HomeMy WebLinkAboutGeorge Harvey Construction/CO3/ENG/Cool Creek Trails/inc 5,586 Contract No:R -29657 Change Order No.: 003
INDIANA Department of Transportation Page: 1
Construction Change Order and Time Extension Summary
Contract Information Contract No.: R -29657 Letting Date:02/09/2011
District:GREENFIELD DISTRICT AE:Goldner, Rob PE/S:Surber, Rob Status:Draft
Change Order Information Change Order No.: 003 EWA: Y or Force Acct: N
Date Generated: 00 /00 /0000 Date Approved: 00 /00 /0000
4��
Reason Code: CHANGED COND, Construction Related 4 t''
Description: Maintenance of Traffic Smokey Row Road oat
Original Contract Amount 583,765.77
Current Change Order Amount 5,586.00 Percent: 0.957
Total Previous Approved Changes 5,465.00 Percent: 0.936
Total Change To -Date 11,051.00 Percent: 1.893
Modified Contract Amount 594,816.77
Time Extension Information
Date Initiated 00 /00 /0000 Date Completed 00 /00 /0000
Original Contract Time SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0
SP Date 00 /00 /0000 or SP Days
(SS Standard Specification, SP Special Provision)
Time Element Description:
Current Time Extension SS Days 0 SP Days 0 SP Days Value 0.00
Previous Time Approved SS Days by AE: DCE: SCE: DDCM:
SS Days SP Days Value
Revised Contract Time SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0
SS Date 00 /00 /0000 or SP Days 0
p
jf p
at *COED
DOG `y
r,
Contract No:R -29657 Change Order No.: 003
INDIANA Department of Transportation Page: 2
Construction Change Order and Time Extension Summary
Review and Approval Information
Required Approval Authority AE: DCE: SCE: DDCM:
($perChangeOrder) LE$ 250K- LE$750K- LE$2M— GT$2M
(Days per Contract) (50 SS days 100 SS days 200 SS Days GT 200 SS days)
Verbal Approval Required? Y N If Y, by Date Issued
Total Change To- Date >5 Y N if Y Copy to Program Budget Manager
Scope /Design Recommendation Y N If Y, Referred to Project Manager(PM)
Required?
Date to PM Date Retumed
Approval Authority Concurs with PM? Y N If Y, Concurrence by Date
If N,Resolution: Approved Disapproved
Resolved by Date
LPA Signatures Required? Y N If Y, Date to LPA Date Retumed
FHWA Signatures Required? Y N If Y, Date to FHWA Date Returned
Field Engineer Recommendation (Required for SCE or DDCM Approval)
Field Engineer Date
Comments:
Contract No:R -29657 INDIANA Date:05 /05 /2011
Change Order No:003 Department of Transportation Page: 3
Contract: R -29657
Project: 0600390 State:0600390
Change Order Nbr: 003
Change Order Description: Maintenance of Traffic Smokey Row Road
Reason Code: CHANGED COND, Construction Related
CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change
0086 0600390 0086 801 -06775 LS 5,586.000 1.000 C Amount:$ 5,586.00
Item Description: MAINTAINING TRAFFIC
Supplemental Descriptions: Maintenanace of Traffic was added to project as discussed
Supplemental Description2: at the Pre Construction Meeting.
Total Value for Change Order 003 5,586.00
Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended.
General or Standard Change Order Explanation
Maintenance of Traffic was added on Smokey Row Road as discussed at the Pre Construction meeting. This is to do work along Smokey Row
Road.
Change Order Explanation for Specific Line Item
MM. •Hink 4HHHHffHfH Ns* fHHHHHff•H4H4HHHHH4H4H
It is the Intent of the parties that this change order is full and complete compensation for the work describe above.
Notification and consent to this change order is hereby acknowledged.
Contractor: Signed By:
Date:
HfHHHH4HMfff4H4HH f1HHfHfeor........ HfHfHlH4HlfHfHHf4tff41H •HHHHH44fHH•Hf
NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system.
Contract No:R -29657 INDIANA Date:05 /05/2011
Change Order No :003 Department of Transportation Page: 4
H. HMHH ..H.M..H.H...MIHM.M.M..M.H..H H H. M4.. MM.. H. Hi. H.MH M...H
APPROVED FOR LOCAL PUBLIC AGENCY
27/27lL. 6/TY C-04ri 5 91n
(SIGNATURE) (TITLE) (D E)
(SIGNATURE) (TITLE) (DATE)
SUBMITTED FOR CONSIDERATION
PE /S
H .HH....M.M..HH..HMM......H
APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION
Approval Level Name of Approver Date Status
George R. Harvey Son, Inc.
t Aw
r yea
R HA y 964 N. State Road 39
-�.g '411-1.1 ilk
.j I Danville, IN 46122
L -i��4� Office 317.745.5]69
"V' T z �.;��';1�. Fax 317.745.2733
Tuesday, April 26, 2011
Rob Surber
Butler, Fairman and Seufert, Inc.
8450 Westfield Road
Suite 300
Indianapolis, IN 46240
RE: INDOT Contract No. SR- 32797 -A; Maintaining Traffic Revision
Rob,
For maintenance of traffic revision on Smokey Row Road we propose $5,586.00. This
pricing is based on using 28" Traffic Cones in lieu of Traffic Barrels. Please review
attached backup for details.
Cordially
Richard A. Harvey VP
Y AN EQUAL OPPORTUNITY EMPLOYER
Maintaining Traffic
Approx. 1,168.5 LFT needing 28" traffic cones, placing traffic cones every 25 LFT 50
traffic cones.
28" Traffic Cones rent for $0.30/Day X 10% (Markup) $0.33/Day
Project duration 6 Months
Material Cost
(3 months) X (4 weeks) X (7 days) 84 Days
84 Days X $0.33/Day X 50 Traffic Cones $1,386.00
Labor Cost
(8 weeks) X (5 days) X (2 hours) X $70 /Hour $5,600.00
25% of $5,600.00 $1,400.00
$5,600.00 $1,400.00 $4,200.00
Total Cost $5,586.00
Follow up issues Page 1 of 1
Follow up issues
Littlejohn, David W [diieejohn @carmel.in.gov]
Sent: Friday, April 29, 2011 1:55 PM
To: Robert Surber
Attachments: CO_ 2_Greyhound_trail.pdf (57 KB) bridge_deck_and_curb.pdf (109 KB) DSCN1494.JPG (401 KB) DSCN1499.JPG (385 KB)
retaning_wall conf.pdf (268 KB)
Rob,
I was able to meet with Mike M and discuss the project after our meeting. Attached is a signed CO. We are also comfortable with
the most recent proposal for the traffic maintenance.
I confirmed the bridge deck colors and have attached a scan of the approved colors for the deck and curb (the deck color is the
"Dark Gray" and the curb is the only gray that was provided in their samples). If you need more detail on these, please let me
know. If you need to pick them up, I can leave them at our front office.
For the trusses, we agreed that the best option is cutting the floor beams and are comfortable moving ahead with the quoted
price.
For the retaining walls, I have attached a couple of pictures of the walls that were built for the Hagan Burke Trail. I think it is best
to keep the walls similar to the existing wall. The closest fit that 1 saw in the brochure Harvey provided was the Allan Block AB
Classic Champagne wall. I attached a scan of the page for your reference.
I think that covers everything we discussed this morning, but if I missed something or you need anything else please feel free to
contact me.
I will be out of the office until Thursday, the
David Littlejohn, AICP
Alternative Transportation Coordinator
Department of Community Services
City of Carmel
One Civic Sq
Carmel, IN 46032
(317) 571 -2306
Please consider the environment before printing this e-mail
https //bfsnt6.bfsengr.com/owa/ ?ae= Item &t IPM. Note& id= RgAAAAAtiGCV x sgkQ41fDRhPmMenBwCYK... 5/5/2011