HomeMy WebLinkAbout209317 05/22/2012 CITY OF CARMEL, INDIANA VENDOR: 354950 Page 1 of 1
ONE CIVIC SQUARE R W ARMSTRONG ASSOCIATES CHECK AMOUNT: $6,863.22
�4 CARMEL, INDIANA 46032 300 S MERIDIAN ST
INDIANAPOLIS IN 46225 CHECK NUMBER: 209317
CHECK DATE: 5/22/2012
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
211 R4462863 25803 92693 6,863.22 ASA #2 96TH /KEYSTONE D
i RW
Mike McBride, P.E. May 10, 2012
City of Carmel Invoice No: 92693
Department of Engineering
One Civic Square
Carmel, IN 46032
Project 20075030 -000 CARMEL 96TH KEYSTONE TEARDROP RAB INTERCHANGE
CONTACT: David Henkel (317) 780 -7227
Contract #0707.04.08 dated July 7, 2004. Professional Services per the Notice to Proceed dated 2/7/08.
Purchase Order No. 183080 Keystone Fund dated February 7, 2008; NTE $174,300.00.
Refer also to Purchase Order No. 19796 96th and Keystone dated January 13, 2009; NTE $167,700.38.
Refer also to Additional Services #5A Supplemental to Purchase Order No.19796; NTE $679,999.62
Additional Services #5B Supplemental to Purchase Order No. 19796 dated October 21, 2009; NTE $969,665. k?
Supplemental to Purchase Order No. 27466 dated January 24, 2011; NTE $46,980. nits
Supplemental to Purchase Order No. 25803 dated July 6, 2011; NTE $1,129,510. F.
Total contract amount now $3,483,580.00
Professional Services March 31, 2012 Through April 27, 2012
Percent Previous Current
Billing Phases Fee Complete Fee Billed Fee Billing
Phase 10 Traffic Study 107,000.00 100% 107,000.00 0.00
Phase 20 30% Traffic Simulation 13,600.00 100% 13,600.00 0.00
Phase 30 30% Visualization 44,000.00 100% 44,000.00 0.00
Phase 40 30% Survey Field Work 60,000.00 100% 60,000.00 0.00
Phase 50 30% Survey Compilaton 95,200.00 100% 95,200.00 0.00
Phase 60 SUE Work 30,000.00 97% 29,100.00 0.00
Phase 70 30% Hydraulics 66,400.00 100% 66,400.00 0.00
Phase 71 30% Hydraulics Environmental 16,300.00 100% 16,300.00 0.00
Phase 80 Phase 1 Environmental Assessment 12,600.00 100% 12,600.00 0.00
Phase 81 NEPA Documentation 90,400.00 100% 90,400.00 0.00
Phase 90 30% Road Design Indy 491,000.00 100% 491,000.00 0.00
Phase 91 TIGER Renderings 36,400.00 100% 36,400.00 0.00
Phase 92 TIGER Presentation /Simulation 43,300.00 100% 43,300.00 0.00
Phase 100 30% Bridge Design 56,300.00 100% 58,300.00 0.00
Phase 110 30% MOT 48,100.00 100% 48,100.00 0.00
Phase 120 Preliminary ROW 39,400.00 100% 39,400.00 0.00
Phase 130 Geotech 40,000.00 100% 40,000.00 0.00
Phase 140 Roundabout QA/QC 9,700.00 0% 0.00 0.00
Phase 150 Project Mgmt/Coordination Efforts 171,100.00 60% 100,450.00 3,036.00
Phase 160 Additional Topographic Survey 51,600.00 100% 51,800.00 0.00
Phase 170 Interchange Justification Concept Approval 56,100.00 25% 14,025.00 0.00
Phase 180 Final Hydraulics Analysis 243,700.00 85% 207,145.00 0.00
Phase 190 Roadway Design 100% 1,026,400.00 75% 770,896.80 3,827.22
Phase 200 Structural Design 100% 267,500.00 57% 152,750.00 0.00
Phase 210 MOT Design 100% 53,500.00 25% 13,107.50 0.00
Phase 220 Final ROW Engineering 110,900.00 100% 110,900.00 0.00
Phase 230 Environmental Document Modification 153,900.00 25% 38,475.00 0.00
Phase 240 Animation Revisions 8,800.00 100% 8,800.00 0.00
Phase 900 Extra Work(Haver /Threel) 38,160.00 79% 30,028.00 0.00
Total Fee 3,483,580.00 2,789,477.30 6,863.22
Total Project Billing Limits Current Billing Prior Billing Billed To Date
Total Billings 6,863.22 2,789,477.30 2,796,340.52
Billing Limit 3,483,580.00
Remaining 687,239.48
Total Due This Invoice $6,863.22
Union Station 300 S. Meridian St. Indianapolis, IN 46225
PH 317.786.0461 TF 800.321.6959 FX 317.788.0957
rwArmstrong.com
Form Prescribed by State of Accounts City Form No. 201 Revised 1964
A claim, to be properly itemized must show; Kind of Service, where performed, dates service rendered, by whom, rate per
day, number of hours, rate per hour, price per foot, per yard, per hundred, per pound, per ton, etc.
City Of CARMEL
To R. W. ARMSTRONG ASSOCIATES, INC.
ON ACCOUNT OF APPROPRIATION FOR
CARMEL 96TH KEYSTONE TEARDROP Address UNION STATION, 300 S. MERIDIAN, INDPLS, IN 46225
ORDER ITEMIZED CLAIM DOLLARS Cts.
2012 No.
4/27/12 Professional services rendered per the agreement between the
City of Carmel and R. W. Armstrong Associates, Inc.
CARMEL 96TH KEYSTONE TEARDROP RAB INTERCHANGE
p er the attached invoice 6 863 22
Project 20075030 -000
Pursuant to the provisions and penalties of Chapter 155, Acts of 1953,
I hereby certify that the foregoing account is just and correct, that the amount claimed is legally due, after allowing all just
credits, and that no part of the same has been paid.
Date May 10, 2012 ✓r�
Title
CLAIM NO. WARRANT NO. I have examined the within claim and hereby
certify as follows;
IN FAVOR OF
That it is in proper form.
That it is duly authenticated as required by law
contract
That It is based upon statutory authority
That it is apparently correct
incorrect
ON ACCOUNT OF APPROPRIATION Clerk- Treasurer
FOR I I F, m
N
<D 3 d <TC
a
ALLOWED 19
IN SHE SUM OF m m'
D a
d �Q
o a 0.
0
3 m.am
CD a
o:
n N Q C
COST DISTRIBUTION LEDGER CLASSIFICATION 9
IF CLAIM PAID FROM MOTOR VEHICLE g
ID
o
HIGHWAY FUND N
ACCT. ACCOUNT TITLE AMOUNT N
NO. o m
m 0.
a 3
C
m
vw
C N
7
m (D
!D
N
s N
q
a.
a
o
R wARMSTR®ni&
Inspiration to reality.
CONTACT: Mike McBride, PE, City Engineer DATE: May 7, 2012
CLIENT: City o f Ca rm e l PROJECT NO.: 20075030
PROJECT: 9 6th St at Keysto Parkway Interchange
BY: David A. Henkel, PE, PTOE PAGES: 1 Of 3
PROGRESS THIS REPORT (Thru April 27, 2012):
Project Coordination
Continued with INDOT 465 project coordination to develop project tie -in plans.
Continued "on hold" status of remainder of project pending INDOT /City of Carmel decision on
design scope agreement.
Developed month's project invoice.
Continued coordination with utility and right -of -way subconsultant (United). NOTE: utility
relocation plans are currently on hold pending determination of final project configuration.
Continued coordination with appraising /buying consultant (Crossroads).
Continued coordination with INDOT on EA approval (FONSI obtained).
Revised project schedule and continued coordination with INDOT and City of Carmel on
schedule /design agreement issues.
Appraisals will not be conducted until the appropriate stage in the federally funded local project
process.
Topographic Survey
Previous item: Enterprise Drive topo survey complete and incorporated into plans. Cost
$17,700. Previously, it was indicated that the City of Carmel may be invoiced for
this amount at end of project, dependent upon project costs. Recent re -work
required on the project has necessitated the need to include this cost in a
supplemental design fee amendment. The amendment will be developed pending
final project scope based on value engineering recommendations.
Previous item: Additional topo survey obtained at north end of project to facilitate tie -in at 98th
St. Per Gary Duncan of City of Carmel, striping plan at 98th was not constructed per plans.
Therefore, survey was required to verify tie -in. Cost $3,20o. This will be included in the
supplemental design fee amendment.
Design
Previous item: Completed right -of -way line revisions for interim plan set, including the design
of the tie -in to I -465 /Keystone interchange project. The work to tie in to the I -465
interchange project is out -of- scope, and will be tracked separately. Previously, it
was indicated that the City of Carmel may be invoiced for this amount at the end of
the project, dependent upon project costs. Recent re -work required on the project
has necessitated the need to include this cost in a supplemental design fee
amendment. The amendment will be developed pending final project scope based
on value engineering recommendations.
Continued investigation of potential footprint reduction and modification impacts.
Continued coordination of tie -in work at 465 /Keystone interchange. Discussed slope and
retaining wall issues on west side of interchange with INDOT.
Geotechnical
Geotechnical report is complete and has been delivered to City of Carmel. No revisions required.
Pavement design has been completed. Will review status to determine if any additional
modifications or geotechnical information are required once final scope has been determined.
Utility Coordination
Utility coordination is on hold. Once the final configuration of the interchange is confirmed,
coordination will continue in accordance with INDOT LPA process.
Requests for relocation plans have been sent, and responses are being received.
PATransportation\20075030 Keystone Parkway \00 Administration \10 Operations \08 Invoices \final design status report #10 2012 -May 7.doc
Union Station 300 S. Meridian St. Indianapolis, IN 46225
PH 317.786.0461 TF 800.321.6959 Fx 317.788.0957
rwArmstrong.com
r
PROJECT STATUS
96th St at Keystone Parkway
Alt, R
wARMSTRONG. May 7, 2012
Inspiration to reality. Page 2
Revised plans will be sent out for the final confirmed configuration.
IPL has requested reimbursement for "extraordinary circumstances although they have no
easements within the project right -of -way.
No relocation plans will be approved until final project design scope has been agreed to by all
agencies.
Subconsultant (United Consulting) is requesting $7,500 for additional utility
coordination efforts for interim project. This cost will be included in the
supplemental design fee amendment.
Environmental Permitting
EA FONSI approved.
Continued coordination with INDOT and FHWA on distribution of EA copies and notice of
availability.
Stormwater permits and best management practices for Carmel and Indianapolis are being
developed. Will not be submitted until final interchange configuration determined.
Right -of -way
Previous item: Right -of -way engineering revisions are required to 25 parcels in order to
accommodate revised full build -out configuration. Additional revisions were required on 20
parcels to accommodate revised interim project alignments. Plat revisions for 3 parcels were
also required. Subconsultant (United Consulting) is requesting additional fee to
cover the re -work. This has been discussed between the City and the
subconsultant. Per agreement between the City and the Subconsultant, the
additional revisions will be tracked and invoiced at the completion of the right -of-
way revisions.
Previous item: 6 additional parcel revisions are required due to the addition of
Threel Rd back into the project. Total cost for 25 parcels to be revised for full
build -out and the additional 20 parcel and 3 plat revisions for interim project, plus
the 6 parcels for Threel Rd 75,600.
Parcel packet revisions resulting from the changes to the interim configuration will be required
based on the requested alignment changes. Packet revisions will be included in the additional
right -of -way engineering fee invoice.
Property owner contact will start upon FMIS approval, which will in turn be dictated by EA
approval and determination of final interchange configuration.
ANTICIPATED WORK DURING NEXT MONTH:
Project Coordination:
To be determined based on status of INDOT /Carmel agreement and interchange configuration.
Determine if Indy Interlocal Agreement is needed for land acquisition. Develop agreement if
required.
Compile required information for additional public hearing should additional hearing be
required.
Design
o To be determined based on agreement.
Right -of -way
o To be determined based on agreement.
Utilities
o Continue with Utility coordination process once interchange configuration is established
(relocation plans)
SCHEDULE:
Unknown pending outcome of INDOT /Carmel agreement. Current plan is to have Keystone bridge open
to traffic by end of 2014.
STATUS OF PERMITS:
All ESA evaluations complete.
Union Station 300 S. Meridian St. Indianapolis, IN 46225
PH 317.786.0461 TF 800.321.6959 Fx 317.788.0957
rwArmstrong.com
I I
PROJECTSTATUS
96th St at Keystone Parkway
`ARMS
TRONG- May 7, 2012
Inspiration to reality. Page 3
Rule 5 permit pending.
Stormwater permits, BMP permits under development.
SCOPE OR BUDGET CHANGES (CUMULATIVE):
Add'l topo survey for Enterprise Drive ($17,70o, to be requested in supplemental design fee agreement)
Add'l topo survey for north end of project tie -in ($3,200 to be requested in supplemental design fee
agreement)
ROW engineering revisions to accommodate changes to full build -out footprint and interim footprint
($75,600 requested by United Consulting) may be more depending on INDOT value engineering
recommendations.
Utility coordination supplemental to account for additional round of utility coordination for "interim"
plan set ($7,5oo requested by United Consulting).
Design fee supplemental based on INDOT mtg September 15, 2011 requiring RW Armstrong team to
design the I -465 /Keystone interchange tie -in (amount TBD).
Additional design fees as dictated by the future scope of the project.
INFORMATION NEEDED FROM CLIENT OTHERS:
Construction /ROW Funding amount and sources.
Interlocal agreement with Indy for land acquisition determination if document is needed.
Determination of final scope and schedule of project based on City of Carmel and INDOT value
engineering recommendations /responses.
Determination of final project ownership (City of Carmel or INDOT?)
Determination of scope and schedule pending terms of Carmel INDOT agreement
Determination of need for additional public hearing from INDOT /FHWA
Union Station 300 S. Meridian St. Indianapolis, IN 46225
PH 317.786.0461 TF 800.321.6959 Fx 317.788.0957
rwArmstrong.com
Prescribed by State Board of Accounts City Form No. 201 (Rev. 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom,
rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
RW Armstrong Purchase Order No.
300 S. Meridian St. Terms
Indianapolis, IN 46225 Date Due
Invoice Invoice Description
Date Number (or note attached invoice(s) or bill(s) Amount
5/10/2012 92693 96th and Keystone RAB design 6,863.22
All
4
t
Total 6,863.22
1 hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance
with IC 5- 11- 10 -1.6.
20
Clerk- Treasurer
VOUCHER NO WARRANT NO.
RW Armstrong ALLOWED 20
300 S. Meridian St. IN SUM OF
Indianapolis, IN 46225
6,863.22
ON ACCOUNT OF APPROPRIATION FOR
Board Members
PO# or INVOICE NO ACCT /TITLE AMOUNT
DEPT# I hereby certify that the attached invoice(s), or
25803 92693 211- R44628 6863.22 bill(s) is (are) true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
zakz< 5/21/2012
Signature
City Engineer
Cost Distribution ledger classification if Title
claim paid motor vehicle highway fund