Loading...
HomeMy WebLinkAboutPacket 6-27-12idGROUP Planning Letter of Intent Job 142 -151 Proj.: Einstein Bros. Bagels #2280 2350 E. 116 ST., CARMEL, IN Docket 12060001 Date: June 13, 2012 City of Blue Springs Community Development Dept. 903 Main Street Blue Springs, MO 64015 To Whom It May Concern: It is the desire of Einstein Bros Bagels to convert an existing building located at 2350 E. 116 St. (formerly Hardee's) into an Einstein Bros. Bagels restaurant. The extent of the site work is as follows: 1) Add railing along west facade curb for outdoor seating. 2) Pave portion of west landscape for outdoor seating. 3) Update parking along south facade to provide accessible parking stalls. 4) Addition of accessible curb ramp for said parking. 5) Addition of six (6) bicycle parking racks at end of parking along South facade. 6) Provide seating, tables and umbrellas for outdoor seating. 7) Addition of RTU screens. 8) Provide updated drive thru- equipment including: a. height detector b. pre -menu board c. directional signage (exempt) d. order confirmation board e. drive -thru canopy f. menu board n rely, Phillip Miller Project Coordinator The idGroup ADLS /ADLS AMENDMENT APPLICATION (ARCHITECTURAL DESIGN, LIGHTING /LANDSCAPING, and SIGNAGE) ADLS Fee: $928 (plus $123 /acre when not accompanied by a Development Plan App.) ADLS AMEND Fees: Sign only: $306, plus $61 /sign; Building/Site: $617.50, plus $61 /acre (Note: fees are due after the application receives a docket number, and not before.) Date: 6/6/12 Docket No. ADLS X ADLS Amend DP Attached Previous DP? Yes X No Name of Project: EINSTEIN BROS BAGELS #2280 Type of Project: EXTERIOR FACELIFT OF BUILDING ADD PATIO Project Address: 2350 E. 116th Street, Carmel, IN 46032 P r o j e c t Parcel ID 1 6 1 0 3 1- 0 0 0 0 0 1 3. 0 0 0 Legal Description: (please use separate sheet and attach) ACREAGE 9.25 SECTION 31, TOWNSHIP 18, RANGE 4 Name of Applicant: The idGROUP Applicant Address: 2641 IRVING BLVD, DALLAS, TX 75207 Contact Person: RENE ORTEGA Phone: 214.638.6800 Fax No. 214.689.0301 Email: lortega@idgroupdallas.com Name of Landowner: MERCHANTS 450 LLC Phone: Landowner Address: P. O. BOX 4900 DEPT 365 S COTTSDALE AZ 85261 Plot Size: 2.86 Acres Zoning Classification: B -8 BUSINESS Present Use of Property RESTAURANT Proposed Use of Property: RESTAURANT New Construction? Yes No X New/Revised Sign? Yes X No Remodeled Construction Yes X No Revised: 12/28/201I filename. ADLS ADLS AMEND New Parking? Yes No X 1 New Landscaping? Yes No X PARKING No. of Spaces Provided: 48 No. Spaces Required: 38 Water by: EXIST. Sewer by: EXIST. LIGHTING Type of Fixture: EXIST Height of Fixture: EXIST DESIGN INFORMATION EXT REMODEL NO CHANGE IN BUILDING AREA OR PARKING Type of Building: V -B (EXIST No. of Buildings: 1 Square Footage: 3,017 Height: 17' -6" No. of Stories 1 Exterior Materials: BRICK EI FS Exterior Colors: REF ELEV Maximum No. of Tenants: 1 Type of Land Uses: COMMERCIAL No. of Fixtures: EXIST Additional Lighting: 0 Plans to be submitted showing Foot candle spreads at property lines, per the ordinance. LANDSCAPING Engineered Landscape Plans to be attached/submitted showing plant types, sizes, and locations SIGNAGE No. of Signs: 2 Location(s): REF. SITE PLAN ELEVATIONS Dimensions of each sign: REF CUTSHEETS Square Footage of each sign: REF CUTSHEETS Total Height of each sign: REF CUTSHEETS Revised: 12/28/2011 &mew ADLS ADLS AMEND Type of Signs: WALL MONUMENT 2 EASY400 SERIES RAILING INSTALLATION INSTRUCTIONS SAFETY FIRST: Wear protective goggles when using power tools. Use a safety harness if your work site is at an elevated location and a fall may cause an injury. It is the installer's responsibility to make sure railings are assembled and installed according to these instructions. Tape Measure Tools you will need: Power Drill Drill Bit 11/64" #2 Square or Phillips Bit Compound Miter Saw Speed Square 1. Examine all parts for any damage in transit. Keep the protective film for as long as practical during the assembly. READ all the instructions before starting. 2, Examine Fig. 1 below noting the location of parts and dimensions. 42 "H L ~2 3116 in 37/8 in 1 378in 33/ in BOTTOM OF THE HANDRAIL RAIL SUPPORT BRACKETS —1'- '`•1 1/4 in BALUSTER MOUNTING BARS —POSTS 36 "H 31/4 in Determine and mark locations of posts, which should be 39 5/8" apart (on center) for whole (uncut) sections. Make adjustments for shorter sections. Check the length of all posts. 42 "H: The total length of a Deck post should be 40 W; length of a Fascia post should be 50 1/4". 36 "H: The total length of a Deck post should be 34 1 length of a Fascia post should be 44 1/4". Trim posts if needed. 3. Mark and drill pilot holes for Baluster Mounting Bars ATTENTION! Post location (line, corner, end) determines which sides need to be drilled. Using one of the Bars as a template mark and drill holes. 42 "H: mark and drill 5 holes. The top of the bar should be at 2 3/16" from the top of the post. 36 "H: mark and drill 4 holes. The top of the bar should be at 1 from the top of the post. 4. Attach Handrail Support Brackets. Measure 3/8" from the top of a post and 3/4" from either side. Drill 2 holes and attach the Brackets using two provided #10 x screws. The long side of the Installation Instructions, Easy400, v0907 Page 1 of 3 bracket should be flush with the top of the post. 5. Assemble Sections. Drive provided #8x1" screws through pre drilled holes in the Baluster Mounting Bars into screw chases in the Balusters. Slightly drill out the pre drilled holes if necessary. Tip: For easier assembly put a Bar on two supports, secure temporarily with clamps or screws. Insert all screws in the holes; drive screws in the channels. Do not over tighten. 6. Post Installation Notes ATTENTION! Posts must be attached to framing members. For proper safe installation you must add sufficient blocking, backing plate, or other reinforcements as needed to reliably support posts. Deck mount posts: the surface under post flanges must be flat. If necessary holes in the flange can be drilled out for 1/4" fasteners. To avoid material stress all fasteners must be attached perpendicular to the flange. Never try to "adjust" posts by attempting to bend after attaching posts to the deck. Fascia posts: make sure posts are at the same height above the deck: measure and mark 10" from the bottom of the post (this is your deck level). Insert plastic plugs into the bottom ends of the posts. Drill small drainage holes in the plugs centers. Make sure all posts are plumb. ACQ Lumber: Check with your lumber supplier to determine if your newer deck is built with ACQ lumber. Its copper based preservative has a corrosive effect on aluminum, and a physical barrier (thick poly film, etc.) is required for post surfaces in direct contact with your deck. Attach posts to the deck using stainless steel hardware that is appropriate for the site conditions (examples: stainless steel lag screws, hex bolts, etc., not included). 7. Starting at the center of a side of the deck install two posts; attach an assembled Baluster Section to the two posts. Tighten all connections. Continue towards the ends. g. Cut Rails. Start with longer rails. Plans splice locations over posts. Leave appropriate extra lengths for angle cuts. For best results use a miter saw with a thin kerf carbide blade. Drill weep holes on the bottom side of the handrails near centers of the sections. 9. Install Rails: you will need 1 or 2 helpers for this operation: Splice Connections. For longer spans assemble rails using Splice Connectors. Insert a Splice Connector 4" into one of the handrail pieces. Drill a pilot hole thought the bottom of the handrail and the Connector, about 3" from the edge, or determine the Handrail Support Brackets holes locations (see Step 4 above). Drive a #10x 3/4" screw through both parts. Slide the other piece of the handrail onto the connector and fasten in the same fashion. Corner Connections: Draw a center line on the bottom of the rails to be connected at a corner. See Fig 2 for drilling locations. Mark and drill pilot holes in both rails. Insert and attach Corner Connectors to the longer rails using two #8x1" screws per side. Fig. 2 10. Starting at shorter sides place assembled rails on top of the posts. Temporarily secure the rails in Installation Instructions, Easy400, v0907 CN250 FASTENER CHASE LOCATIONS Page 2 of 3 place with masking tape, leaving some slack so you are able to lift the corner side of that rail about 1/2" 11. Working with the helpers place longer assembled rails on top of the posts; slide attached Corner Connectors into the shorter rails. Make sure all rails rest on the posts. Secure rails at the corners by driving #8 screws through predrilled holes into the chases of the Corner Connectors (Fig 2) 12. Drill pilot holes through predrilled holes of the Handrail Support Brackets. Fasten the handrails with #10 screws. Seal splice and corner connections with matching high quality silicone caulking. 13. Remove the remaining protective wrap, check and tighten all connections. You are done! Installation Instructions, Easy400, v0907 Page 3 of 3