Extend insulation 48 inches up either side of partitions. MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 07 21 00 - CARMEL CITY CENTER Date 03.26.12 THERMAL INSULATION MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 3.7 INSTALLATION OF INSULATION FOR CONCRETE SUBSTRATES A. Install board insulation on concrete substrates by adhesively attached, spindle-type insulation anchors as follows: 1. Fasten insulation anchors to concrete substrates with insulation anchor adhesive according to anchor manufacturer's written instructions. Space anchors according to insulation manufacturer's written instructions for insulation type, thickness, and application indicated. 2. Apply insulation standoffs to each spindle to create cavity width indicated between concrete substrate and insulation. 3. After adhesive has dried, install board insulation by pressing insulation into position over spindles and securing it tightly in place with insulation-retaining washers, taking care not to compress insulation below indicated thickness. 4. Where insulation will not be covered by other building materials, apply capped washers to tips of spindles. 3.8 INSTALLATION OF CURTAIN-WALL INSULATION A. Install board insulation in curtain-wall construction where indicated on Drawings according to curtain-wall manufacturer's written instructions. 1. Hold insulation in place by securing metal clips and straps or integral pockets within window frames, spaced at intervals recommended in writing by insulation manufacturer to hold insulation securely in place without touching spandrel glass. Maintain cavity width of dimension indicated between insulation and glass. 2. Install insulation where it contacts perimeter fire-containment system to prevent insulation from bowing under pressure from perimeter fire-containment system. 3.9 INSTALLATION OF VAPOR RETARDERS A. Place vapor retarders on side of construction indicated on Drawings. Extend vapor retarders to extremities of areas to protect from vapor transmission. Secure vapor retarders in place with adhesives or other anchorage system as indicated. Extend vapor retarders to cover miscellaneous voids in insulated substrates, including those filled with loose-fiber insulation. B. Seal vertical joints in vapor retarders over framing by lapping no fewer than two studs. 1. Before installing vapor retarders, apply urethane sealant to flanges of metal framing including runner tracks, metal studs, and framing around door and window openings. Seal overlapping joints in vapor retarders with vapor-retarder tape according to vapor- retarder manufacturer's written instructions. Seal butt joints with vapor-retarder tape. Locate all joints over framing members or other solid substrates. 2. Firmly attach vapor retarders to metal framing and solid substrates with vapor-retarder fasteners as recommended by vapor-retarder manufacturer. C. Seal joints caused by pipes, conduits, electrical boxes, and similar items penetrating vapor retarders with vapor-retarder tape to create an airtight seal between penetrating objects and vapor retarders. D. Repair tears or punctures in vapor retarders immediately before concealment by other work. Cover with vapor-retarder tape or another layer of vapor retarders. MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 07 21 00 - CARMEL CITY CENTER Date 03.26.12 THERMAL INSULATION MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 3.10 PROTECTION A. Protect installed insulation and vapor retarders from damage due to harmful weather exposures, physical abuse, and other causes. Provide temporary coverings or enclosures where insulation is subject to abuse and cannot be concealed and protected by permanent construction immediately after installation. END OF SECTION 07 21 00