Loading...
HomeMy WebLinkAbout09 65 13.DOCMATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 09 65 13 - CARMEL CITY CENTER Date 03.26.12 RESILIENT BASE AND ACCESSORIES MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 SECTION 09 65 13 - RESILIENT BASE AND ACCESSORIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Resilient base. 2. Vinyl molding accessories. 1.3 ACTION SUBMITTALS A. Product Data: For each type of product. B. Samples: For each exposed product and for each color and texture specified, not less than 12 inches long. C. Samples for Initial Selection: For each type of product indicated. D. Samples for Verification: For each type of product indicated and for each color, texture, and pattern required in manufacturer's standard-size Samples, but not less than 12 inches long. E. Product Schedule: For resilient base and accessory products. F. Refer to Finish Legend on Drawings. 1.4 MAINTENANCE MATERIAL SUBMITTALS A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Furnish not less than 10 linear feet for every 500 linear feet or fraction thereof, of each type, color, pattern, and size of resilient product installed. 1.5 DELIVERY, STORAGE, AND HANDLING A. Store resilient products and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer, but not less than 50 deg F or more than 90 deg F. MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 09 65 13 - CARMEL CITY CENTER Date 03.26.12 RESILIENT BASE AND ACCESSORIES MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 1.6 FIELD CONDITIONS A. Maintain ambient temperatures within range recommended by manufacturer, but not less than 70 deg F or more than 95 deg F, in spaces to receive resilient products during the following time periods: 1. 48 hours before installation. 2. During installation. 3. 48 hours after installation. B. After installation and until Substantial Completion, maintain ambient temperatures within range recommended by manufacturer, but not less than 55 deg F or more than 95 deg F. C. Install resilient products after other finishing operations, including painting, have been completed. PART 2 - PRODUCTS 2.1 PERFORMANCE REQUIREMENTS A. FloorScore Compliance: Resilient base shall comply with requirements of FloorScore certification. 2.2 VINYL BASE A. Manufacturers: Subject to compliance with requirements, provide products by the following: 1. Johnsonite; A Tarkett Company. B. Product Standard: ASTM F 1861, Type TV (vinyl, thermoplastic). 1. Group: I (solid, homogeneous). 2. Style and Location: a. Style B, Cove: Provide in areas indicated on Finish Drawings. C. Minimum Thickness: 0.125 inch. D. Height: 4 inches. E. Lengths: Cut lengths 48 inches long. F. Outside Corners: Job formed. G. Inside Corners: Job formed. H. Colors and Patterns: Refer to Finish Legend on Drawings. 2.3 VINYL BASE A. Manufacturers: Subject to compliance with requirements, provide products by the following: 1. Johnsonite; A Tarkett Company. MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 09 65 13 - CARMEL CITY CENTER Date 03.26.12 RESILIENT BASE AND ACCESSORIES MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 B. Description: Vinyl stair-tread nosing. C. Profile and Dimensions: Refer to Finish Plan Notes on Drawings. D. Locations: Provide vinyl molding accessories in areas indicated. E. Colors and Patterns: As selected by Architect from full range of industry colors. 2.4 INSTALLATION MATERIALS A. Trowelable Leveling and Patching Compounds: Latex-modified, portland cement based or blended hydraulic-cement-based formulation provided or approved by resilient-product manufacturer for applications indicated. B. Adhesives: Water-resistant type recommended by resilient-product manufacturer for resilient products and substrate conditions indicated. 1. Adhesives shall have a VOC content of 50 g/L or less. C. Metal Edge Strips: Extruded aluminum with mill finish of width shown, of height required to protect exposed edges of flooring, and in maximum available lengths to minimize running joints. D. Floor Polish: Provide protective, liquid floor-polish products recommended by resilient stair- tread manufacturer. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work. 1. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of resilient products. B. Proceed with installation only after unsatisfactory conditions have been corrected. 1. Installation of resilient products indicates acceptance of surfaces and conditions. 3.2 PREPARATION A. Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products. B. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound; remove bumps and ridges to produce a uniform and smooth substrate. C. Do not install resilient products until they are the same temperature as the space where they are to be installed. 1. At least 48 hours in advance of installation, move resilient products and installation materials into spaces where they will be installed. MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 09 65 13 - CARMEL CITY CENTER Date 03.26.12 RESILIENT BASE AND ACCESSORIES MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 D. Immediately before installation, sweep and vacuum clean substrates to be covered by resilient products. 3.3 RESILIENT BASE INSTALLATION A. Comply with manufacturer's written instructions for installing resilient base. B. Apply resilient base to walls, columns, pilasters, casework and cabinets in toe spaces, and other permanent fixtures in rooms and areas where base is required. C. Install resilient base in lengths as long as practical without gaps at seams and with tops of adjacent pieces aligned. D. Tightly adhere resilient base to substrate throughout length of each piece, with base in continuous contact with horizontal and vertical substrates. E. Do not stretch resilient base during installation. F. On masonry surfaces or other similar irregular substrates, fill voids along top edge of resilient base with manufacturer's recommended adhesive filler material. G. Job-Formed Corners: 1. Outside Corners: Use straight pieces of maximum lengths possible and form with returns not less than 3 inches in length. a. Form without producing discoloration (whitening) at bends. 2. Inside Corners: Use straight pieces of maximum lengths possible and form with returns not less than 3 inches in length. a. Miter or cope corners to minimize open joints. 3.4 RESILIENT ACCESSORY INSTALLATION A. Comply with manufacturer's written instructions for installing resilient accessories. B. Resilient Molding Accessories: Butt to adjacent materials and tightly adhere to substrates throughout length of each piece. Install reducer strips at edges of floor covering that would otherwise be exposed. 3.5 CLEANING AND PROTECTION A. Comply with manufacturer's written instructions for cleaning and protecting resilient products. B. Perform the following operations immediately after completing resilient-product installation: 1. Remove adhesive and other blemishes from exposed surfaces. 2. Sweep and vacuum horizontal surfaces thoroughly. 3. Damp-mop horizontal surfaces to remove marks and soil. C. Protect resilient products from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period. D. Cover resilient products subject to wear and foot traffic until Substantial Completion. MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 09 65 13 - CARMEL CITY CENTER Date 03.26.12 RESILIENT BASE AND ACCESSORIES MATT THE MILLER’S; CARMEL CITY CENTER; SUITE 101 END OF SECTION 09 65 13