Loading...
HomeMy WebLinkAboutSalsbery Brothers/CO1/Street/increase 6171.63/RAB Irrigation CITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.: 1 DATE: Sl v‘( PROJECT NAME: CzPrO, "r�‘ \o on. CITY REQ. NO.: CITY PO NO.: 2Sg3cp CITY PO DATE: I. You are directed to make the following changes in this Contract: (Brief Description) ITEM AMOUNT OR DAYS eg0i�, /1 41 DZIA II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Y Contract Price prior to this Change Order 3 ,),O5 .7 7 Contract Price will be increased /decreased by this Change Order j 7 j /0 3 New Contract Price including this Change Order Li I i 37 7` 3$ Contract Time Prior to this Change Order Days Completion Date Net increased /decreased resulting from this Change Order Days Current Contract Time including this Change Order Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Ap. oved: I Reg m nded D s Accepted: S O.c (L 1 Q- SA lshp.r r i rs .lt Alf Project ana er CONTRACTOR a► es B ard, or) 1(0 Mti S U y317 -e, ivt� s% .4 Address Address Mar n B,, e, Member o �a /Y V �,ur►i 1t-1 X633 r! City /State /Zip City /State /Zip Lori W: son, Member By: S I By: A ST: a C -6i oryy IA )L►'sTle v (p =MN (pr' t rib e) (signature) (sign :Ore) Phone: V\ (0�0 Phone: 3i7- Sj�3 -i3 J, X4_ dIsi 1' oiana Cordr. Clerk- Treasurer Date: 2-13 2 Date: Date: 40- /,1_. 777„,,,-,,,,,,i Michael T. McBride City Engine r Date: 5 5 00/2 Page: of Proposal No: 0052625 Proposal Date: 3/23/2012 Salsbery Brothers Landscaping, Inc. Salesperson: CORY WHISTLER 4317 East 146th Street Customer No: 02- CITYCAR Carmel, IN 46033 317.843.0100 Work Location: CITY OF CARMEL CITY OF CARMEL ONE CIVIC SQUARE ONE CIVIC SQUARE CARMEL, IN 46032 CARMEL, IN 46032 Phone: 571 -2417 Cell: Email: Description Quantity Price Amount CHANGE ORDER ESTIMATE FOR CHANGING 3 CONTROLLERS TO THE NEW TUCOR 100 ZONE CONTROLLER AT 3 RAB (HAZEL DELL AND CHERRY TREE, GUILFORD ROAD AND OLD MERIDIAN, 141ST STREET AND TOWNE ROAD) STAT LX MOD CONTROLLER 3.00 224.99- 674.97 TUCOR 100 CONTROLLER 3.00 1,224.99 3,674.97 Net Order: 3,000.00 Less Discount: 0.00 Sales Tax: 0.00 Taxable Amount: 3,000.00 Labor: 0.00 3,000.00 Page: 1 gI tt t kA Proposal No: 0052621 Proposal Date: 3/23/2012 Salsbery Brothers Landscaping, Inc. Salesperson: CORY WHISTLER 4317 East 146th Street Customer No: 02- CITYCAR Carmel, IN 46033 317.843.0100 Work Location: CITY OF CARMEL CITY OF CARMEL ONE CIVIC SQUARE ONE CIVIC SQUARE CARMEL, IN 46032 CARMEL, IN 46032 Phone: 571 -2417 Cell: Email: Description Quantity Price Amount CHANGE ORDER FOR CHANGING THE PVB AT 141ST AND TOWNE ROAD RO A REDUCED PRESSURE PVB PER PARKS 1" STD. PVB 1.00 110.66- 110.66- 1" RED. PRESSURE PVB 1.00 441.29 441.29 Net Order: 330.63 Less Discount: 0.00 Sales Tax: 0.00 Taxable Amount: 330.63 Labor: 0.00 330.63 StALA., A L A s I.. /`I 141l P/rV t:: 1 N Towne Road and 141st Street Change Order Category Total Deduct Meter Pit Installed in RAB (2,500.00) Add Meter Pit Installed outside of RAB 5,340.00 Total 2,840.00 Please note that the above price does not include flowable fill or hauling of the spoils. Salsbery Brothers is not responsible for any utilities not located by IUPPS or utilities that may conflict with bores under hard surfaces.