HomeMy WebLinkAboutGeorge Harvey Construction/CO2/ENG/Cool Creek Trails/inc. 4,465 Contract No :R -29657 Change Order No.: 002 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -29657 Letting Date:02/09/2011 District:GREENFIELD DISTRICT AE:Goldner, Rob PE /S:Surber, Rob Status :Draft Change Order Information Change Order No.: 002 EWA: Y or Force Acct: N Date Generated: 00/00/0000 Date Approved: 00 /00 /0000 :800 Reason Code: ERRORS OMISSIONS, Quantity Related A Description: NO. pay Item for #2 Stone for Undistributed Quantities Original Contract Amount 583,765.77 Current Change Order Amount 0.00 Percent: 0.000 Total Previous Approved Changes 0.00 Percent: 0.000 Total Change To -Date 0.00 Percent: 0.000 Modified Contract Amount 583,765.77 Time Extension Information Date Initiated 00 /00 /0000 Date Completed 00 /00 /0000 Original Contract Time SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0 SP Date 00 /00 /0000 or SP Days (SS Standard Specification, SP Special Provision) Time Element Description: Current Time Extension SS Days 0 SP Days 0 SP Days Value 0.00 Previous Time Approved SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value Revised Contract Time SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0 SS Date 00 /00 /0000 or SP Days 0 Contract No:R -29657 Change Order No.: 002 INDIANA Department of Transportation Page: 2 Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority AE: DCE: SCE: DDCM: per Change Order) LE$ 250K-)(- LE$750K- LE$2M-- GT$2M (Days per Contract) (50 SS days 100 SS days 200 SS Days GT 200 SS days) Verbal Approval Required? Y N If Y, by Date Issued Total Change To- Date >5 Y N If Y Copy to Program Budget Manager Scope /Design Recommendation Y N If Y, Referred to Project Manager(PM) Required? Date to PM Date Returned Approval Authority Concurs with PM? Y N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y N If Y, Date to LPA Date Returned FHWA Signatures Required? Y N If Y, Date to FHWA Date Returned Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract No:R -29657 INDIANA Date:04/27/2011 Change Order No:002 Department of Transportation Page: 3 Contract: R -29657 Project: 0600390 State:0600390 Change Order Nbr: 002 Change Order Description: NO. pay Item for #2 Stone for Undistributed Quantities Reason Code: ERRORS OMISSIONS, Quantity Related CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change 0085 0600390 0085 205 -09543 TON 44.650 100.000 C Amount:$ 4,465.00 item Description: NO 2 STONE Supplemental Descriptionl: NO. 2 Stone for Construction Entrances Supplemental Description2: Total Value for Change Order 002 4,465.00 Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. Change Order Explanation for Speclflc Line Item 11fH1HHH H111f1H1HtH HH1H111f1f iH1t1fHH1HHHH }H1H H1H11fH HiHH f1111111ff It is the intent of the parties that this change order Is full and complete compensation for the work describe above. Notification and consent to this change order is hereby acknowledged. Contractor: Signed By: Date: HtHH1111f.H11111111fM1H1f 1HtHHH H1H1 f1HHt H111 HH111 Htt1 HHYHHHHR H11t1H11f1H11111t11f11HH1ffIHHf NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. Contract No:R -29657 INDIANA Date:04 /27/2011 Change Order No:002 Department of Transportation Page: 4 H.......... »H.H ».ff.f it »t... »•..H•.f »a.H•H »f »H.t.. H1••» H..H.H•H•H.H.a..Ha H»•».t APPROVED FOR LOCAL PUBLIC AGENCY 7 //1 L Awl- 21 2Dl1 (SIGNATURE) (TITLE) (DATE) (SIGNATURE) (TITLE) (DATE) SUBMITTED FOR CONSIDERATION PETS Hs .H..t. »H »N.•»H•H. »H HHH.» »H*»...i. APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Approval Level Name of Approver Date Status