Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Correspondence: Project Review #3
May 25, 2012 Mr. Kurt Prosser, P.E. GPD Group 1801 Watermark Drive, Suite 150 Columbus, OH 43215 RE: Fifth Third Bank- Project Review #3 Dear Mr. Prosser: The City received your comment letter and drawings dated May 4, 2012 in response to the Engineering Department's review on December 27, 2012. The comments from the City's previous review have been satisfactorily addressed with the following exceptions: 1. Previous Comment 12. Please provide a basic traffic summary that compares AM and PM peak traffic entering and exiting the site for the current use and proposed use. It did not appear that a traffic study was included with this submittal. 2. Previous Comment 18. Please revise the landscaping plan so that there is no planting material within the proposed access easement along the south property line. The Department repeats this comment. 3. Previous Comment 19. Please add the City's curbing policy. This was not included in the plans. If you have questions, please contact ine at 571 -2441. ary R. D ca 'r. E. Assistant ity Engineer Department of Engineering JAMES BRAINARD, MAYOR cc: Angelina Conn, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Cannel Utilities Paul Arnone, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers, PC issvrapps \user datalrlshared \DHILLIPROJREVI 1\FII THTHIRDI3ANKREV #2 EL DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAx 317.571.2439 EMAIL engineering ©carme4.in.gov