HomeMy WebLinkAboutGeorge Harvey Construction/CO9/ENG/increase 836.48/Cool Creek Trail Contract No: R -29657 Change Order No.: 009 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -29657 Letting Date:02/09/2011 District:GREENFIELD DISTRICT AE:Goldner, Rob PE /S:Surber, Rob Status:Draft Change Order Information Change Order No.: 009 EWA: Y or Force Acct: N Date Generated: 00 /00 /0000 Date Approved: 00 /00 /0000 Reason Code: CHANGED COND, Construction Related ofr,t A Description: Seeding around inlet at Station 70 +00 A Original Contract Amount 583,765.77 Current Change Order Amount 836.48 Percent: 0.143 Total Previous Approved Changes 31,875.21 Percent: 5.460 Total Change To -Date 32,711.69 Percent: 5.603 Modified Contract Amount 616,477.46 Time Extension Information Date Initiated 00 /00 /0000 Date Completed 00 /00 /0000 Original Contract Time SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0 SP Date 00 /00 /0000 or SP Days (SS Standard Specification, SP Special Provision) Time Element Description: Current Time Extension SS Days 0 SP Days 0 SP Days Value 0.00 Previous Time Approved SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value Revised Contract Time SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0 SS Date 00 /00 /0000 or SP Days 0 Contract No:R -29657 Change Order No.: 009 INDIANA Department of Transportation Page: 2 Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority AE: DCE: SCE: DDCM: per Change Order) LE$ 250K-)(- LE$750K- LE$2M-- GT$2M (Days per Contract) (50 SS days 100 SS days) 200 SS Days) (GT 200 SS days) Verbal Approval Required? Y N If Y, by Date Issued Total Change To- Date >5 Y N If Y Copy to Program Budget Manager Scope /Design Recommendation Y N If Y, Referred to Project Manager(PM) Required? Date to PM Date Returned Approval Authority Concurs with PM? Y N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y N If Y, Date to LPA Date Returned FHWA Signatures Required? Y N If Y, Date to FHWA Date Returned Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract No:R -29657 INDIANA Date:04/24/2012 Change Order No:009 Department of Transportation Page: 3 Contract: R -29657 Project: 0600390 State:0600390 Change Order Nbr: 009 Change Order Description: Seeding around inlet at Station 70 +00 Reason Code: CHANGED COND, Construction Related CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change 0094 0600390 0094 105 -06807 LS 836.480 1.000 C Amount:$ 836.48 Item Description: ADDITIONAL Supplemental Descriptionl: Seeding around inlet at station 70 +00. Mulch from landscape Supplemental Description2: area washing into inlet. Total Value for Change Order 009 836.48 Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation Inlet at station 70 +00 is located in the middle of a landscape area covered with mulch. There has been an issue with the mulch washing into the inlet. Carmel has requested that an area 6' X 6' be replaced with seeding. This would minimize mulch washing into the inlet. Change Order Explanation for Specific Line Item It is the intent of the parties that this change order is full and complete compensation for the work describe above. Notification and consent to this change order is hereby acknowledged. Contractor: Signed By: Date: NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. Contract No:R -29657 INDIANA Date:04/24/2012 Change Order No:009 Department of Transportation Page: 4 APPROVED FOR LOCAL PUBLIC AGENCY v~�' v ��C�� 5/7/ (SIGNATURE) (TITLE) (D�T (SIGNATURE) (TITLE) (DATE) SUBMITTED FOR CONSIDERATION PE/S APPROVED FOR NDIANA DEPARTMENT OF TRANSPORATION Approval Level Name of Approver Oate Status 11 7 1--kb-415, L x�m wu���o �l"rx��v2�r~ 6� -a____ M~t S George R. Harvey Son, Inc. R .1. IR 1, ,i S O N 964 N. State Road 39 O Danville, IN 46122 1 u t Office 317.745.5169 r t (L: L Fax 317.745 2733 Thursday, March 29, 2012 Rob Surber Butler, Fairman and Seufert, Inc. 8450 Westfield Road Suite 300 Indianapolis, IN 46240 RE: INDOT Contract No. R- 29657 -A; Seeding Inlet Rob, Per item #4 of the Pre -final punch list, instead of sodding the area around the inlet at approximate station 70 +00 it has been recommended that seeding take place. The cost of this change order will be $836.48. Please review attached quote from subcontractor. Thank you. Cordially, i e 7., je Z., Richard A. Harvey VP AN EQUAL OPPORTUNITY EMPLOYER 5 EARTH IMAGES, INC. CHANGE ORDER PRICE QUOTATION Central Indiana Area Quote No. 423302 Contact: David Slusser Date 3!28!2012 Ph: (812- 923 -8386 Revised Date Fx: (812-923-7505 Printed 3/28/2012 14:27 Cell: (502) 523 -8481 Page 1 of 1 Email: davids @earthimagesinc.com Customer George R. Harvey Son, Inc. 964 North State Road 39 Job Name R- 29657 -A, COOL CREEK TRAIL Danville IN 46122 Phone (317) 745-5169 Fax (317) 745 -2733 Location HAMILTON COUNTY, INDIANA We have been requested to provide pricing to complete the work noted below. Should the Contractor approve and authorize implementation of the work described below it is understood and agreed that any change order forthcoming the Contractor will be in the general context of this subcontractor change order request. Unless spelled out in this request, no other work is included or should be expected. The special conditions below are an integral part of this request. The price provided is a FIXED UNIT PRICE. Force Account (FA) Time and Material (TM). or Cost Plus (CP) work will not apply. Once agreed upond, no additional documentation will be provided to support this pricing. LINE BID ITEM DESCRIPTION ITEM QTY UNIT UNIT PRICE AMOUNT 621 -01004 MOBILIZATION AND DEMOB. FOR SEEDING 1.00 EACH 750.00 E 750.00 41 621 -02770 EROSION CONTROL BLANKET 6.00 SYS 1.04 6.24 43 621 -06560 MULCHED SEEDING, U 6.00 SYS 0.70 S 4.20 SPECIAL CONDITIONS 1 Quantities are estimated. Invoicing shall be based on actual installed gtantities at the unit price shown. 2 Existing contract ndations apply to this work. 3 Above prices are valid for thirty (30) days from date of this request or revised date and are subject to change after that time. Contractor: George R. Harvey Son, Inc. Signature: Date: Title: 7 t. ,44 x I.l 8 34,98