Loading...
HomeMy WebLinkAboutShelter BuildingCarmel Clay Schools Memorandum To; Jon Dobosiewicz Planning Administrator From; Ron Farrand Date: 2/28/2005 Re.' Shelter Building Outdoor Lab Creekside Middle School/College Wood Elementary School/New Elementary No. 11 Per my recent email, the school corporation is seeking approval to construct a shelter building as part of an outdoor lab at the campus of the above referenced schools. We are requesting this approval as part of the Board of Zoning Appeals approvals for the New Elementary No. 11. The proposed structure will be 24 ft. by 24 ft. wood construction. It will be placed near the existing pond in the southeast portion of the site. A site plan indicating the location will be presented as part of the BZA hearing on February 28, 2005 for the New Elementary No. 11 project. Below is a picture of what the shelter structure will look like. The picture is of a three bay building; the proposed building will only be two bays. Thank you for your assistance with this project. Facilities & Transportation 5185 E. 131 ST Street, Carmel, Indiana (317) 815-3962