Loading...
HomeMy WebLinkAboutCorrespondence: Engr'gMay 21, 2012 Mr. Jim Shield, P.E. Weihe Engineers 10505 North College Avenue Indianapolis, IN 46280 JAMES BRAINARD, MAYOR EL RE: The Lakes at Towne Road, Section 3 PUD- Project Review #1 Dear Mr. Fleming: The City received your primary plat on April 27, 2012. We offer the following comments: GENERAL INFORMATION 1. These comments represent the Department of Engineering's first review of the primary plat plans for this project. 2. We request that all responses to our comments be provided in writing and be accompanied by a drawing reflecting the requested revisions. Failure to provide written responses may result in the delay of the review process. 3. It is critical that this office be made aware of all modifications made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. 4. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. If you have not already done so, please provide a set of drainage plans and calculations to their office for review. We will share Crossroad's comments as they are received. 5. Final drawings will not be approved for construction until: a. All Engineering Department and Utility Department and Hamilton County Surveyor issues have been resolved. b. All bonds and performance guarantees are posted. c. All Board of Public Works and Safety approvals and any other governing agency approvals (if required) are obtained. d. All off -site easements necessary to install utilities to serve the development are secured. e. SWPPP is approved. f. All fees are paid. 6. The Department reserves the right to provide additional comments based upon subsequent reviews. 7, An approved Storm Water Management Pennit is required prior to commencing any earth disturbing activity. Please contact Mr. John Thomas regarding storm water quality requirements. 8. An approved right -of -way permit is required prior to commencing any work in the public right -of -way and for construction equipment access from the City's right -of -way. 9, If it will be necessary to relocate existing utilities, the costs for suchjelucation shall be borne solely by the developer. Any utility poles requiring relocation shall be relocated to within one -foot of the outside edge of the proposed right -of -way. 10. The Department requires that the construction drawings be developed in accordance with the City of Carmel digital submission standards and that all required submittals for primary plat, secondary plat, and construction drawings be inade. The digital files must be submitted to DEPARTMENT OF ENGINEERING ONE Civic SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAx 317.571.2439 EMAIL engineeriuggcarmel.in.gov Mr. Jim Shields, P.E. May 23, 2012 RE: The Lakes at Towne Road, Section 3 PUD Project Review #1 Page 2 of 5 the Department of Engineering prior to the approval of the construction plans. Please contact the City G1S Department for the requirements. 11. Thoroughfare Plan Compliance: Section 2.09 of Chapter 2, Article 1 of Chapter 10 of the Carmel City Code requires that all projects and Improvements or authorizations under the jurisdiction of the zoning ordinance that adjoin, include, are served by or affect existing streets bearing a designation on the Thoroughfare Plan shall conform to the requirements of the Thoroughfare Plan in regards to (1) the dedication of public Rights -of -way; (2) design and construction of the improvements indicated by the Thoroughfare Plan across the roadway frontage of the project; (3) Setback; and (4) any other affected development standards. Section 2.09 further states that the petitioner may elect to provide a monetary commitment equal to the value to otherwise design and construct the improvements indicated by the Thoroughfare Plan across the roadway frontage. The value of the commitment shall be equal to the difference in the value to otherwise design and construct the improvements indicated by the Thoroughfare Plan across the roadway frontage, minus the cost to design and construct those improvements indicated by the Thoroughfare Plan across the roadway frontage that will be installed by the petitioner. The values established above shall be approved by the department of Engineering. Section 2.09 further states that conformance with the Thoroughfare Plan as outlined above shall be in addition to any improvements deemed necessary by: (1) Chapter 5, Sections 5.03.05 and 5.05.02(3); (2) Statements per Chapter 24, Section 24.02(B)(5)(e); and (3) Other applicable standards. 12. Jurisdictions: a. The project site is located within current City of Carmel Corporate Limits. b. Perimeter Street and Right -of -Way City of Carmel (Towne Road) c. Water City of Carmel Utilities d. Sanitary Sewers City of Carmel Utilities e. Storm Sewers /Drainage City of Carmel. f. Legal Drains Hamilton County Surveyor's Office. 13. Drawings submitted for approval: a. The design engineer must certify all drawings submitted for final approval. b. This office will require 9 sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and signed by the City Engineer and by Carmel Utilities. The Owner will receive 3 sets, one of which must be maintained on the construction site at all times. If this project is subject to review and approval by the Hamilton County Surveyor's Office, a total of 11 sets will be required for final approval. 14. Carmel Utilities will provide separate reviews of this project for water issues. Please assure that copies of all drawings are sent to: Paul Pace Paul Arnone Carmel Utilities Distribution Carmel Utilities Collection 3450 West 131 Street 901 North Range Line Road Westfield, IN 46074 Carmel, IN 46032 15. Carmel Utilities subscribes to "Holey Moley" who should be contacted directly for all water main locations. 16. The following items will be sent electronically upon request regarding this correspondence and project: a. Project Approval Checklist b. Performance /Maintenance Guarantees c. Utility Jurisdictions /Right of Way Permits d. Availability (acreage) Fees BOARD OF PUBLIC WORKS AND SAFETY Mr. Jim Shields, P.E. May 23, 2012 RE: The Lakes at Towne Road, Section 3 PUD Project Review #1 Page 3 of 5 17. A schedule for Board of Public Works and Safety meeting dates and agenda deadlines will be sent electronically for your use upon request. Please use the Engineering Department deadlines for submissions to the Board. 18. Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and /or the Board of Zoning Appeals (if applicable) and completion of review by the Technical Advisory Committee. All written requests to be placed on the Board's agenda must include the appropriate Docket Number and the date (or dates) of approval by the Plan Commission and /or the Board of Zoning Appeals (if applicable). 19. Water Availability and Sanitary Sewer approval from the Board will be required. This is an EDU approval based upon the proposed use of the site. Reference Items #33 to #35 below for additional details /explanations. Please note that if an entryway or other irrigation system is planned for this development, additional Water Availability Approval from the Board will be required and additional Water Connection Fees will be assessed based upon the size and usage of the system as determined by the Director of Carmel Utilities. 20. Temporary Construction Entrance Approval. It appears the planned construction entrance is located at the site of a permanent curb cut planned on Towne Road. Therefore, a separate approval from the Board will not be required. 21. The installation of any permanent, privately owned and/or maintained improvement (signs, decorative street signs, walls, streetlights, etc.) within dedicated right of way or dedicated easements requires the execution of a Consent to Encroach Agreement between the Owner and the City of Carmel. Such agreements are executed by the Board of Public Works and Safety. The City Engineer may approve irrigation system agreements. 22. Secondary Plat approval if applicable. All performance guarantees must be posted prior to submission of secondary plats for Board of Public Works and Safety approval. 23. Dedication of right -of -way if not platted. This is based upon the City of Carmel 20 -Year Thoroughfare Plan requirements. Dedication documents are available upon request. Please be advised that all Right -of -Way Dedications must be accompanied by a Sales Disclosure Agreement completed by the owner for the property being dedicated to the City. The dedication document cannot be recorded without a completed Sales Disclosure. The form is available upon request. 24. Any open pavement cuts of City right -of -way will require Carmel Board of Public Works and Safety approval. BONDING REQUIREMENTS 25. Please contact Mr. Dave Barnes to review performance guarantee requirements. Please contact Mr. John Duffy to review water and sanitary sewer bonding requirements. 26. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities, unit costs, pipe sizes, and materials, etc. 27. Upon completion and release of individual Performance Guarantees, a three -year Maintenance Guarantee will be required (see Street Sign comments above). The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements. 28. Performance Guarantees may be Perfol mance or Subdivision Bonds or irrevocable Letters of Credit. 29. Please reference the available enclosures for more detailed explanation of our procedures. RIGHT OF WAY PERMIT AND BONDING 30. Any work in the dedicated right -of -way will require an approved Right -of -Way Permit and a License Pennit Bond. 3 I The bond amount is determined by our Right -of -Way Manager. However, if the work is included in the scope of work of a required and posted Performance Guarantee, the Mr, Jim Shields. P.E. May 23, 2012 RE: The Lakes at Towne Road, Section 3 PUD Project Review #1 Page 4 of 5 Perfonnance Guarantee may be used to satisfy the bond requirements of the Right -of -Way Pennit. 32. Please contact our Right -of -Way Manager, Fred Glaser, to arrange right -of -way permitting and bonding. AVAILABILITY AND CONNECTION FEES 33. We defer to Cannel Utilities regarding this issue. 34. if an entryway or overall site irrigation system is planned for this development, additional Water Connection Fees will be assessed based upon the size and usage of the system and upon the recommendations of the Director of Carmel Utilities. 35. These fees are required to be paid prior to final approval of construction plans by Engineering and prior to issuance of building permits by Building Codes Services. Please confirm these fees and calculations with Carmel Utilities. CONSTRUCTION DRAWING REVIEW COMMENTS 36. Please include a scale and North arrow. 37. Please include a professional engineer or land surveyor's stamp on the plat. 38. Please provide the requisite storm water /drainage information required by Section 102.05 of the Storm Water Technical Standards Manual, including, but not limited to: a. Provide more detail for the swale cross sections. b. Indicate flood routing. c. Provide minimum flood protection grades for individual lots. d. Provide Crossroad Engineers with the Pre Developed Drainage Report, Post Developed Drainage Report, and a Summary Report per the Storm Water Technical Standards Manual Section 102.05. 39. Please include the spillway elevation for the pond. 40. Rear yard swales shall be contained within a minimum 30 feet width drainage easement, centered on the swale. 41. The maximum length for rear yard swales shall not exceed 300 feet before reaching an inlet. A 330 foot swale is currently shown behind lots 4, 5, and 6. 42. Please number the storm and sanitary sewer structures. 43. Please include the public road name. 44. Please show the existing Towne Road improvements. 45. Please provide a pipe stub to the Towne Road right -of -way for future drainage to the detention pond. 46. Is the pond sized for the full right -of -way width across the Towne Road frontage? 47. Please indicate, in the median, a northbound left turn lane and taper that conforms to City standards. 48. Please label all dimensions of the southbound auxiliary lanes. Auxiliary lanes shall conform to City of Carmel Standard Drawing 10 -32. Auxiliary lanes will need to be completely curbed. Curb inlets will need to be moved within the limits of the auxiliary lanes. Normal crown shall extend into auxiliary lanes. If you have questions, please contact Mme at 571 -2441. Sincerely, Gar D n -n J' P.E. Assistant ity Engineer Department of Engineering Mr. Jim Shields, P.E. May 23, 2012 RE: The Lakes at Towne Road, Section 3 PUD Project Review 41 Page 5 of 5 cc: Angelina Conn, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Cannel Utilities Paul Arnone, Cannel Utilities Greg Hayes, Hamilton County Surveyor's Office Greg liko, Crossroad Engineers, PC issvrapps\user daia\z:Ashared \DHILL\PROJREV i 2\THELAKF.SATTOWNEROAD3REV 141